ZDROJOVÝ PODKLAD
Uložený text
https://drive.google.com/uc?export=download&id=1yQPrIg9bkLEJQNy7lgBagBfhDJcItqzY ↗SQAM- Rev. 00 |Page. 1
SQAM- Rev. 00 |Page. 2
Contents
1. Introduction .......................................................................................................................................................................... 3
2. Definitions, acronyms and abbreviations .......................................................................................................... 4
3. Basic Requirements ......................................................................................................................................................... 6
4. Supplier Approval Process ...........................................................................................................................................8
5. Product Qualification ..................................................................................................................................................... 11
6. Process control .................................................................................................................................................................. 18
7. Packaging and Labeling ........................................................................................................................................ 20
8. Quality events (NC, problem solving, recalls) ................................................................................................ 20
9. Deviation Request .......................................................................................................................................................... 22
10. Supplier Performance and Corrective Actions ........................................................................................ 23
11. Contact List and Compliance Matrix .................................................................................................................. 24
SQAM- Rev. 00 |Page. 3
1. Introduction
1.1. Taiga
Taiga Motors Inc (below “TAIGA”) was founded in 2015 by a group of engineers that believed
there shouldn’t exist a compromise between exhilarating powersport pursuit and
sacrificing the environment. Be it carving through powder, across lakes or along dirt trails
nothing beats instant torque at your fingertips, silent speed and fresh air.
1.2. Vision
Pioneering Off-Road Electrification
1.3. Mission
Taking on one of the most challenging vehicle segments to electrify, TAIGA has pushed the
frontiers of electric technology to achieve the extreme power, weight and thermal
specifications required to outperform the high performance but polluting 2-stroke
engine. The result is the world’s first electric powertrain designed from the ground up that
is faster, more reliable, more efficient & better connected to every season, and the first line
of fully electric recreative vehicles.
1.4. Values
We seek to be a global company, recognized for its competitiveness, excellence, and
innovation in off-road vehicles, all within a framework of the highest standards of integrity.
The result is the world’s first electric snowmobile, designed based on the following values:
- Safety
- Innovation
- Customer Experience Focus
- Trust & Collaboration
- Respect & Responsibility
1.5. Approach
This manual defines the minimum quality requirements for TAIGA Suppliers or TAIGA
Partners to ensure that the product complies with TAIGA customers’ regulatory and safety
requirements. These requirements are set out according to the ISO 9001 standard and
TAIGA specific requirements.
1.6. Responsibility of Suppliers
TAIGA recognizes the very important role our Suppliers have in the value we offer our
customers. As an extension of our own operations, we rely on our Suppliers to provide
material, products, and services which meet all the requirements of TAIGA products,
applicable specifications, and the quality management requirements outlined herein.
It is the responsibility of each Supplier to comply with the requirements of this Supplier
Quality Assurance Manual and associated documents referred to throughout the text
unless a special agreement is made between the TAIGA SQA coordinator and the Supplier.
SQAM- Rev. 00 |Page. 4
2. Definitions, Acronyms and Abbreviations
The words “shall”, or “must”, indicate a mandatory requirement.
The word “should” indicates a mandatory requirement with some flexibility allowed
in the method of compliance.
The term "Supplier" refers to the contractual part of TAIGA’s suppliers and their
subcontractors. In some cases, the Supplier can also be the manufacturer.
Acronyms and abbreviations
ITEM DESCRIPTION
8-D Eight Discipline problem solving
AIAG Automotive Industry Action Group
APQP Advanced Product Quality Planning
CAD Computer-Aided Design
Cpk Process Capability Index
FAI First Article Inspection
MSA Measurement System Analysis
OEE Overall Equipment Effectiveness
D/P-FMEA Design/Process Failure Mode and Effect Analysis
PO Purchase Order
PM Project Management
PPAP Production Part Approval Process
R&R Repeatability and Reproducibility
RPN Risk Priority Number
S/N Serial Number
SPC Statistical Process Control
AAR Appearance Approval Report
Benchmarking Improvement tool to measure performance or process against other
companies’ best practices
Containment Immediate short-term Supplier actions
Control Plan Documented description of the process for controlling the product
Corrective Action (CA) Permanent, documented, systemic corrections to the failed processes
Design for Simultaneous engineering process designed to optimize the relationship
Manufacturability and between design function, manufacturability, and ease of assembly.
Assembly (DFM/DFA)
SQAM- Rev. 00 |Page. 5
Failure Modes and Systematic activities intended to recognize and evaluate the potential
Effects Analysis failure of a product, and the effects and causes of that failure, identify
(FMEA) actions that could eliminate or reduce the chance of the potential failure
occurring, and document the process.
Table 1: Acronyms and abbreviations
Revision History:
Revision Date Responsible Description of changes
00 2021-10-13 David Maltais First emission
01 2022-09-08 David Maltais Comment added in section 3.3 to take special
machining tolerances into account.
SQAM- Rev. 00 |Page. 6
3. Basic Requirements
Critical and Special Quality Technical
Requirements Requirements Requirements
3.1. Critical and Special Requirements
Definition
Critical Characteristics related features are designated by the presence of the symbol [CC]
next to the feature on the drawing or in a specification, to indicate that the feature has the
potential to affect government, safety and environmental regulations and/or can lead to
injuries to vehicle operators, passengers, other travelers, passers-by or maintenance
personnel. If any feature of a part is considered as a critical characteristic, the part is a critical
part.
Special Characteristic related features are designated by the presence of the symbol [SC]
next to the feature on the drawing or in a specification, to indicate that it has the potential
to affect product’s function.
Due to the severity of these defined characteristics, it is a requirement that they be
appropriately stated and controlled within the applicable processes.
Related Documentation
Regarding dimensional, material, test and functional requirements for product features
identified as Critical Characteristic [CC] and Special Characteristic [SC], the following
requirements apply and supersede the general requirements:
o Critical AND Special Characteristics must be clearly identified throughout the
manufacturing process and in all associated documentation such as Process FMEA,
Control plans and Work Instructions
o Capability requirements for parts identified with [CC], [SC] and [PTC] (defined in
Section 6.4) characteristics are described below:
Characteristic Requirement
Cpk ≥ 1,67 Process under statistical control
Critical Characteristic [CC]
or
Electronic or automated poka-yoke
Effectiveness verified once per shift
TAIGA approved action plan for achieving
process control and capability
Cpk ≥ 1,33 Process under statistical control
Special Characteristic [SC]
or
Pass Through Characteristics [PTC] 100% inspection
(See section 6.4) TAIGA approved action plan for achieving process
control and capability
Table 2: CC and SC management
SQAM- Rev. 00 |Page. 7
Data records resulting from Statistical Process Control (SPC), automated checking, and
inspection results must be available for download upon request by TAIGA.
3.2. Quality Requirements
3.2.1. Quality Management System Requirements
All potential Prototype Suppliers are required to have a standard Quality Management
System based on the minimum requirements of ISO 9001.
All Production Suppliers must have a Quality Management System compliant to ISO 9001
as a minimum, with the objective of becoming IATF compliant. A copy of the valid
certification must be transmitted to TAIGA by the Supplier.
3.2.2. Conformity to Environmental Regulation
ISO 14001: TAIGA encourages Suppliers to develop a certification plan along the lines of ISO
14001 standard.
3.2.3. IMDS Requirement
Supplier shall complete an IMDS submission and achieve a complete status without
warning.
Supplier shall indicate IMDS number in Part Submission Warrant document. IMDS
information must be filed in through www.mdsystem.com . As IMDS covers the REACH
controlled substances, no additional REACH submission is required.
Suppliers shall provide an annual Conflict Minerals report (please visit the following website
for further details http://conflictminerals.aiag.org/). (Ref TAIGA IMDS ID: 234149)
3.2.4. RoHS
REACH compliance is required to sell products in the European Union, China, Korea and
some regions of the United States and Canada. It restricts the use of certain hazardous
substances in electrical and electronic equipment.
All components sourced by TAIGA and intended for production vehicles must have
documented compliance to RoHS.
3.3. Technical / Engineering Requirements
Supplier shall comply with all 6 requirements listed below. In the event of a conflict, the
more stringent requirement shall apply. If a conflict related to quality has mutually exclusive
requirements, the order of precedence from highest to lowest will be:
Supplier Commodity
PO or
GT&C 3D Model 2D Print Quality Specific
Contract
Manual Addendum
* For the purpose of GD&T, all dimensional information contained in the 3D model is basic
and the 2D has precedence for every feature that is driven by special machining tolerances.
SQAM- Rev. 00 |Page. 8
3.3.1.Technical Drawing, CAD and Geometric Tolerancing
Only products manufactured according to technical drawings approved by TAIGA will be
accepted. TAIGA technical drawings take precedence over any Supplier manufacturing
drawings. Also, TAIGA 3D files override 2D technical drawings specifications. It’s expected
that the Supplier has knowledge of Geometric Dimensioning and Tolerancing (GD&T) as
per the ASME Y14.5M-2009 Standard, to provide parts that are within the tolerances as per
TAIGA 2D technical drawings. It’s the Supplier’s responsibility to demonstrate the part’s
compliance to the GD&T tolerancing requirements by using the proper measurement
technique (e.g., Coordinate measurement machine).
3.3.2. Review of Technical Specifications
The objective of this process is to ensure that the Supplier has a full understanding of the
technical requirements related to the product. The Supplier must review all the technical
documents, standards, and specifications defining the product and fill the compliance
matrix to confirm that each requirement is understood and achievable. In the event where
a requirement isn’t understood or achievable, an action plan needs to be put in place. The
compliance matrix shall be sent by TAIGA buyer during the RFQ process.
3.3.3. Design Validation Planning and Reporting (DVP&R)
When applicable (requested by the agreed plan), the Supplier must develop and
implement a product test plan (DVP&R) that must be reviewed and approved by TAIGA
Project Representatives. Inputs for the test plan should include: DFMEA, engineering
specifications and any other TAIGA defined/supplied engineering requirements.
3.3.4. Design Failure Mode and Effects Analysis – DFMEA
Where applicable, design responsible Suppliers must develop and maintain a DFMEA
throughout the life of the product. DFMEA inputs should include warranty issues, customer
concerns, lessons learned, and address past 8D concerns.
3.3.5. Process Failure Mode and Effects Analysis – PFMEA
A PFMEA is an absolute requirement which must be developed and maintained
throughout the life of the product. PFMEA should also include inputs such as DFMEA,
warranty issues, customer concerns, lessons learned, and past 8D concerns.
4. Supplier Approval Process
Prototype Prototype
FAI and PO
NDA, GTC, SQAM RFQ Closed PO Supplier
Supplier Delivery
active
Prototype
Documenta Visit and On- Production
Production Prototype Supplier Supplier
tion Based Site Supplier
Active Initial
Supplier Assessment
Audit Assessment active
Indirect
Supplier RFQ Closed PO PO Delivery
SQAM- Rev. 00 |Page. 9
TAIGA has defined the following “Supplier Types” for the purpose of classifying its suppliers. It is
possible for a single organization to qualify as more than one (1) Supplier Type.
TYPE Definition Examples QMS *
Manufacturer A supplier who manufactures: Catalog Items ISO9001 or
a product which is designed by Hardware, fasteners IATF 16949
(Production or the supplier or Raw Materials
Prototype) a generic product in accordance Chemical products ISO 26262
with industry standards and Software (Software)
specifications
Subcontractor A supplier who manufactures products TAIGA part# No specific
or performs special processes in manufacturer requiremen
(Prototype) accordance with TAIGA engineering’s Build-to-print machine t
specifications shop
Subcontractor Processing house ISO9001 or
Surface / heat IATF 16949
(Production) treatments
Casting / machining
Distributor A supplier who purchases and resells Catalog Items ISO9001
products without processing the Hardware, fasteners
(Production or materials internally (apart from re- Commercial goods
Prototype) packaging, logistics, etc.) Chemical products
Indirect A supplier providing products, parts Contractors No specific
Products or and/or services in support of TAIGA’s Tools requiremen
Services industrial activities but not to be Consumables t
installed or integrated into TAIGA’s end Supplies
(Indirect) products
Laboratory A supplier providing laboratory services Calibration ISO17025
Testing
(Indirect) Analysis
Table 3: Supplier types
* Suppliers are required to implement and maintain a registered Quality Management
System (QMS) to support all applicable elements of the international standard, as defined
by the Supplier Type. QMS certification must be achieved via an accredited
Certification/Registration Body (e.g., accredited by ANAB or another equivalent, nationally
recognized accrediting body). Additional ISO14001 certification is encouraged throughout
TAIGA’s Supplier base.
4.1. Supplier Evaluation Process
TAIGA requires all Suppliers to be approved prior to the issuance of contracts. All Suppliers
must be approved by TAIGA Purchasing, regardless of approvals by customers or other
entities.
SQAM- Rev. 00 | P a g e . 10
Prototype Supplier:
Suppliers in this family can only supply prototype parts, which are not fully qualified and are
not intended to be used in the final product (production product). A prototype product is
an early sample, model, or release of a product built to test a concept or a process.
A prototype is generally used to evaluate a new design and does not necessarily use the
same material or process that will be used for the production part.
Production Supplier
Suppliers in this family can supply prototype AND production parts. They are fully qualified
and are intended to be used for final production products. A production product uses the
final material and the approved process and is approved to be used in the final version of
TAIGA products once the formal qualification process is completed.
Indirect and Service Supplier
Indirect and Service Suppliers provide TAIGA with products/services not directly related to
the production (for example: furniture, office products, detergents, facility maintenance,
manpower, assurance, IT services etc.).
4.2. Supplier Evaluation steps
The Supplier Evaluation and Approval Process includes the following steps:
a) Potential Supplier Initial Assessment
TAIGA will request the Supplier to provide a copy of its quality management system
certificate and complete a Potential Supplier Self-Assessment (PSA) of its business and
quality management system and capabilities, providing information related to the
following criteria:
Company profile
Management
Environment
Quality
Logistics
After market
Competence
Product development
Finance
Productivity
Sourcing
b) Documentation Audit
Once the Potential Supplier Self-Assessment (PSA) completed, the assigned Supplier
Quality Engineer will request all the relevant documented evidence related to the criteria
part of the PSA. The PSA review and the audit of the various documents enable the Supplier
Quality Engineer to determine if the Supplier’s quality management system meets TAIGA
requirements.
c) On-Site Assessment
Generally, when a Supplier is IATF 1694 / ISO TS 16949 certified by an accredited certification
body, TAIGA will not conduct an on-site assessment of the Supplier’s quality management
system against the same criteria. However, TAIGA, due to product/process complexity or
SQAM- Rev. 00 | P a g e . 11
criticality, may elect to conduct on-site assessments of Supplier products or process
capabilities (Process Audit – PA). As a result, findings may be issued.
These assessments could include:
Quality Management System (QMS)
Business and Manufacturing Operations
Continuous Improvement Initiative
Technology Assessment
Sub-Tier Supplier Control
4.3. Supplier Status
Based on the Supplier evaluation steps, a Supplier can be in one of the below statuses:
Supplier Status description:
UNDER EVALUATION: The Supplier is under evaluation to verify if it can be part of TAIGA
Supplier panel
ACTIVE: The Supplier is fully qualified and is currently a partner of TAIGA in all supply
chain activities
NBH: New Business Hold – major problems occurred and no clear action plan active to
solve them
OBSOLETE: The Supplier is obsolete. No business possible until a new evaluation is
completed.
Type Receive RFI/RFQ Proto/sample delivery Production
delivery
Under Evaluation yes yes no
Active yes yes yes (*)
NBH no Waiver needed yes
Obsolete no no no
Table 4: Supplier status
(*) Active Suppliers can deliver production parts only after part approval in any case
5. Product Qualification
Prototype
Part
Part Delivery
CAD files and Technical
FAI and QC by Part is Accepted
Requirements
TAIGA
Production
Part
APQP
CAD Files and Special Part Delivery
Process PPAP Part is
Technical Processes and QC by
Requirements (When Submission Accepted
Approval TAIGA
requested)
SQAM- Rev. 00 | P a g e . 12
5.1. Prototype Product Qualification: Documentation Approval
First Article Inspection (FAI)
As a minimum, a First Article Inspection (FAI) is required to initially qualify a prototype
part/process for Supplier approval, unless the PPAP process (below) is used instead. In the
event where an IATF certified supplier produces prototype parts, he shall submit a Level 4
PPAP package.
Furthermore, a new FAI may be requested if there is an extended gap of time since last
production. The FAI requires that all features and characteristics on the design specification
and control plan be inspected and verified prior to production1. TAIGA FAI form, or other
convenient and equivalent document may be used.
5.2. Product Qualification for Production
This section defines the generic requirements for production part qualification and
approval. The purpose is to determine if all TAIGA design and specification requirements
are properly understood by the Supplier and that the manufacturing processes have the
capability to consistently meet these requirements.
5.2.1. Advanced Product Quality Planning (APQP)
When requested, Supplier shall implement and develop a detailed Advanced Product
Quality Plan for the development of processes used to produce a specific part or family of
part. The AIAG publication “Advanced Product Quality Planning (APQP) and Control Plan”
should be used as a reference when developing these plans. These plans should also include
the TAIGA specific requirements presented in the current document. APQP identifies the
tasks to be completed, the expected timing, assigned responsibility for completion and the
critical path.
The objective of the planning process is to deliver the project on time, at the right cost and
at the highest level of quality. The initial development of the APQP should begin upon
receipt of the Request for Quotation (RFQ). This initial plan should be included as part of the
RFQ response package.
The Supplier is responsible for obtaining the latest revision of the applicable AIAG core tool
reference manuals and forms (see Applicable Documents section for where these
references may be obtained).
The AIAG Core Tools Manuals are:
Advanced Product Quality Planning (APQP) and Control Plan
Production Part Approval Process (PPAP)
Potential Failure Mode and Effects Analysis (FMEA)
Measurement Systems Analysis (MSA)
Statistical Process Control (SPC)
1
For First Article Inspection guidance, see AIAG PPAP Manual (Appendix C, D, & E) – Production Part Approval
Process (available from www.aiag.org).
SQAM- Rev. 00 | P a g e . 13
APQP Timing
Suppliers of parts supported by the APQP are required to report the project status at
established intervals during the project development. As a general rule, reviews are held
prior to each of the project milestones or drawing revision releases. Suppliers should
prepare for these project review meetings by completing or updating the APQP review
template, their project plan and the project milestone dates. Suppliers can access the APQP
review templates on TAIGA website.
APQP Samples
The Supplier shall provide the samples according to the APQP timing plan agreed with
TAIGA, and make sure the samples will meet the quality requirements for each milestone.
The Supplier shall submit the APQP documents (and, eventually, the PPAP) on time as
TAIGA required. TAIGA will review the documents based on the ISO 9001, IATF 16949 or AIAG.
If there is any issue or timing delay for the APQP documents, TAIGA releases a Supplier
complaint according to the risk and requires root cause analysis and improvement report
to avoid other occurrences.
5.2.2. Special Processes Documentation approval
For TAIGA, the following processes are managed as special processes as defined in the ISO
9000 standard:
Process
Surface treatment (coating, plating, etc.)
Casting
Metallurgy
Plastics
Electrics and Electronics
Adhesive
Table 5: Special processes in scope
SQAM- Rev. 00 | P a g e . 14
Supplier is responsible to follow the requirements indicated in the purchase order. All first
part shipment must be approved by TAIGA. Shipping approval must follow the following
steps:
Supplier and TAIGA agree on the specific tests and components part of the test plan
Supplier performs the final inspection on one sample part (destructive test if applicable)
Supplier must send the test results documents to TAIGA for approval
TAIGA will analyze the documents and will inform the Supplier if the parts can be
shipped
After the reception of the shipment approval, the Supplier cand send the parts
5.2.3. Production Part Approval Process (PPAP)
The Supplier shall submit to TAIGA a Production Part Approval Process (PPAP) level 3
submission package. The Supplier is responsible for obtaining the latest revision of the
applicable AIAG core tool reference manuals and forms (see Applicable Documents section
for where these references may be obtained).
PPAP defines the approval process for new parts, revised parts, or parts produced from new
or significantly revised production methods. The PPAP process consists of 18 elements that
may be required for approval of production level parts. The PPAP manual contains detailed
information, guidelines and sample documents useful for completing the process
requirements. The Production Part Approval Process (PPAP) demonstrates that the
manufacturing process used to produce parts is fully developed, thoroughly tested, and
capable of serial production of parts conforming to the technical specifications.
Every PPAP package must be sent to QUALITY@taigamotors.ca to be assigned to the
proper SQE and be reviewed.
Unless exempted by an approved Waiver from TAIGA, Suppliers may not ship the first batch
of production parts without an approved Part Submission Warrant (PSW) document signed
by TAIGA representative.
PPAP Submission Levels
The PPAP submission requirements are normally divided into five classifications or levels,
as follows:
Level 1 – Part Submission Warrant (PSW) only, submitted to TAIGA Quality
Level 2 – PSW with product samples and limited supporting data
Level 3 – PSW with product samples and complete supporting data
Level 4 – PSW and other requirements as defined by the customer
Level 5 – PSW with product samples and complete supporting data available for review
at the Supplier’s manufacturing location
SQAM- Rev. 00 | P a g e . 15
Submission Level
Level Level Level 3 Level Level
1 2 (Default) 4 5
1 Design Record (2D Drawing) R S S * R
2 Engineering Change Documents (if any) such as R S S * R
ECO/ECP
3 Engineering Approval if required R R S * R
4 DFMEA N/A N/A N/A N/A R
5 Process Flow Diagram R R S * R
6 PFMEA R R S * R
7 Control Plan R R S * R
8 Measurement Systems Analysis (GR&R) R R S * R
9 Dimensional Report R S S * R
10 Material/Performance/Functional Test Results R S S S R
11 Initial Process Studies (Short-term Capability R R S * R
Study)
12 Qualified Laboratory Documents R R S * R
13 Appearance Approval Inspection Report S S S * R
14 Sample product R S S * R
15 Master Sample R R R * R
16 Checking Aids R R R * R
17 Customer Specific Requirement compliancy R S S S S
18 Parts Submission Warrant (PSW) S S S S S
Table 6: Documents to submit
S – The Supplier will submit documentation and retain copy of records or documentation items at appropriate
locations
R – The Supplier shall retain at appropriate locations and make available to TAIGA upon request.
“*” The Supplier shall retain at appropriate location and submit to TAIGA upon request.
Elements of PPAP
Below is the list of all 18 elements accompanied by a brief description for each element:
Design Documentation
Design documentation shall include both customer and the Supplier’s drawings.
Engineering Change Documentation
If the PPAP is required due to a request for a change to a part or product, the
documentation requesting the change must be included in the PPAP package. This
documentation usually consists of a copy of the Engineering Change Notice (ECN).
(Customer) Engineering Approval
This documentation usually consists of a copy of the Engineering Change Notice (ECN),
approved by the customer engineering department.
Design Failure Mode and Effects Analysis
Design Failure Mode and Effects Analysis (DFMEA) is a cross-functional activity that
examines design risks by exploring the possible failure modes and their effects on the
SQAM- Rev. 00 | P a g e . 16
product or customer and their probability to occur. The DFMEA is a living document that
should be reviewed and updated on a regular basis.
Process Flow Diagram
The Process Flow Diagram clearly describes the production process and its sequence in a
graphical manner.
Process Failure Mode and Effects Analysis
Process Failure Mode and Effects Analysis (PFMEA) reviews all the steps of the production
process to identify any potential failure of a process and evaluate the risk in terms of severity,
occurrence, and probability to detect failure.
Control Plan
The Control Plan is an output from the PFMEA. The Control Plan lists all product Critical and
Special Characteristics and inspection methods required to deliver products that
continually meet the customer quality requirements.
Measurement System Analysis Studies
Measurement System Analysis (MSA) studies include Gage Repeatability & Reproducibility
(R&R) studies on measurement equipment used during assembly or quality control checks.
Calibration records for all gages and measurement equipment must be included.
Dimensional Results
Each dimension on the drawing is measured on the final assembly to make sure that it falls
within specification. The results are recorded in a spreadsheet and included within the
PPAP submission, a total of 5 units must be included in the dimensional report.
Records of Material / Performance Tests
This element should contain a copy of the Design Verification Plan and Report (DVP&R). The
DVP&R is a summary of every validation test performed on the part. It should list each test
performed and its result. This section shall also include material certificate when applicable.
Initial Process Studies
Initial process studies include Statistical Process Control (SPC) charts for the Critical and
Special Characteristics of the product. These studies must demonstrate that the critical
processes are stable, have normal variation and are running near the intended nominal
value.
Qualified Laboratory Documentation
Qualified laboratory documentation consists of the industry certifications for any inhouse
or outsourced lab that was involved in completing validation testing.
Appearance Approval Report
The Appearance Approval Report (AAR) is applicable for components affecting appearance
only. This report validates that the final product appearance requirements are as per
specifications. Requirements include but are not limited to color, grain, textures, etc.
SQAM- Rev. 00 | P a g e . 17
Sample Production Parts
Sample production parts are sent to the customer for approval and are typically stored at
either the customer or Supplier’s site. A picture of the production part is usually included in
the PPAP documentation along with documentation regarding the part location.
Master Sample
A master sample is a final sample of the product that is inspected and signed off by the
customer. The master sample part is used to train operators and serves as a benchmark for
comparison to standard production parts if any quality questions arise.
Checking Aids
This is a detailed list of checking aids used by production. It should include all tools used to
inspect, test or measure parts during the assembly process. The list should describe the tool
and have its calibration schedule. Checking aids may include check fixtures, contour,
variable and attribute gages, models, or templates. MSA may be required for all checking
aids based on customer requirements.
Customer Specific Requirements
This element of the submission package relates to all the customer specific requirements.
For bulk materials, the customer specific requirements shall be recorded on the “Bulk
Material Requirements Checklist”.
Part Submission Warrant
The Part Submission Warrant (PSW) form is a summary of the entire PPAP submission. A
PSW is required for each part number unless otherwise stated by the customer.
5.2.4. PPAP and PSW approval
a) Approved
Approved indicates that the part or material, including all sub-components, meets all
customer requirements. The organization is therefore authorized to ship production
quantities of the product.
b) Interim Approval
Interim Approval permits shipment of material for production requirements on a limited
time or piece quantity basis. Interim Approval will only be granted when the organization
has submitted a deviation form that was approved by TAIGA.
c) Rejected
Rejected means that the PPAP submission does not meet customer requirements. In such
cases, the submission and/or process shall be corrected to meet customer requirements.
The submission shall be approved before production parts may be shipped.
5.2.5. New PAPP submission
The Supplier shall submit a notification form to TAIGA for any of the following pending
changes:
o Use of different material that was used on the previous approved PPAP
o Production from new or modified tooling
o Location / layout change
SQAM- Rev. 00 | P a g e . 18
o Use of different production or test equipment than the one qualified on the previous
approved PPAP
o Change of subcontractor for material, parts or services
Based on the analysis of the notification form, the Supplier shall be asked to submit a
revised PPAP for TAIGA approval PRIOR to beginning of production shipment from the
approved changes.
Annual Requalification
To certify the components and raw materials delivered, a dimensional inspection is required
each year following PPAP approval.
6. Process control
6.1. TAIGA Specifications
TAIGA documentation such as Drawings and Engineering Specifications must be reviewed,
understood and agreed upon by the Supplier, prior to launch. It is required that a bubble
print is created by the Supplier, which identifies ALL characteristics, for example, Diameter,
Depth, Angle, etc., and are individually numbered and referenced throughout the process
(PFMEA, Control Plan, Work Instructions, Process Plans, etc.).
6.2. Documentation and Data Control
The Supplier shall control all documents and records relating to the purchase order,
including technical drawings, specifications, engineering changes, work instructions,
manufacturing processes, manufacturing operation sheets, scheduling and quality control
plans, as applicable.
6.3. Record Control and Retention
The Supplier shall maintain records of inspections, dispositions, test results and corrective
actions to prove that these operations have been performed for a minimum period of ten
(10) years after the part becomes inactive.
6.4. Pass Through Characteristics (PTC) Requirements
Pass Through Characteristics (PTC) are product characteristics that are created or revealed
during the process and have little to no chance of being detected prior to reaching the
customer. Such characteristics will affect fit, form or function at some point.
Each PTC should be identified in both the PFMEA and Control Plan under the Special
Characteristic/Classification column and identified by the by the [PTC] notation on the
drawing. These characteristics should have a defined inspection method and frequency
described in the Control plan. Even if these PTC characteristics are introduced at a sub-tier
supplier level, the tier 1 supplier shall manage the characteristic (See section 3.1).
6.5. Error and Mistakes Proofing
Whenever possible, TAIGA advocates the implementation of error-proofing methodology
during planning and problem resolution to prevent manufacture of non-conforming
products, especially for repetitive functions, difficult tasks prone to mistakes, or where the
cost of error is high.
SQAM- Rev. 00 | P a g e . 19
6.6. Work Instructions
The Supplier shall prepare documented work instructions, as necessary, for all employees
having responsibilities for the operation of processes that impact product quality. These
instructions shall be maintained current and accessible for use at the workstation.
6.7. Control Plan
When APQP or PPAP applies, control plans are required for production phase. Like the
FMEA’s, Control Plans are living documents and are expected to be reviewed and updated
as process or product changes.
6.8. Job Set-Up Verification
Verification of product is required any time that a job is set-up, changed over or out of
production for a stated period. The supplier is to verify first piece and in the event of multiple
changeovers, last-off inspection is a recommended practice.
6.9. Control of Monitoring and Measuring Devices
Measuring equipment shall be calibrated and verified (validity of results) at specified
intervals, or prior to use, against measurement standards traceable to international or
national measurement standards; when no such standards exist, the basis for calibration
shall be recorded.
6.10. Reworking of Faulty Parts
Reworking faulty parts that are noticed either during our production or as part of a
complaint must only be carried out in agreement with the TAIGA quality management and
must be clearly labeled as reworked parts in each part/bag/box before delivery. This
approach should be part of the reaction plan in the control plan.
6.11. Preventative & Predictive Equipment Maintenance (PM)
To support capacity and quality requirements, it is a necessity that suppliers develop a
planned preventive maintenance system to optimize OEE, process variation and process
capability by minimizing unplanned downtime. As part of the PM program, suppliers
should document and review PM actions.
6.12.Product-Related with Embedded Software
Suppliers furnishing product-related software with embedded software shall implement
and maintain a process for software quality assurance of their products.
An assessment process based on ISO 26262 will be utilized to assess supplier’s software
development process. Using prioritization based on risk and potential impact to TAIGA,
Suppliers shall retain documented information of a software development capability self-
assessment.
SQAM- Rev. 00 | P a g e . 20
7. Packaging and Labeling
7.1. Handling, storage, and packaging
The supplier shall have a written process in place to ensure that in-process handling,
product identification, storage, preservation, packaging of product including relevant
documentation to ensure traceability, storage of material and delivery will prevent damage,
deterioration, contamination, substitution, or misuse of material.
PACKAGING
Every packaging design shall be approved by TAIGA representative. Suppliers should
provide expendable packaging or returnable containers, where appropriate, that provide
for sufficient density and protection from any likely damage that may occur. Expendable
materials and packaging must meet local and national standards for safe disposal and/or
recycling.
LABELING
Labeling and bar code requirements may vary. The TAIGA representative will provide the
Supplier with the relevant specifications. As a bare minimum, the labelling should include
the following information to ensure traceability: Part number (with revision), Supplier name
and Production batch number.
7.2. Identification and traceability of parts, box, shipments
Marking of finished products shall be performed in accordance with the TAIGA instruction.
All boxes must be identified with a label as per TAIGA’s specification: Supplier requirements
– box labelling (SQLF-001 Rev 002).
7.3. Material certification/raw material
When requested by TAIGA, Material certification is compulsory with each shipment and
should include the material test certificate as well as the technical data sheet. The use of a
substitute material is not permitted unless authorized by the TAIGA engineering
department.
7.4. Tool Marking
All Tools and Gauges, property of TAIGA, must be properly and permanently identified by
the Supplier according to TAIGA requirements. The identification is to contain the following
information: Property of TAIGA, Tool Number, Part Number and Part Name. Suppliers are
required to upload significant pictures of the tooling and update their tooling inventory
information at PPAP to receive tooling payment.
8. Quality events (NC, problem solving, recalls)
Continual Improvement
Suppliers should define a process for continual improvement, such as ISO 9004, including
Annex B.
SQAM- Rev. 00 | P a g e . 21
8.1. Problem Solving Process
Suppliers should use a reliable close-loop problem-solving method to assess all the
nonconformities communicated by TAIGA. TAIGA does not strictly define which tool to use
and when: There may be specific cases when the TAIGA Quality Representative will require
a specific problem-solving tool.
For example (8D Report):
Step Description
1 Team approach Consult and coordinate with relevant stakeholders
2 Describe the Problem State what the problem “Is,” and “Is Not” with respect to what,
where, when, who, how, and how many. Use quantitative terms.
3 Containment Action Immediately contain any suspect product to protect TAIGA and its
customers.
4 Root Cause Verification Identify potential causes, analyze causes for failure mode, validate
root cause(s), and identify solutions.
5 Implement Corrective Implement solution. Document the corrective action: update
Action applicable FMEA, control plan and work instructions.
6 Verify Corrective Action Use check sheets, auditing, sampling, and/or control plans to
monitor process performance for effectiveness and sustained
improvement
7 Prevent Recurrence Implement changes to prevent the same type of error from
occurring in similar products/processes. Update applicable
documents
8 Congratulate the Team Review, approve, and support. Provide resources and team
recognition
Table 7: 8D approach description
8.2. Control of non-conforming products
Shipping of non-conforming materials to TAIGA is not permitted (unless explicitly
authorized) and, in any case, will directly affect the Supplier’s score card rating. Measures
shall be taken to ensure the Supplier’s future product conformance and control. The
Supplier is also responsible for their subcontractors’ conformance to requirements.
Containment
When a problem is discovered at the customer facility, the supplier will be notified
immediately and all suspect products must be contained at all locations including,
supplier/sub-supplier facilities, warehouses, parts in transit to the customer or other
locations, parts on customer production floor. Suppliers are expected to have a strong
written procedure for containment and control of non-conforming products.
TAIGA reserves the right to charge back all costs associated with supplier caused non-
conforming products, including return of material, loss of production, labor and
components, where applicable.
SQAM- Rev. 00 | P a g e . 22
Controlled Quarantine Area
All product which is suspect or non-conforming, for any reason, must be properly identified
and stored in a defined quarantined area, away from the production flow or shipping areas.
The Supplier must have a system and a procedure in place to manage parts in the
quarantine area.
Nonconformities
In the event non-conforming parts, the Supplier will be notified using a quality alert (QA).
The Supplier complaint related to any issue identified by TAIGA and TAIGA customers,
including quality issues, delivery issues, capacity issues, service issues of mass production
parts.
The Supplier’s response requirements for the quality alert are:
Fast response (Short term containment action) within 24 hrs
Root cause and actions (Long term action) within 5 days
Actions implementation and validation within 10 days
The time of implementation could be delayed based on the specific complaint upon TAIGA
approval.
Recalls
If TAIGA or any of its customers find or suspect that the products are defective, TAIGA will,
to the extent possible, notify the Supplier. Supplier shall fully cooperate with TAIGA in
implementing any recall programs and/or corrective and preventive action plans. Therefore,
the Supplier agrees to reimburse to TAIGA all the costs associated with the implementation
of corrective actions.
9. Deviation Request
A Supplier shall not knowingly ship products that deviates from the technical specifications.
If such a condition exists, the Supplier may ask TAIGA, in writing, to allow shipment of the
product under a written nonconformance deviation.
A Deviation request has a time limit, that shall be indicated in the document, based on
number of parts or period, up to a maximum of 3 (three) months.
If requested by the TAIGA Buyer, the Supplier must send samples of such nonconforming
items to TAIGA for evaluation. The cost of shipping, inspection, and testing will be evaluated
to determine the potential acceptability of such product will be charged to the Supplier.
The Supplier must start working immediately on corrective actions. In all cases, the Supplier
shall fully contain all products suspected of being nonconforming.
A copy of the TAIGA-approved deviation document must be included inside of each box.
SQAM- Rev. 00 | P a g e . 23
10. Supplier Performance and Corrective Actions
10.1. Supplier Quality Performance Evaluation:
Suppliers will be evaluated with two key indicators.
Quality (% Compliant parts)
This metric defines the Rejected percentage (%). The definition of “rejected parts” is the total
number of parts returned to the Supplier for any valid quality reason (including those
caused by shipping and administrative errors):
% Compliant parts = (1 − )𝑥100
Based on TAIGA’s expectations, the following table describes the resulting actions or various
% reject values.
% Compliant Category Comment
parts
> 99,9 Meets Meets all the requirements set by TAIGA
expectation
95 – 99,9 Good Satisfactory; no action required
80 - 95 Marginal Systemic corrective action may be required
< 80 Unacceptable Systemic corrective action is required and may require Supplier
to meet with TAIGA management representatives.
Table 8: Requirement for the % of compliant parts
Delivery (OTD)
This metric defines the delivery performance rating using the following formula: On Time
Delivery (OTD) is based on the contract date. The Supplier should systematically inform
TAIGA of any delay in delivering product and provide a new dispatch date. The Supplier is
responsible for additional transport costs due to delays.
% OTD= 𝑥100
% OTD Category Comment
> 98 Meet Meets all the requirements set by TAIGA
expectations
90 - 98 Good Satisfactory; no action required
80 - 89 Marginal Systemic corrective action may be required
< 80 Unacceptable Systemic corrective action is required and may require
Supplier to meet with TAIGA management representatives.
Table 9: Requirement for the % OTD
SQAM- Rev. 00 | P a g e . 24
11. Contact List and Compliance Matrix
Upon receipt and full reading of the contact list and compliance matrix document, the
supplier shall fill the contact list and acknowledge compliance to the various SQAM
requirements. In case of on-compliance, the supplier shall notify TAIGA by filling the
comment / action required column.
SQAM- Rev. 00 | P a g e . 25
[READING ORDER TEXT]
SQAM- Rev. 00 | P a g e . 1SQAM- Rev. 00 | P a g e . 2
Contents
1. Introduction..........................................................................................................................................................................3
2. Definitions, acronyms and abbreviations.......................................................................................................... 4
3. Basic Requirements.........................................................................................................................................................6
4.Supplier Approval Process...........................................................................................................................................8
5. Product Qualification.....................................................................................................................................................11
6.Process control..................................................................................................................................................................18
7. Packaging and Labeling........................................................................................................................................20
8.Quality events (NC, problem solving, recalls)................................................................................................20
9.Deviation Request..........................................................................................................................................................22
10. Supplier Performance and Corrective Actions........................................................................................23
11.Contact List and Compliance Matrix..................................................................................................................24SQAM- Rev. 00 | P a g e . 3
1. Introduction
1.1. Taiga
Taiga Motors Inc (below “TAIGA”) was founded in 2015 by a group of engineers that believed
there shouldn’t exist a compromise between exhilarating powersport pursuit and
sacrificing the environment. Be it carving through powder, across lakes or along dirt trails
nothing beats instant torque at your fingertips, silent speed and fresh air.
1.2. Vision
Pioneering Off-Road Electrification
1.3. Mission
Taking on one of the most challenging vehicle segments to electrify, TAIGA has pushed the
frontiers of electric technology to achieve the extreme power, weight and thermal
specifications required to outperform the high performance but polluting 2-stroke
engine. The result is the world’s first electric powertrain designed from the ground up that
is faster, more reliable, more efficient & better connected to every season, and the first line
of fully electric recreative vehicles.
1.4. Values
We seek to be a global company, recognized for its competitiveness, excellence, and
innovation in off-road vehicles, all within a framework of the highest standards of integrity.
The result is the world’s first electric snowmobile, designed based on the following values:
- Safety
- Innovation
- Customer Experience Focus
- Trust & Collaboration
- Respect & Responsibility
1.5. Approach
This manual defines the minimum quality requirements for TAIGA Suppliers or TAIGA
Partners to ensure that the product complies with TAIGA customers’ regulatory and safety
requirements. These requirements are set out according to the ISO 9001 standard and
TAIGA specific requirements.
1.6. Responsibility of Suppliers
TAIGA recognizes the very important role our Suppliers have in the value we offer our
customers. As an extension of our own operations, we rely on our Suppliers to provide
material, products, and services which meet all the requirements of TAIGA products,
applicable specifications, and the quality management requirements outlined herein.
It is the responsibility of each Supplier to comply with the requirements of this Supplier
Quality Assurance Manual and associated documents referred to throughout the text
unless a special agreement is made between the TAIGA SQA coordinator and the Supplier.SQAM- Rev. 00 | P a g e . 4
2. Definitions, Acronyms and Abbreviations
The words “shall”, or “must”, indicate a mandatory requirement.
The word “should” indicates a mandatory requirement with some flexibility allowed
in the method of compliance.
The term "Supplier" refers to the contractual part of TAIGA’s suppliers and their
subcontractors. In some cases, the Supplier can also be the manufacturer.
Acronyms and abbreviations
ITEM DESCRIPTION
8-D Eight Discipline problem solving
AIAG Automotive Industry Action Group
APQP Advanced Product Quality Planning
CAD Computer-Aided Design
Cpk Process Capability Index
FAI First Article Inspection
MSA Measurement System Analysis
OEE Overall Equipment Effectiveness
D/P-FMEA Design/Process Failure Mode and Effect Analysis
PO Purchase Order
PM Project Management
PPAP Production Part Approval Process
R&R Repeatability and Reproducibility
RPN Risk Priority Number
S/N Serial Number
SPC Statistical Process Control
AAR Appearance Approval Report
Benchmarking Improvement tool to measure performance or process against other
companies’ best practices
Containment Immediate short-term Supplier actions
Control Plan Documented description of the process for controlling the product
Corrective Action (CA) Permanent, documented, systemic corrections to the failed processes
Design for
Manufacturability and
Assembly (DFM/DFA)
Simultaneous engineering process designed to optimize the relationship
between design function, manufacturability, and ease of assembly.SQAM- Rev. 00 | P a g e . 5
Failure Modes and
Effects Analysis
(FMEA)
Systematic activities intended to recognize and evaluate the potential
failure of a product, and the effects and causes of that failure, identify
actions that could eliminate or reduce the chance of the potential failure
occurring, and document the process.
Table 1: Acronyms and abbreviations
Revision History:
Revision Date Responsible Description of changes
00 2021-10-13 David Maltais First emission
01 2022-09-08 David Maltais Comment added in section 3.3 to take special
machining tolerances into account.SQAM- Rev. 00 | P a g e . 6
3. Basic Requirements
3.1. Critical and Special Requirements
Definition
Critical Characteristics related features are designated by the presence of the symbol [CC]
next to the feature on the drawing or in a specification, to indicate that the feature has the
potential to affect government, safety and environmental regulations and/or can lead to
injuries to vehicle operators, passengers, other travelers, passers-by or maintenance
personnel. If any feature of a part is considered as a critical characteristic, the part is acritical
part.
Special Characteristic related features are designated by the presence of the symbol [SC]
next to the feature on the drawing or in a specification, to indicate that it has the potential
to affect product’s function.
Due to the severity of these defined characteristics, it is a requirement that they be
appropriately stated and controlled within the applicable processes.
Related Documentation
Regarding dimensional, material, test and functional requirements for product features
identified as Critical Characteristic [CC] and Special Characteristic [SC], the following
requirements apply and supersede the general requirements:
o Critical AND Special Characteristics must be clearly identified throughout the
manufacturing process and in all associated documentation such as Process FMEA,
Control plans and Work Instructions
o Capability requirements for parts identified with [CC], [SC] and [PTC] (defined in
Section 6.4) characteristics are described below:
Characteristic Requirement
Critical Characteristic [CC]
Cpk ≥ 1,67 Process under statistical control
or
Electronic or automated poka-yoke
Effectiveness verified once per shift
TAIGA approved action plan for achieving
process control and capability
Special Characteristic [SC]
Cpk ≥ 1,33 Process under statistical control
or
100% inspection
TAIGA approved action plan for achieving process
control and capability
Pass Through Characteristics [PTC]
(See section 6.4)
Table 2: CC and SC management
Critical and Special
Requirements
Quality
Requirements
Technical
RequirementsSQAM- Rev. 00 | P a g e . 7
Data records resulting from Statistical Process Control (SPC), automated checking, and
inspection results must be available for download upon request by TAIGA.
3.2. Quality Requirements
3.2.1. Quality Management System Requirements
All potential Prototype Suppliers are required to have a standard Quality Management
System based on the minimum requirements of ISO 9001.
All Production Suppliers must have a Quality Management System compliant to ISO 9001
as a minimum, with the objective of becoming IATF compliant. A copy of the valid
certification must be transmitted to TAIGA by the Supplier.
3.2.2. Conformity to Environmental Regulation
ISO 14001: TAIGA encourages Suppliers to develop a certification plan along the lines of ISO
14001 standard.
3.2.3. IMDS Requirement
Supplier shall complete an IMDS submission and achieve a complete status without
warning.
Supplier shall indicate IMDS number in Part Submission Warrant document. IMDS
information must be filed in through www.mdsystem.com . As IMDS covers the REACH
controlled substances, no additional REACH submission is required.
Suppliers shall provide an annual Conflict Minerals report (please visit the following website
for further details http://conflictminerals.aiag.org/). (Ref TAIGA IMDS ID: 234149)
3.2.4. RoHS
REACH compliance is required to sell products in the European Union, China, Korea and
some regions of the United States and Canada. It restricts the use of certain hazardous
substances in electrical and electronic equipment.
All components sourced by TAIGA and intended for production vehicles must have
documented compliance to RoHS.
3.3. Technical / Engineering Requirements
Supplier shall comply with all 6 requirements listed below. In the event of a conflict, the
morestringent requirement shall apply.If aconflict related toquality has mutuallyexclusive
requirements, the order of precedence from highest to lowest will be:
* For the purpose of GD&T, all dimensional information contained in the 3D model is basic
and the 2D has precedence for every feature that is driven by special machining tolerances.
GT&C
PO or
Contract
3D Model 2D Print
Supplier
Quality
Manual
Commodity
Specific
AddendumSQAM- Rev. 00 | P a g e . 8
3.3.1.Technical Drawing, CAD and Geometric Tolerancing
Only products manufactured according to technical drawings approved by TAIGA will be
accepted. TAIGA technical drawings take precedence over any Supplier manufacturing
drawings. Also, TAIGA 3D files override 2D technical drawings specifications. It’s expected
that the Supplier has knowledge of Geometric Dimensioning and Tolerancing (GD&T) as
per the ASME Y14.5M-2009 Standard, to provide parts that are within the tolerances as per
TAIGA 2D technical drawings. It’s the Supplier’s responsibility to demonstrate the part’s
compliance to the GD&T tolerancing requirements by using the proper measurement
technique (e.g., Coordinate measurement machine).
3.3.2. Review of Technical Specifications
The objective of this process is to ensure that the Supplier has a full understanding of the
technical requirements related to the product. The Supplier must review all the technical
documents, standards, and specifications defining the product and fill the compliance
matrix to confirm that each requirement is understood and achievable. In the event where
a requirement isn’t understood or achievable, an action plan needs to be put in place. The
compliance matrix shall be sent by TAIGA buyer during the RFQ process.
3.3.3. Design Validation Planning and Reporting (DVP&R)
When applicable (requested by the agreed plan), the Supplier must develop and
implement a product test plan (DVP&R) that must be reviewed and approved by TAIGA
Project Representatives. Inputs for the test plan should include: DFMEA, engineering
specifications and any other TAIGA defined/supplied engineering requirements.
3.3.4. Design Failure Mode and Effects Analysis – DFMEA
Where applicable, design responsible Suppliers must develop and maintain a DFMEA
throughout the life of the product. DFMEA inputs should include warranty issues, customer
concerns, lessons learned, and address past 8D concerns.
3.3.5. Process Failure Mode and Effects Analysis – PFMEA
A PFMEA is an absolute requirement which must be developed and maintained
throughout the life of the product. PFMEA should also include inputs such as DFMEA,
warranty issues, customer concerns, lessons learned, and past 8D concerns.
4.Supplier Approval Process
Prototype
Supplier
Production
Supplier
Indirect
Supplier
NDA, GTC, SQAM RFQ Closed PO
FAI and PO
Delivery
Prototype
Supplier
active
Prototype Supplier
Active
Prototype
Supplier
Initial
Assessment
Documenta
tion Based
Audit
Visit and On-
Site
Assessment
Production
Supplier
active
RFQ Closed PO PO DeliverySQAM- Rev. 00 | P a g e . 9
TAIGA has defined the following “Supplier Types” for the purpose of classifying its suppliers. It is
possible for a single organization to qualify as more than one (1) Supplier Type.
TYPE Definition Examples QMS *
Manufacturer
(Production or
Prototype)
A supplier who manufactures:
a product which is designed by
the supplier or
a generic product in accordance
with industry standards and
specifications
Catalog Items
Hardware, fasteners
Raw Materials
Chemical products
Software
ISO9001 or
IATF 16949
ISO 26262
(Software)
Subcontractor
(Prototype)
A supplier who manufactures products
or performs special processes in
accordance with TAIGA engineering’s
specifications
TAIGA part#
manufacturer
Build-to-print machine
shop
Processing house
Surface / heat
treatments
Casting / machining
No specific
requiremen
t
Subcontractor
(Production)
ISO9001 or
IATF 16949
Distributor
(Production or
Prototype)
A supplier who purchases and resells
products without processing the
materials internally (apart from re-
packaging, logistics, etc.)
Catalog Items
Hardware, fasteners
Commercial goods
Chemical products
ISO9001
Indirect
Products or
Services
(Indirect)
A supplier providing products, parts
and/or services in support of TAIGA’s
industrial activities but not to be
installed or integrated into TAIGA’s end
products
Contractors
Tools
Consumables
Supplies
No specific
requiremen
t
Laboratory
(Indirect)
A supplier providing laboratory services Calibration
Testing
Analysis
ISO17025
Table 3: Supplier types
* Suppliers are required to implement and maintain a registered Quality Management
System (QMS) to support all applicable elements of the international standard, as defined
by the Supplier Type. QMS certification must be achieved via an accredited
Certification/Registration Body (e.g., accredited by ANAB or another equivalent, nationally
recognized accrediting body). Additional ISO14001 certification is encouraged throughout
TAIGA’s Supplier base.
4.1. Supplier Evaluation Process
TAIGA requires all Suppliers to be approved prior to the issuance of contracts. All Suppliers
must be approved by TAIGA Purchasing, regardless of approvals by customers or other
entities.SQAM- Rev. 00 | P a g e . 10
Prototype Supplier:
Suppliers in this family can only supply prototype parts, which are not fully qualified and are
not intended to be used in the final product (production product). A prototype product is
an early sample, model, or release of a product built to test a concept or a process.
A prototype is generally used to evaluate a new design and does not necessarily use the
same material or process that will be used for the production part.
Production Supplier
Suppliers in this family can supply prototype AND production parts. They are fully qualified
and are intended to be used for final production products. A production product uses the
final material and the approved process and is approved to be used in the final version of
TAIGA products once the formal qualification process is completed.
Indirect and Service Supplier
Indirect and Service Suppliers provide TAIGA with products/services not directly related to
the production (for example: furniture, office products, detergents, facility maintenance,
manpower, assurance, IT services etc.).
4.2. Supplier Evaluation steps
The Supplier Evaluation and Approval Process includes the following steps:
a) Potential Supplier Initial Assessment
TAIGA will request the Supplier to provide a copy of its quality management system
certificate and complete a Potential Supplier Self-Assessment (PSA) of its business and
quality management system and capabilities, providing information related to the
following criteria:
Company profile
Management
Environment
Quality
Logistics
After market
Competence
Product development
Finance
Productivity
Sourcing
b) Documentation Audit
Once the Potential Supplier Self-Assessment (PSA) completed, the assigned Supplier
Quality Engineer will request all the relevant documented evidence related to the criteria
part of the PSA. The PSA review and the audit of the various documents enable the Supplier
Quality Engineer to determine if the Supplier’s quality management system meets TAIGA
requirements.
c) On-Site Assessment
Generally, when a Supplier is IATF 1694 / ISO TS 16949 certified by an accredited certification
body, TAIGA will not conduct an on-site assessment of the Supplier’s quality management
system against the same criteria. However, TAIGA, due to product/process complexity orSQAM- Rev. 00 | P a g e . 11
criticality, may elect to conduct on-site assessments of Supplier products or process
capabilities (Process Audit – PA). As a result, findings may be issued.
These assessments could include:
Quality Management System (QMS)
Business and Manufacturing Operations
Continuous Improvement Initiative
Technology Assessment
Sub-Tier Supplier Control
4.3. Supplier Status
Based on the Supplier evaluation steps, a Supplier can be in one of the below statuses:
Supplier Status description:
UNDER EVALUATION: The Supplier is under evaluation to verify if it can be part of TAIGA
Supplier panel
ACTIVE: The Supplier is fully qualified and is currently a partner of TAIGA in all supply
chain activities
NBH: New Business Hold – major problems occurred and no clear action plan active to
solve them
OBSOLETE: The Supplier is obsolete. No business possible until a new evaluation is
completed.
Table 4: Supplier status
(*) Active Suppliers can deliver production parts only after part approval in any case
5. Product Qualification
Prototype
Part
Production
Part
Type Receive RFI/RFQ Proto/sample delivery Production
delivery
Under Evaluation yes yes no
Active yes yes yes (*)
NBH no Waiver needed yes
Obsolete no no no
CAD files and Technical
Requirements
FAI
Part Delivery
and QC by
TAIGA
Part is Accepted
CAD Files and
Technical
Requirements
APQP
Process
(When
requested)
Special
Processes
Approval
PPAP
Submission
Part Delivery
and QC by
TAIGA
Part is
AcceptedSQAM- Rev. 00 | P a g e . 12
5.1. Prototype Product Qualification: Documentation Approval
First Article Inspection (FAI)
As a minimum, a First Article Inspection (FAI) is required to initially qualify a prototype
part/process for Supplier approval, unless the PPAP process (below) is used instead. In the
event where an IATF certified supplier produces prototype parts, he shall submit a Level 4
PPAP package.
Furthermore, a new FAI may be requested if there is an extended gap of time since last
production. The FAI requires that all features and characteristics on the design specification
and control plan be inspected and verified prior to production1
. TAIGA FAI form, or other
convenient and equivalent document may be used.
5.2. Product Qualification for Production
This section defines the generic requirements for production part qualification and
approval. The purpose is to determine if all TAIGA design and specification requirements
are properly understood by the Supplier and that the manufacturing processes have the
capability to consistently meet these requirements.
5.2.1. Advanced Product Quality Planning (APQP)
When requested, Supplier shall implement and develop a detailed Advanced Product
Quality Plan for the development of processes used to produce a specific part or family of
part. The AIAG publication “Advanced Product Quality Planning (APQP) and Control Plan”
shouldbe usedasareferencewhendevelopingthese plans.Theseplans shouldalso include
the TAIGA specific requirements presented in the current document. APQP identifies the
tasks to be completed, the expected timing, assigned responsibility for completion and the
critical path.
The objective of the planning process is to deliver the project on time, at the right cost and
at the highest level of quality. The initial development of the APQP should begin upon
receipt of the Request for Quotation (RFQ). This initial plan should be included as part of the
RFQ response package.
The Supplier is responsible for obtaining the latest revision of the applicable AIAG core tool
reference manuals and forms (see Applicable Documents section for where these
references may be obtained).
The AIAG Core Tools Manuals are:
Advanced Product Quality Planning (APQP) and Control Plan
Production Part Approval Process (PPAP)
Potential Failure Mode and Effects Analysis (FMEA)
Measurement Systems Analysis (MSA)
Statistical Process Control (SPC)
1
ForFirstArticleInspectionguidance,seeAIAGPPAPManual(AppendixC,D,&E)–ProductionPartApproval
Process (available from www.aiag.org).SQAM- Rev. 00 | P a g e . 13
APQP Timing
Suppliers of parts supported by the APQP are required to report the project status at
established intervals during the project development. As a general rule, reviews are held
prior to each of the project milestones or drawing revision releases. Suppliers should
prepare for these project review meetings by completing or updating the APQP review
template, their projectplan and the project milestone dates. Suppliers can access the APQP
review templates on TAIGA website.
APQP Samples
The Supplier shall provide the samples according to the APQP timing plan agreed with
TAIGA, and make sure the samples will meet the quality requirements for each milestone.
The Supplier shall submit the APQP documents (and, eventually, the PPAP) on time as
TAIGArequired.TAIGAwill reviewthe documents basedon theISO 9001,IATF16949 orAIAG.
If there is any issue or timing delay for the APQP documents, TAIGA releases a Supplier
complaint according to the risk and requires root cause analysis and improvement report
to avoid other occurrences.
5.2.2. Special Processes Documentation approval
For TAIGA, the following processes are managed as special processes as defined in the ISO
9000 standard:
Process
Surface treatment (coating, plating, etc.)
Casting
Metallurgy
Plastics
Electrics and Electronics
Adhesive
Table 5: Special processes in scopeSQAM- Rev. 00 | P a g e . 14
Supplier is responsible to follow the requirements indicated in the purchase order. All first
part shipment must be approved by TAIGA. Shipping approval must follow the following
steps:
Supplier and TAIGA agree on the specific tests and components part of the test plan
Supplier performs the final inspection on one sample part (destructive test if applicable)
Supplier must send the test results documents to TAIGA for approval
TAIGA will analyze the documents and will inform the Supplier if the parts can be
shipped
After the reception of the shipment approval, the Supplier cand send the parts
5.2.3. Production Part Approval Process (PPAP)
The Supplier shall submit to TAIGA a Production Part Approval Process (PPAP) level 3
submission package. The Supplier is responsible for obtaining the latest revision of the
applicable AIAG core tool reference manuals and forms (see Applicable Documents section
for where these references may be obtained).
PPAP defines the approval process for new parts, revised parts, or parts produced from new
or significantly revised production methods. The PPAP process consists of 18 elements that
may be required for approval of production level parts. The PPAP manual contains detailed
information, guidelines and sample documents useful for completing the process
requirements. The Production Part Approval Process (PPAP) demonstrates that the
manufacturing process used to produce parts is fully developed, thoroughly tested, and
capable of serial production of parts conforming to the technical specifications.
Every PPAP package must be sent to QUALITY@taigamotors.ca to be assigned to the
proper SQE and be reviewed.
Unless exempted by an approved Waiver from TAIGA, Suppliers may not ship the first batch
of production parts without an approved Part Submission Warrant (PSW) document signed
by TAIGA representative.
PPAP Submission Levels
The PPAP submission requirements are normally divided into five classifications or levels,
as follows:
Level 1 – Part Submission Warrant (PSW) only, submitted to TAIGA Quality
Level 2 – PSW with product samples and limited supporting data
Level 3 – PSW with product samples and complete supporting data
Level 4 – PSW and other requirements as defined by the customer
Level 5 – PSW with product samples and complete supporting data available for review
at the Supplier’s manufacturing locationSQAM- Rev. 00 | P a g e . 15
Table 6: Documents to submit
S – The Supplier will submit documentation and retain copy of records or documentation items at appropriate
locations
R – The Supplier shall retain at appropriate locations and make available to TAIGA upon request.
“*” The Supplier shall retain at appropriate location and submit to TAIGA upon request.
Elements of PPAP
Below is the list of all 18 elements accompanied by a brief description for each element:
Design Documentation
Design documentation shall include both customer and the Supplier’s drawings.
Engineering Change Documentation
If the PPAP is required due to a request for a change to a part or product, the
documentation requesting the change must be included in the PPAP package. This
documentation usually consists of a copy of the Engineering Change Notice (ECN).
(Customer) Engineering Approval
This documentation usually consists of a copy of the Engineering Change Notice (ECN),
approved by the customer engineering department.
Design Failure Mode and Effects Analysis
Design Failure Mode and Effects Analysis (DFMEA) is a cross-functional activity that
examines design risks by exploring the possible failure modes and their effects on the
Submission Level
Level
1
Level
2
Level 3
(Default)
Level
4
Level
5
1 Design Record (2D Drawing) R S S * R
2 Engineering Change Documents (if any) such as
ECO/ECP
R S S * R
3 Engineering Approval if required R R S * R
4 DFMEA N/A N/A N/A N/A R
5 Process Flow Diagram R R S * R
6 PFMEA R R S * R
7 Control Plan R R S * R
8 Measurement Systems Analysis (GR&R) R R S * R
9 Dimensional Report R S S * R
10 Material/Performance/Functional Test Results R S S S R
11 Initial Process Studies (Short-term Capability
Study)
R R S * R
12 Qualified Laboratory Documents R R S * R
13 Appearance Approval Inspection Report S S S * R
14 Sample product R S S * R
15 Master Sample R R R * R
16 Checking Aids R R R * R
17 Customer Specific Requirement compliancy R S S S S
18 Parts Submission Warrant (PSW) S S S S SSQAM- Rev. 00 | P a g e . 16
product or customer and their probability to occur. The DFMEA is a living document that
should be reviewed and updated on a regular basis.
Process Flow Diagram
The Process Flow Diagram clearly describes the production process and its sequence in a
graphical manner.
Process Failure Mode and Effects Analysis
Process Failure Mode and Effects Analysis (PFMEA) reviews all the steps of the production
processtoidentifyanypotential failureof aprocessandevaluatethe riskinterms ofseverity,
occurrence, and probability to detect failure.
Control Plan
The Control Plan is an output from the PFMEA. The Control Plan lists all product Critical and
Special Characteristics and inspection methods required to deliver products that
continually meet the customer quality requirements.
Measurement System Analysis Studies
Measurement System Analysis (MSA) studies include Gage Repeatability & Reproducibility
(R&R) studies on measurement equipment used during assembly or quality control checks.
Calibration records for all gages and measurement equipment must be included.
Dimensional Results
Each dimension on the drawing is measured on the final assembly to make sure that it falls
within specification. The results are recorded in a spreadsheet and included within the
PPAP submission, a total of 5 units must be included in the dimensional report.
Records of Material / Performance Tests
This element should contain acopy of the Design Verification Planand Report (DVP&R). The
DVP&R is a summary of every validation test performed on the part. It should list each test
performed and its result. This section shall also include material certificate when applicable.
Initial Process Studies
Initial process studies include Statistical Process Control (SPC) charts for the Critical and
Special Characteristics of the product. These studies must demonstrate that the critical
processes are stable, have normal variation and are running near the intended nominal
value.
Qualified Laboratory Documentation
Qualified laboratory documentation consists of the industry certifications for any inhouse
or outsourced lab that was involved in completing validation testing.
Appearance Approval Report
The Appearance Approval Report (AAR) is applicable for components affecting appearance
only. This report validates that the final product appearance requirements are as per
specifications. Requirements include but are not limited to color, grain, textures, etc.SQAM- Rev. 00 | P a g e . 17
Sample Production Parts
Sample production parts are sent to the customer for approval and are typically stored at
either the customer or Supplier’s site. A picture of the production part is usually included in
the PPAP documentation along with documentation regarding the part location.
Master Sample
A master sample is a final sample of the product that is inspected and signed off by the
customer. The master sample part is used to train operators and serves as a benchmark for
comparison to standard production parts if any quality questions arise.
Checking Aids
This is a detailed list of checking aids used by production. It should include all tools used to
inspect, test or measure parts during the assembly process. The list should describe the tool
and have its calibration schedule. Checking aids may include check fixtures, contour,
variable and attribute gages, models, or templates. MSA may be required for all checking
aids based on customer requirements.
Customer Specific Requirements
This element of the submission package relates to all the customer specific requirements.
For bulk materials, the customer specific requirements shall be recorded on the “Bulk
Material Requirements Checklist”.
Part Submission Warrant
The Part Submission Warrant (PSW) form is a summary of the entire PPAP submission. A
PSW is required for each part number unless otherwise stated by the customer.
5.2.4. PPAP and PSW approval
a) Approved
Approved indicates that the part or material, including all sub-components, meets all
customer requirements. The organization is therefore authorized to ship production
quantities of the product.
b) Interim Approval
Interim Approval permits shipment of material for production requirements on a limited
time or piece quantity basis. Interim Approval will only be granted when the organization
has submitted a deviation form that was approved by TAIGA.
c) Rejected
Rejected means that the PPAP submission does not meet customer requirements. In such
cases, the submission and/or process shall be corrected to meet customer requirements.
The submission shall be approved before production parts may be shipped.
5.2.5. New PAPP submission
The Supplier shall submit a notification form to TAIGA for any of the following pending
changes:
o Use of different material that was used on the previous approved PPAP
o Production from new or modified tooling
o Location / layout changeSQAM- Rev. 00 | P a g e . 18
o Use of different production or test equipment than the one qualified on the previous
approved PPAP
o Change of subcontractor for material, parts or services
Based on the analysis of the notification form, the Supplier shall be asked to submit a
revised PPAP for TAIGA approval PRIOR to beginning of production shipment from the
approved changes.
Annual Requalification
Tocertify the components and rawmaterials delivered, adimensional inspectionisrequired
each year following PPAP approval.
6.Process control
6.1. TAIGA Specifications
TAIGAdocumentationsuchasDrawings andEngineeringSpecifications mustbereviewed,
understood and agreed upon by the Supplier, prior to launch. It is required that a bubble
print is created by the Supplier, which identifies ALL characteristics, for example, Diameter,
Depth, Angle, etc., and are individually numbered and referenced throughout the process
(PFMEA, Control Plan, Work Instructions, Process Plans, etc.).
6.2. Documentation and Data Control
The Supplier shall control all documents and records relating to the purchase order,
including technical drawings, specifications, engineering changes, work instructions,
manufacturing processes, manufacturing operation sheets, scheduling and quality control
plans, as applicable.
6.3. Record Control and Retention
The Supplier shall maintain records of inspections, dispositions, test results and corrective
actions to prove that these operations have been performed for a minimum period of ten
(10) years after the part becomes inactive.
6.4. Pass Through Characteristics (PTC) Requirements
Pass Through Characteristics (PTC) are product characteristics that are created or revealed
during the process and have little to no chance of being detected prior to reaching the
customer. Such characteristics will affect fit, form or function at some point.
Each PTC should be identified in both the PFMEA and Control Plan under the Special
Characteristic/Classification column and identified by the by the [PTC] notation on the
drawing. These characteristics should have a defined inspection method and frequency
described in the Control plan. Even if these PTC characteristics are introduced at a sub-tier
supplier level, the tier 1 supplier shall manage the characteristic (See section 3.1).
6.5. Error and Mistakes Proofing
Whenever possible, TAIGA advocates the implementation of error-proofing methodology
during planning and problem resolution to prevent manufacture of non-conforming
products, especially for repetitive functions, difficult tasks prone to mistakes, or where the
cost of error is high.SQAM- Rev. 00 | P a g e . 19
6.6. Work Instructions
The Supplier shall prepare documented work instructions, as necessary, for all employees
having responsibilities for the operation of processes that impact product quality. These
instructions shall be maintained current and accessible for use at the workstation.
6.7. Control Plan
When APQP or PPAP applies, control plans are required for production phase. Like the
FMEA’s, Control Plans are living documents and are expected to be reviewed and updated
as process or product changes.
6.8. Job Set-Up Verification
Verification of product is required any time that a job is set-up, changed over or out of
production for astated period. The supplier is to verify first piece and in theeventof multiple
changeovers, last-off inspection is a recommended practice.
6.9. Control of Monitoring and Measuring Devices
Measuring equipment shall be calibrated and verified (validity of results) at specified
intervals, or prior to use, against measurement standards traceable to international or
national measurement standards; when no such standards exist, the basis for calibration
shall be recorded.
6.10. Reworking of Faulty Parts
Reworking faulty parts that are noticed either during our production or as part of a
complaint must only be carried out in agreement with the TAIGA quality management and
must be clearly labeled as reworked parts in each part/bag/box before delivery. This
approach should be part of the reaction plan in the control plan.
6.11. Preventative & Predictive Equipment Maintenance (PM)
To support capacity and quality requirements, it is a necessity that suppliers develop a
planned preventive maintenance system to optimize OEE, process variation and process
capability by minimizing unplanned downtime. As part of the PM program, suppliers
should document and review PM actions.
6.12.Product-Related with Embedded Software
Suppliers furnishing product-related software with embedded software shall implement
and maintain a process for software quality assurance of their products.
An assessment process based on ISO 26262 will be utilized to assess supplier’s software
development process. Using prioritization based on risk and potential impact to TAIGA,
Suppliers shall retain documented information of a software development capability self-
assessment.SQAM- Rev. 00 | P a g e . 20
7.Packaging and Labeling
7.1. Handling, storage, and packaging
The supplier shall have a written process in place to ensure that in-process handling,
product identification, storage, preservation, packaging of product including relevant
documentation to ensure traceability, storage ofmaterial and delivery will prevent damage,
deterioration, contamination, substitution, or misuse of material.
PACKAGING
Every packaging design shall be approved by TAIGA representative. Suppliers should
provide expendable packaging or returnable containers, where appropriate, that provide
for sufficient density and protection from any likely damage that may occur. Expendable
materials and packaging must meet local and national standards for safe disposal and/or
recycling.
LABELING
Labeling and bar code requirements may vary. The TAIGA representative will provide the
Supplier with the relevant specifications. As a bare minimum, the labelling should include
the following information to ensure traceability: Part number (with revision), Supplier name
and Production batch number.
7.2. Identification and traceability of parts, box, shipments
Marking of finished products shall be performed in accordance with the TAIGA instruction.
All boxes must be identified with a label as per TAIGA’s specification: Supplier requirements
– box labelling (SQLF-001 Rev 002).
7.3. Material certification/raw material
When requested by TAIGA, Material certification is compulsory with each shipment and
should include the material test certificate as well as the technical data sheet. The use of a
substitute material is not permitted unless authorized by the TAIGA engineering
department.
7.4. Tool Marking
All Tools and Gauges, property of TAIGA, must be properly and permanently identified by
the Supplier according to TAIGA requirements. The identification is to contain the following
information: Property of TAIGA, Tool Number, Part Number and Part Name. Suppliers are
required to upload significant pictures of the tooling and update their tooling inventory
information at PPAP to receive tooling payment.
8.Quality events (NC, problem solving, recalls)
Continual Improvement
Suppliers should define a process for continual improvement, such as ISO 9004, including
Annex B.SQAM- Rev. 00 | P a g e . 21
8.1. Problem Solving Process
Suppliers should use a reliable close-loop problem-solving method to assess all the
nonconformities communicated by TAIGA. TAIGA does not strictly define which tool to use
and when: There may be specific cases when the TAIGA Quality Representative will require
a specific problem-solving tool.
For example (8D Report):
Step Description
1 Team approach Consult and coordinate with relevant stakeholders
2 Describe the Problem State what the problem “Is,” and “Is Not” with respect to what,
where, when, who, how, and how many. Use quantitative terms.
3 Containment Action Immediately contain any suspect product to protect TAIGA and its
customers.
4 Root Cause Verification Identify potential causes, analyze causes for failure mode, validate
root cause(s), and identify solutions.
5 Implement Corrective
Action
Implement solution. Document the corrective action: update
applicable FMEA, control plan and work instructions.
6 Verify Corrective Action Use check sheets, auditing, sampling, and/or control plans to
monitor process performance for effectiveness and sustained
improvement
7 Prevent Recurrence Implement changes to prevent the same type of error from
occurring in similar products/processes. Update applicable
documents
8 Congratulate the Team Review, approve, and support. Provide resources and team
recognition
Table 7: 8D approach description
8.2. Control of non-conforming products
Shipping of non-conforming materials to TAIGA is not permitted (unless explicitly
authorized) and, in any case, will directly affect the Supplier’s score card rating. Measures
shall be taken to ensure the Supplier’s future product conformance and control. The
Supplier is also responsible for their subcontractors’ conformance to requirements.
Containment
When a problem is discovered at the customer facility, the supplier will be notified
immediately and all suspect products must be contained at all locations including,
supplier/sub-supplier facilities, warehouses, parts in transit to the customer or other
locations, parts on customer production floor. Suppliers are expected to have a strong
written procedure for containment and control of non-conforming products.
TAIGA reserves the right to charge back all costs associated with supplier caused non-
conforming products, including return of material, loss of production, labor and
components, where applicable.SQAM- Rev. 00 | P a g e . 22
Controlled Quarantine Area
All product which is suspect or non-conforming, for any reason, must be properly identified
and stored in a defined quarantined area, away from the production flow or shipping areas.
The Supplier must have a system and a procedure in place to manage parts in the
quarantine area.
Nonconformities
In the event non-conforming parts, the Supplier will be notified using a quality alert (QA).
The Supplier complaint related to any issue identified by TAIGA and TAIGA customers,
including quality issues, delivery issues, capacity issues, service issues of mass production
parts.
The Supplier’s response requirements for the quality alert are:
Fast response (Short term containment action) within 24 hrs
Root cause and actions (Long term action) within 5 days
Actions implementation and validation within 10 days
The time of implementation could be delayed based on the specific complaint upon TAIGA
approval.
Recalls
If TAIGA or any of its customers find or suspect that the products are defective, TAIGA will,
to the extent possible, notify the Supplier. Supplier shall fully cooperate with TAIGA in
implementinganyrecall programs and/orcorrective andpreventive actionplans.Therefore,
the Supplier agrees to reimburse to TAIGA all the costs associated with the implementation
of corrective actions.
9.Deviation Request
A Supplier shall not knowingly ship productsthatdeviates from the technical specifications.
If such a condition exists, the Supplier may ask TAIGA, in writing, to allow shipment of the
product under a written nonconformance deviation.
A Deviation request has a time limit, that shall be indicated in the document, based on
number of parts or period, up to a maximum of 3 (three) months.
If requested by the TAIGA Buyer, the Supplier must send samples of such nonconforming
items to TAIGA for evaluation. The cost of shipping, inspection, and testing will be evaluated
to determine the potential acceptability of such product will be charged to the Supplier.
The Supplier must start working immediately on corrective actions. In all cases, the Supplier
shall fully contain all products suspected of being nonconforming.
A copy of the TAIGA-approved deviation document must be included inside of each box.SQAM- Rev. 00 | P a g e . 23
10. Supplier Performance and Corrective Actions
10.1. Supplier Quality Performance Evaluation:
Suppliers will be evaluated with two key indicators.
Quality (% Compliant parts)
This metric defines the Rejected percentage (%).Thedefinitionof “rejected parts”is the total
number of parts returned to the Supplier for any valid quality reason (including those
caused by shipping and administrative errors):
% Compliant parts = (1 − )𝑥100
BasedonTAIGA’sexpectations,thefollowingtable describestheresulting actionsorvarious
% reject values.
% Compliant
parts
Category Comment
> 99,9 Meets
expectation
Meets all the requirements set by TAIGA
95 – 99,9 Good Satisfactory; no action required
80 - 95 Marginal Systemic corrective action may be required
< 80 Unacceptable Systemic corrective action is required and may require Supplier
to meet with TAIGA management representatives.
Table 8: Requirement for the % of compliant parts
Delivery (OTD)
This metric defines the delivery performance rating using the following formula: On Time
Delivery (OTD) is based on the contract date. The Supplier should systematically inform
TAIGA of any delay in delivering product and provide a new dispatch date. The Supplier is
responsible for additional transport costs due to delays.
% OTD= 𝑥100
% OTD Category Comment
> 98 Meet
expectations
Meets all the requirements set by TAIGA
90 - 98 Good Satisfactory; no action required
80 - 89 Marginal Systemic corrective action may be required
< 80 Unacceptable Systemic corrective action is required and may require
Supplier to meet with TAIGA management representatives.
Table 9: Requirement for the % OTDSQAM- Rev. 00 | P a g e . 24
11.Contact List and Compliance Matrix
Upon receipt and full reading of the contact list and compliance matrix document, the
supplier shall fill the contact list and acknowledge compliance to the various SQAM
requirements. In case of on-compliance, the supplier shall notify TAIGA by filling the
comment / action required column.SQAM- Rev. 00 | P a g e . 25
[Visual/OCR review: physical page1 is the Supplier Quality Assurance Manual photographic cover with Taiga branding. Physical page25 is a branded back cover, not an unprocessed blank technical page.]