← Přehled firem
Získáno 24. 10. 2026 · 22:56
TAIGA MOTORS CORPORATION
Condensed Consolidated Interim Financial Statements
(Expressed in Canadian Dollars, unless otherwise noted)




                                        For the three-month periods ended
                               March 31, 2024 and March 31, 2023 (Unaudited)
              These financial statements have not been reviewed by the Company’s external, independent auditors
Taiga Motors Corporation
Condensed Consolidated Interim Statements of Financial Position
(Expressed in Canadian Dollars - Unaudited)


 As at                                                                Notes           March 31, 2024         December 31, 2023
 ASSETS
 Current assets
 Cash and cash equivalents                                                     $            2,507,715    $             5,301,523
 Receivables                                                            7                   2,114,178                  5,389,617
 Inventories                                                            8                  32,399,317                 33,241,609
 Prepaid expenses and deposits                                          9                   1,809,331                  2,457,766
 Total current assets                                                          $           38,830,541    $            46,390,515

 Non-current assets
 Prepaid expenses and deposits                                          9                     104,131                     96,582
 Property and equipment                                                 10                 20,190,631                 20,693,031
 Intangibles                                                            11                 10,436,052                 11,140,185
 Right-of-use assets                                                    12                  8,617,836                  8,908,180
 TOTAL ASSETS                                                                  $           78,179,191    $            87,228,493

 LIABILITIES
 Current Liabilities
 Trade payables and accrued liabilities                                 13     $           16,255,845    $            14,961,926
 Share-based compensation liability                                                           216,222                    237,788
 Deferred revenue                                                                             397,112                  1,481,409
 Customer deposits                                                                          1,137,826                  1,236,334
 Current portion of lease liabilities                                   14                    992,737                    961,692
 Current portion of loans and borrowings                                15                  5,252,922                    587,165
 Provisions                                                             21                  1,998,026                  1,958,869
 Total current liabilities                                                                 26,250,690                 21,425,183

 Non-current Liabilities
 Lease liabilities                                                      14                  8,532,478                  8,792,144
 Loans and borrowings                                                   15                 58,403,829                 57,823,643
 TOTAL LIABILITES                                                                          93,186,997                 88,040,970

 SHAREHOLDERS’ EQUITY
 Share capital                                                         16                 323,937,503                323,937,503
 Contributed surplus                                                  17,18                23,936,791                 23,750,237
 Deficit                                                                                (362,882,100)              (348,500,217)
 TOTAL SHAREHOLDERS’ DEFICIENCY                                                          (15,007,806)                  (812,477)

 TOTAL LIABILITIES AND SHAREHOLDERS’ DEFICIENCY                                $           78,179,191    $            87,228,493
Nature of operations (Note 2)



Approved on behalf of the Board by:

(Signed)                                              (Signed)

Andrew Lapham, Chairman of the Board                   Martin Picard, Audit Committee Chair




              The accompanying notes are an integral part of these condensed consolidated interim financial statements.
Taiga Motors Corporation
Condensed Consolidated Interim Statements of Net Loss and Comprehensive Loss
(Expressed in Canadian Dollars - Unaudited)

                                                                                 Three-months                   Three-months
 For the periods ended                                        Notes             March 31, 2024                 March 31, 2023

   Revenue                                                      19      $              5,077,169   $                 1,729,442
   Cost of sales                                                                       8,749,160                     5,783,783
 Gross loss                                                                          (3,671,991)                   (4,054,341)

 Expenses
   Research and development (net of tax credits)                                       3,018,017                     3,914,424
   General and administration                                                          4,381,982                     5,016,309
   Sales and marketing                                                                 1,078,950                     1,034,272
 Loss before other expenses                                                         (12,150,940)                  (14,019,346)

 Other expenses (income)
   Net financing cost                                           23                     2,230,943                       279,667
 Loss before tax                                                                    (14,381,883)                  (14,299,013)
   Deferred income tax recovery                                                                -                     1,311,987
 Net loss and comprehensive loss for the period                         $           (14,381,883)   $              (12,987,026)

 Basic and diluted loss per common share                                $                 (0.45)   $                     (0.41)

 Weighted average number of common shares
 outstanding                                                                         31,825,712                    31,825,712




                   The accompanying notes are an integral part of these condensed consolidated interim financial statements.
Taiga Motors Corporation
Condensed Consolidated Interim Statements of Changes in Equity (Deficiency)
(Expressed in Canadian Dollars - Unaudited)

                                                                                      Share          Contributed
                                                                Notes                capital             Surplus                Deficit                Total
 Balance as at December 31, 2022                                          $     323,937,503    $      18,313,353    $    (276,002,216)      $     66,248,640
 Share-based payments                                                                      -             515,638                      -              515,638
 Convertible bond conversion option, net of income tax effect                              -           3,638,907                      -            3,638,907
 Net loss and comprehensive loss for the period                                            -                   -          (12,987,026)          (12,987,026)
 Balance as at March 31, 2023                                             $     323,937,503    $      22,467,898    $    (288,989,242)      $     57,416,159

 Balance as at December 31, 2023                                          $     323,937,503    $      23,750,237    $    (348,500,217)      $      (812,477)
 Share-based payments                                           17,18                     -              186,554                     -               186,554
 Net loss and comprehensive loss for the period                                           -                    -          (14,381,883)          (14,381,883)
 Balance as at March 31, 2024                                             $     323,937,503    $      23,936,791    $    (362,882,100)      $   (15,007,806)




                                The accompanying notes are an integral part of these condensed consolidated interim financial statements.
Taiga Motors Corporation
Condensed Consolidated Interim Statements of Cash Flows
(Expressed in Canadian Dollars - Unaudited)



                                                                                  Three months              Three months
For the periods ended                                            Notes           March 31, 2024            March 31, 2023

Cash (used in) provided by:

OPERATING ACTIVITIES
Net loss for the period                                                     $       (14,381,883)     $        (12,987,026)

Non-cash items:
Depreciation and amortization                                   10,11,12                1,568,366                1,503,281
Net financing cost                                                 23                   2,230,943                  279,667
Deferred income tax recovery                                                                     -             (1,311,987)
Share-based payments                                               17                     186,554                  597,127
Foreign currency loss (gain)                                                              (79,371)                  17,599
Net change in provisions                                           21                       39,157                  82,155
Reversal of inventory write-down                                    8                 (1,455,353)                        -
Impairment of property and equipment                                                             -                  61,165

Changes in non-cash working capital items
Receivables                                                                             3,275,439                (560,870)
Inventory                                                                               2,297,646              (3,542,703)
Prepaid expenses and deposits                                                             640,886                (925,827)
Trade payables and accrued liabilities                                                  1,544,664                (953,564)
Customer deposits                                                                         (98,508)               (101,710)
Deferred revenue                                                                      (1,084,297)                1,021,638
Share-based compensation liability                                                        (21,566)               (103,233)
Net cash used in operating activities                                       $         (5,337,323)    $        (16,924,287)

INVESTING ACTIVITIES
Acquisition of property and equipment                              10       $          (224,044)     $         (1,302,187)
Proceeds from disposal of property and equipment                   10                     51,828                         -
Expenditures on intangible assets                                  11                   (69,741)                  (69,919)
Interest received                                                  23                     29,583                    72,889
Net cash used in investing activities                                       $          (212,374)     $         (1,299,217)

FINANCING ACTIVITIES
Interest paid                                                               $          (646,999)     $           (218,098)
Repayment of lease liabilities                                     14                  (228,621)                 (203,806)
Repayment of loans and borrowings                                  15                    (42,647)                 (24,587)
Proceeds from loans, net of transactions costs                     15                  3,674,156               39,650,000
Transaction costs                                                  15                           -              (3,303,041)
Net cash provided by (used in) financing activities                         $          2,755,889     $         35,900,468

Net increase (decrease) in cash in the period                               $         (2,793,808)    $         17,676,964
Cash – beginning of the period                                              $           5,301,523    $         22,838,362
Cash – end of the period                                                    $           2,507,715    $         40,515,326


  Supplemental cash flow information (Note 22)




        The accompanying notes are an integral part of these condensed consolidated interim financial statements.
Taiga Motors Corporation
Notes to the Condensed Consolidated Interim Financial Statements – March 31, 2024
(Expressed in Canadian Dollars - Unaudited)

Note 1 - Reporting entity

Taiga Motors Corporation (the "Company" or "Taiga"), was incorporated under the laws of the province of
British Columbia on March 13, 2019. Taiga’s head office is 2695 Dollard Avenue, LaSalle, Québec, H8N 2J8.
Its registered office is located at 550 Burrard Street, Suite 2900, Vancouver, British Columbia, V6C 0A3. These
consolidated financial statements comprise the Company and its wholly-owned subsidiaries Taiga Motors Inc.,
CGGZ Finance Corp. and Taiga Motors America Inc. (“Taiga USA”) (together referred as the "Group").

Note 2 - Nature of operations
The Group is focused on research and development, design, production, marketing and distribution of all-
electric powersport vehicles.

These condensed consolidated interim financial statements have been prepared in accordance with IFRS
Accounting Standards as issued by the International Accounting Standards Board (“IASB”), on a going concern
basis, which contemplates the realization of assets and discharge of liabilities at their carrying values in the
ordinary course of operations for the foreseeable future.

During the three-month period ended March 31, 2024, the Company generated a net loss of $14,381,883
(March 31, 2023 - $12,987,026) and negative cash flows from operating activities of $5,337,323 (March 31,
2023 – $16,924,287). As at March 31, 2024, the Company has an accumulated deficit of $362,882,100
(December 31, 2023 - $348,500,217) and a working capital (current assets less current liabilities) of
$12,307,596 (December 31, 2023 – $24,965,332). The Company’s current liabilities and expected level of
expenditures for the next twelve months exceed cash on hand of $2,507,715 at December 31, 2023. In
addition, the Economic Development Agency of Canada (the “Agency”) provided notice to the Company that
it considered that the Company was not in compliance under its loan agreement, starting on February 23,
2024, when the Company confirmed that it would not complete the construction of the Shawinigan facility in
accordance with provisions of the loan agreement. No funds were received by the Company for the Shawinigan
phase of the loan agreement and the Agency provided a waiver for this matter (see Note 14).

Given the Company's stage of development and until it can generate significant profitable operations, the
Company expects to continue financing its operations through a combination of public and/or private equity
and/or debt financings or other sources in order to meet its business plan. The Company will require additional
financing in the near future in order to fund future operations and obligations, and meet its business plan
subsequent to March 31, 2024. The Company is actively managing its liquidity pending additional financing.
While the Company has been successful in securing financing in the past, raising additional funds is dependent
on a number of factors outside the Company’s control, and as such there is no assurance that it will be able
to do so in the future. These events or conditions indicate that a material uncertainty that may cast significant
doubt on the Company’s ability to continue as a going concern.

Given all of the above, Taiga is in the process of taking a number of steps to restructure its operations and to
reduce its operating expenses, including by significantly downsizing the scale and scope of its operations and
by reducing its number of employees, and the Company may well be required to take additional restructuring
measures in the near term. However, there can be no assurance that any such downsizing efforts and
initiatives currently underway or that may be undertaken by the Company in the near term will prove to be
effective in sufficiently reducing the Company’s operating cash burn and, as such, there can be no assurance
that the Company will be able to continue as a going concern and continue to pay its obligations and liabilities
as they become due.

The Company’s continuing operations as intended are dependent upon its ability to attain profitable operations
and generate funds therefrom, adhere to the terms of its lending facilities, and/or raise equity capital or obtain
the necessary financing sufficient to meet current and future obligations.

These condensed consolidated interim financial statements do not include any adjustments to the
classification and amounts of assets and liabilities that may be required should the Corporation be unable to
continue as a going concern. Such adjustments could be material.
                                                   Page 6 of 18
Taiga Motors Corporation
Notes to the Condensed Consolidated Interim Financial Statements – March 31, 2024
(Expressed in Canadian Dollars - Unaudited)



Note 3 - Basis of presentation and statement of compliance
These condensed consolidated interim financial statements have been prepared in accordance with International
Accounting Standard 34, “Interim Financial Reporting”, as issued by the International Accounting Standards
Board (“IASB”). IFRS included IFRSs, International Accounting Standards (“IAS”), and interpretations issued by
the IFRS Interpretations Committee (“IFRIC”).

These condensed consolidated interim financial statements do not include all the information required for full
annual financial statements and should be read in conjunction with the audited financial statements for the year
ended December 31, 2023 which have been prepared in accordance with IFRS.

They have been prepared on a historical cost basis, except for:
   (i) liability-classified share-based payment arrangements, which are measured at fair value at each
         reporting date pursuant to IFRS 2, Share-based Payment;
   (ii) equity-classified share-based payment arrangements which are measured at fair value at grant date
         pursuant to IFRS 2, Share-based Payment; and
   (iii) lease liabilities, which are initially measured at the present value of lease payments not paid at the
         commencement date in accordance with IFRS 16, Leases.

These condensed consolidated interim financial statements were approved and authorized for issuance by
the Board of Directors on May 14, 2024.

Note 4 - Material accounting policies
Significant accounting policies applied to these condensed consolidated interim financial statements are the
same as those applied to the Company’s audited financial statements for the year ended December 31, 2023.

Amendments to IAS 1 – Presentation of Financial Statements

In October 2022, the IASB issued amendments to IAS 1, Presentation of Financial Statements titled Non-
current Liabilities with Covenants. These amendments sought to improve the information that an entity
provides when its right to defer settlement of a liability is subject to compliance with covenants within 12 months
after the reporting period. These amendments to IAS 1 override and incorporate the previous amendments,
Classification of Liabilities as Current or Non-current, issued in January 2020, which clarified that liabilities are
classified as either current or non-current depending on the rights that exist at the end of the reporting period.
Liabilities should be classified as non-current if a company has a substantive right to defer settlement for at
least 12 months at the end of the reporting period. The amendments are effective for annual periods beginning
on or after January 1, 2024 and adoption of these amendments did not have an effect on our financial
statements.

Note 5 - Significant accounting judgments, estimates and assumptions
The preparation of the Company’s condensed consolidated interim financial statements in accordance with
IFRS requires management to make judgments, estimates and assumptions that affect the reported amounts
of assets, liabilities, revenues and expenses and accompanying disclosures. Uncertainty about these
assumptions and estimates could result in outcomes that require a material adjustment to the carrying amount
of assets or liabilities in future periods. These assumptions and estimates are regularly reviewed. Revisions
to accounting estimates are recognized in the period in which the estimates are revised and in any future
periods affected.

The significant judgments made by management in applying the Company’s accounting policies and the key
sources of estimation uncertainty are the same as those applied to the Company’s audited financial statements
for the year ended December 31, 2023.


                                                    Page 7 of 18
Taiga Motors Corporation
Notes to the Condensed Consolidated Interim Financial Statements – March 31, 2024
(Expressed in Canadian Dollars - Unaudited)

Note 6 - Segment reporting
The Company operates in one operating segment. For the purpose of segment reporting, the Company’s Chief
Executive Officer ("CEO") is the Chief Operating Decision Maker. The determination of the Company’s
operating segment is based on its organization structure and how the information is reported to CEO on a
regular basis. All the Company’s significant assets are located in Canada.

Note 7 - Receivables

                                                                    March 31, 2024       December 31, 2023
 SR&ED credit receivable                                       $         1,023,497 $            1,760,060
 Sales taxes receivable                                                    959,696              2,422,494
 Trade receivables                                                         130,985              1,207,063
 Total receivables                                             $         2,114,178 $            5,389,617

SR&ED credits receivable comprise of research and development investment tax credits receivable which
relate to eligible research and development expenditures under the applicable tax laws. The amounts recorded
as receivables are subject to a government tax audit and the final amounts received may differ from those
recorded. There are no unfulfilled conditions or contingencies associated with the government assistance
received.

Note 8 - Inventories
Inventories consist of the following:
                                                                    March 31, 2024       December 31, 2023
 Raw materials                                                  $       14,291,701   $         17,767,565
 Work in progress                                                        4,548,364              4,575,024
 Finished goods                                                         13,559,252             10,899,020
 Total inventories                                              $       32,399,317   $         33,241,609

The cost of inventories recognized as expense during the three-month period totals $4,906,873 ($3,644,192
in 2023) and was recognized in the cost of sales in the consolidated statements of loss. The company
reversed $1,355,353 of net realisable value provision during the three-month period to close the period with
a remaining provision of $6,995,832 (for the three-month period ended March 31, 2023 - $909,501).

The Company reversed an expense of $100,000 related to raw materials in the three-month period ended
March 31, 2024 (for the three-month period ended March 31, 2023 expense of $186,893) due to
obsolescence. The provision was included in the cost of sales. Total obsolescence provision amounts to
$3,147,435 as at March 31, 2024 ($3,247,435 as at December 31, 2023).

Note 9 - Prepaid expenses and deposits

                                                                    March 31, 2024     December 31, 2023
 Security and other deposits                                    $           11,749   $            11,749
 Prepaid insurance                                                          99,356               506,831
 Prepaid inventory and supplies                                            683,112               937,280
 Deposits to suppliers related to property and equipment                   104,131                96,582
 Other prepaid expenses                                                  1,015,114            1,001,906
 Total prepaid expenses and deposits                            $        1,913,462   $        2,554,348
 Current portion of prepaid expenses and deposits                        1,809,331               2,457,766
 Non-current portion of prepaid expenses and deposits           $          104,131   $              96,582


                                                     Page 8 of 18
Taiga Motors Corporation
Notes to the Condensed Consolidated Interim Financial Statements – March 31, 2024
(Expressed in Canadian Dollars - Unaudited)


Note 10 - Property and equipment

                                                          Office
                                                 Furniture, R&D
                                                 Equipment and
                                                       Charging                                                Vehicles and
                                Project in               Station       Manufacturing                                  Demo         Computer          Leasehold
                                Progress                Network           Equipment              Tooling           Vehicles       Equipment       Improvements             Total

 Cost:
 December 31, 2023      $      1,107,472     $       2,072,451     $      5,166,750    $   16,726,764      $    1,761,270     $    775,726    $      1,017,846   $   28,628,279
 Additions                             -                13,933               61,258            20,634                    -               -                   -            96,095
 Disposals                             -                     -                    -                 -             (51,828)               -                   -          (51,828)
 March 31, 2024         $      1,107,472     $       2,086,384     $      5,228,278    $   16,747,398      $    1,709,442     $    775,726    $      1,017,846   $   28,672,546

 Accumulated
 Depreciation and
 Impairment:
 December 31, 2023      $      1,107,472     $         828,544     $      1,191,988    $    3,580,737      $      434,718     $    469,380    $       322,409    $    7,935,248
 Depreciation                          -                75,547              212,338           135,656              63,640           30,649             30,565           548,395
 Disposals                             -                     -                    -                 -              (1,728)               -                  -            (1,728)
 March 31, 2024         $      1,107,472     $         904,091     $      1,404,326    $    3,716,393      $      496,630     $    500,029    $       352,974    $    8,481,915

 Carrying amounts:
 December 31, 2023      $                -   $       1,243,907     $      3,974,762    $   13,146,027      $    1,326,552     $    306,346    $       695,437    $   20,693,031
 March 31, 2024         $                -   $       1,182,293     $      3,823,952    $   13,031,005      $    1,212,812     $    275,697    $       664,872    $   20,190,631

Project in progress relates to the construction of the Shawinigan manufacturing facility. The Company does not intend to use the facility in the foreseeable
future (note 15).




                                                                                  Page 9 of 18
Taiga Motors Corporation
Notes to the Condensed Consolidated Interim Financial Statements – March 31, 2024
(Expressed in Canadian Dollars - Unaudited)

Note 11 - Intangible assets

                                            Prototypes
                                          Development
                                                  Cost              Software        Patents                   Total
  Cost:
  As at December 31, 2023             $      14,553,459   $           41,093   $   1,481,892     $   16,076,444
  Additions                                           -                    -          27,222             27,222
  As at March 31, 2024                $      14,553,459   $           41,093   $   1,109,114     $   16,103,666

  Accumulated Amortization:
  As at December 31, 2023             $       4,877,677   $            7,534   $      51,048     $    4,936,259
  Amortization                                  722,673                2,055           6,627            731,355
  As at March 31, 2024                $       5,600,350   $            9,589   $      57,675     $    5,667,614
                                                                                                              -
  Carrying amounts:
  As at December 31, 2023             $       9,675,782   $           33,559   $   1,430,844     $   11,140,185
  As at March 31, 2024                $       8,953,109   $           31,504   $   1,451,439     $   10,436,052


Note 12 - Right-of-use assets

                                                                                                        Building
  As at December 31, 2023                                                                    $         8,908,180
  Depreciation                                                                                         (290,344)
  As at March 31, 2024                                                                       $         8,617,836


Note 13 - Trade payables and accrued liabilities

                                                                        March 31, 2024     December 31, 2023
  Trade payables                                                $           10,470,796   $        9,281,386
  Accrued salaries                                                           1,237,113            1,999,875
  Accrued liabilities                                                        4,517,919            3,669,133
  Other payables                                                                30,017                11,532
  Total trade payables and accrued liabilities                  $           16,255,845   $       14,961,926


Note 14 - Lease liabilities
The Company’s leases are comprised of buildings for its office and warehouse manufacturing space, and
equipment for industrial manufacturing purposes. The leases of office space run for a period ranging from four
to ten years, and the leases for equipment run for a period ranging from three months to one year. The equipment
leases include an option to purchase the assets at the end of the contract term.

The following table summarizes the continuity of the Company’s lease liabilities for each reporting period:

                                                                       March 31, 2024      December 31, 2023
  Balance, beginning of period                                  $           9,753,836    $       10,604,004
  Payment of lease obligations                                              (419,367)            (1,656,973)
  Interest expense on lease liabilities                                       190,746                806,805
  Balance, end of period                                        $           9,525,215    $         9,753,836




                                                  Page 10 of 18
Taiga Motors Corporation
Notes to the Condensed Consolidated Interim Financial Statements – March 31, 2024
(Expressed in Canadian Dollars - Unaudited)

The following table summarizes the contractual undiscounted cash flows from lease obligations:


  Maturity analysis - contractual undiscounted cash flows:                March 31, 2024       December 31, 2023
  Less than one year                                                 $         1,707,798     $        1,696,270
  One to five years                                                            7,043,638              7,033,385
  More than five years                                                         3,701,391              4,142,538
  Total undiscounted lease liabilities                               $        12,452,827     $       12,872,193

  Lease liabilities:
  Current                                                            $            992,737    $              961,692
  Non-current                                                        $          8,532,478    $            8,792,144
  Total lease liabilities                                            $          9,525,215    $           $9,753,836

(1)
   As at March 31, 2024, a lease liability of $4,480,513 (December 31, 2023 - $4,480,513) relating to the exercise of a
renewal option which the Company is reasonably certain to exercise has been recognized in lease obligations representing
$8,258,679 (December 31, 2023 - $8,258,679) of undiscounted cash flows. The weighted average incremental borrowing
rate applied to lease liabilities recognized in the statement of financial position is 8%.

Amounts recognized in statement of loss and comprehensive loss:

   For the three months ended:                                            March 31, 2024            March 31, 2023
  Interest on lease liabilities recorded in net financing income     $           109,746     $             208,011

Note 15 - Loans and borrowings

                                                                          March 31, 2024         December 31, 2023
  Unsecured federal government term loan principal due on
  December 31, 2025 with monthly interest payments beginning
  in January 2023 and ending in December 2025 at a fixed rate
  of 5%, if the amount is unpaid before December 31, 2023. The
  portion of the loan may be forgiven with early repayment by
  January 2024 (i)                                                   $                   -   $                51,145
  Secured Economic Development Agency of Canada term loan
  without interest repayable in 84 equal and consecutive monthly
  instalments with the first payment due and payable 36 months
  following the project completion date, being no later than
  March 21, 2024. The interest compounds monthly at a fixed
  rate of 10% (i) (ii)                                                          2,201,690                 2,149,849
  Convertible debentures repayable in March 2028 effective
  interest rate of 15.76%, with quarterly interest payments, which
  may, at the Company’s election, be paid in cash or by issuing
  additional “paid in kind” debentures with the same terms. Each
  Debenture is convertible, at the holder’s option, into common
  shares at a conversion price of $3.25 per share. Company has
  granted customary pre-emptive rights to Northern Private
  Capital in connection with any future offerings or issuances of
  equity or convertible equity or debt securities. (iii)                       42,722,562                41,195,782
  First tranche of secured federal term loan repayable in equal
  instalments starting in November 2024, maturing on February
  10, 2028 (“Term Loan”). The term loan bears interest on the
  drawn funds at the annual rate of the prevailing Canadian
  prime rate plus 5.00% and provides for multiple advances over
  a nine-month drawdown period. (iv)                                           15,018,741                15,011,415




                                                        Page 11 of 18
Taiga Motors Corporation
Notes to the Condensed Consolidated Interim Financial Statements – March 31, 2024
(Expressed in Canadian Dollars - Unaudited)

                                                                                     March 31, 2024             December 31, 2023
 Second tranche of secured federal term loan repayable in one
 installment on or before December 31, 2024. The term loan
 bears interest on the drawn funds at the annual rate of the
 prevailing Canadian prime rate plus 7.00% and provides for
 multiple advances over a period of six months. As at March 31,
 2024, an amount of $2,250,000 remained available for future
 draws. (iv)                                                                                3,713,759                                  -
 Other                                                                                              -                          2,617
 Total Loans and borrowings                                                 $              63,656,751      $              58,410,808
 Less: Current portion of loans and borrowings                              $               5,252,922      $                 587,165
 Non-current portion of loans and borrowings                                $              58,403,829      $              57,823,643
      (i)      The benefits received by the Company from these loans, where interest rates are lower than market rates, were
               accounted for under IAS 20, Accounting for Government Grants and Disclosure of Government Assistance and recorded
               as Other income in the Statement of Loss and Comprehensive Loss or offset against the assets to which the benefits
               relate to. Market interest rates of 8-10% were determined by looking at comparable loans with similar terms, adjusted
               for credit risk rating of the Company. The Company settled the loan during the three months ended March 31, 2024 and
               recognized gain of $11,145 on debt settlement classified as net financing cost in the condensed consolidated interim
               statement of loss.
      (ii)     On December 28, 2022, the Company received a $4,000,000 loan from Economic Development Agency of Canada to
               cover the acquisition and installation of research, development, and production equipment, including specialized
               equipment for the battery, snowmobile, and watercraft assembly lines. The difference of the total value and present
               value $1,952,901 has been treated as a government grant, which has been applied against the related costs for which
               the loan was intended, primarily property, plant and equipment. The Agency provided notice to the Company that it
               considered that the Company was not in compliance under its loan agreement, starting on February 23, 2024, when the
               Company confirmed that it would not complete the construction of the Shawinigan facility in accordance with provisions
               of the loan agreement. No funds were received by the Company for the Shawinigan phase of the loan agreement. The
               Agency also acknowledged that there were no compliance issues under the agreement regarding the $4 million
               disbursed in connection with the Montreal phase of the project before February 23, 2024. The Agency has confirmed
               that it has waived its rights under the agreement specifically and only in relation to the non-construction of the Shawinigan
               facility. The loan contains certain affirmative and negative covenants, including covenants relating to the Company’s
               project and the location of the financed equipment, as well as certain financial covenants.
      (iii)    The convertible debentures contains certain affirmative and negative covenants, including covenants relating to the
               Company’s operations and statutes, as well as certain financial covenants.
      (iv)     The Term Loan contains certain affirmative and negative covenants, including covenants relating to the Company’s
               operations and statutes, as well as certain financial covenants. The Company must maintain a current ratio greater than
               1.10 to 1.00 starting in the fourth quarter of 2024, 1.15 to 1.00 in 2025, and 1.25 to 1.00 thereafter as well as a quarterly
               cashflow from operations equal to or greater than $4,000,000 commencing in the last fiscal quarter of 2024. There is a
               risk that the Company fails to meet the one or more of these covenants in the last quarter of 2024. Attaining these
               covenants is dependent on the Company’s ability to raise sufficient funds to scale production and reduce unit costs, and
               to significantly increase sales volumes and generate profits thereon. If the Company does not meet one or more of these
               covenants, it will be considered an event of default and the lender could demand immediate repayment of the loan at
               that time. This could also trigger cross default clauses on other loans. See Note 2.

Capital repayments due on loans and borrowings, for the next five years and thereafter are as follows:

                                Year:
                                Less than 1 year                                       $      5,252,922
                                1 – 5 years                                                  57,171,931
                                More than 5 years                                             1,231,898
                                Total                                                  $     63,656,751

Convertible debentures

The following table summarizes the continuity of the Company’s convertible debentures for the periods ended:

                                                                                     March 31, 2024             December 31, 2023
 Opening balance                                                            $              41,195,782      $                           -
 Net proceeds from issuance of the Debentures                                                          -                  36,794,020
 Accretion of interests                                                                     1,526,780                      4,401,762
 Ending balance                                                             $              42,722,562      $              41,195,782

                                                            Page 12 of 18
Taiga Motors Corporation
Notes to the Condensed Consolidated Interim Financial Statements – March 31, 2024
(Expressed in Canadian Dollars - Unaudited)

Note 16 - Share capital

Common shares

Authorized: unlimited number of voting common shares without par value

                                                                  Number of shares                  Amount
 Balance as at December 31, 2023 and March 31, 2024                    31,825,712      $         321,163,338

Note 17 - Share-based payments
Warrants

Continuity of warrants reserved classified as contributed surplus in the statement of financial position is as
follows:

                                                                 Number of warrants                 Amount
 Balance as at December 31, 2023 and March 31, 2024                       1,794,354    $          12,739,714

The outstanding warrants with exercise price of $17.25 expire on April 21, 2026. The weighted average
remaining contractual life of outstanding warrants as at March 31, 2024 is 2 years.

Incentive stock options

Historically, Taiga Motors Inc. made equity-based awards by issuing options under the Company’s employee
stock option plan effective as of October 16, 2015, as amended from time to time (the “Legacy Option Plan”).
In connection with the Merger, the Legacy Option Plan was amended to, among other things, comply with the
requirements of the TSX, render the outstanding options exercisable for common shares of Taiga Motors
Corporation and to prohibit further awards under the Legacy Option Plan.

On April 21, 2021, the Company established an omnibus incentive plan (the “Omnibus Incentive Plan”) for
awards to eligible directors, officers, employees and consultants. The Company has the right to make such
grants for a period of 3 years from the establishment of the Omnibus Incentive Plan and then needs to get the
approval of the Board and the Shareholders every 3 years. The Plan is intended to help the Company secure
and retain the services and provide incentives for increased efforts for the success of the Company. The Board
of Directors grants awards from time to time based on its assessment of the appropriateness of doing so in
light of the long-term strategic objectives of the Company, its current stage of development, the need to retain
or attract particular key personnel, the number of awards already outstanding and overall market conditions.

On August 18, 2021, the Company amended and restated the Omnibus Incentive Plan. No material changes
resulted from these amendments.

The number of common shares reserved for issuance under the Legacy Option Plan will not exceed 1,305,790.
Unless otherwise decided by the Board, the term of the option cannot exceed 10 years and will vest gradually
over a period of 4 years. The number of common shares reserved for issuance under the Omnibus Incentive
Plan will not exceed 10% of the total issued and outstanding shares on a non-diluted basis (3,182,571 as at
March 31, 2024). Repurchase, exercise or return of previously issued awards to the Omnibus Incentive Plan
increase the number of shares available for issue.




                                                 Page 13 of 18
Taiga Motors Corporation
Notes to the Condensed Consolidated Interim Financial Statements – March 31, 2024
(Expressed in Canadian Dollars - Unaudited)

Movements in the number of stock options outstanding and their related weighted average exercise prices are
as follows:

                                                                                                      Weighted
                                                                                   Weighted             average
                                                             Number of               average       remaining life
                                                                options        exercise price            (years)
 Balance, December 31, 2023                                   2,558,373    $             1.54               7.64
 Forfeited                                                    (107,881)                  1.93
 Expired                                                        (15,905)                 0.03
 Balance, March 31, 2023                                      2,464,587    $             3.64               7.76

The weighted average exercise price of options outstanding and exercisable at March 31, 2024 is $1.51
(December 31, 2023 - $1.54).

The following tables provide additional information about the Company’s stock options as at March 31, 2024:

                                                          Number of            Weighted
                                                             options             average
                               Exercise price ($)        outstanding        remaining life
                                             0.47            184,165                 0.49
                                             1.02             61,998                 1.64
                                             1.15             19,184                 2.19
                                             1.34             15,000                 9.46
                                             1.60          1,822,984                 8.96
                                             1.93            361,256                 6.71
                        Outstanding, end of period         2,464,587                 7.76
                        Exercisable, end of period         1,161,219                 6.21

 Deferred stock units

 Deferred stock units (“DSU”) are time-based awards and all the amount of DSUs granted will vest
 immediately upon grant for the service period for which they are awarded.

  For the three-months periods ended                                   March 31, 2024            March 31, 2023
  Share-based payments related to DSU                            $             47,900   $                81,489

 The value of deferred stock units was re-measured since the grant date based on the market price of
 Company’s common share at the reporting date, the gain of $69,466 (the three months ended March 31,
 2023 – the gain of $103,231) was included in the consolidated statements of loss and compressive loss as
 general and administration. The outstanding DSUs are recorded as share-based compensation liability until
 exercise in the condensed consolidated interim statements of financial position.

                                                                                                Number of DSUs
  Balance, December 31, 2023                                                                           267,177
  Granted                                                                                                76,032
  Balance, March 31, 2024                                                                              343,209

 Note 18 - Related party transactions and balances

 Key management personnel compensation

 Key management personnel include those persons having authority and responsibility for planning, directing
 and controlling the activities of the Company as a whole. The Company defines key management personnel
 as being the directors and key officers.
 The compensation awarded to key management personnel is as follows:

                                                 Page 14 of 18
Taiga Motors Corporation
Notes to the Condensed Consolidated Interim Financial Statements – March 31, 2024
(Expressed in Canadian Dollars - Unaudited)



  For the three-months periods ended                                March 31, 2024              March 31, 2023
  Salaries, wages and benefits                        $                    548,037   $                 665,526
  Share-based payments                                                     151,676                     177,611
  Total compensation                                  $                    699,713   $                 843,137


 Note 19 - Revenue
 All of the Company’s revenue is derived from contracts with customers. Revenues are disaggregated by
 product line and geography:

  For the three-months periods ended                                    March 31, 2024          March 31, 2023
  Sale of powersport vehicles                                   $            5,074,533   $           1,728,030
  Sale of branded apparel                                                        2,636                   1,412
  Total                                                         $            5,077,169   $           1,729,442


  For the three-months periods ended                                    March 31, 2024          March 31, 2023
  Brazil                                                        $            1,424,777   $                   -
  Canada                                                                       693,017                 874,088
  United States of America                                                   2,483,029                 855,354
  Other                                                                        476,346                       -
  Total                                                         $            5,077,169   $           1,729,442


  For the three-months periods ended                                    March 31, 2024          March 31, 2023
  Sales with payment terms                                      $               11,684   $                   -
  Prepaid sales                                                              5,065,485               1,729,442
  Total                                                         $            5,077,169   $           1,729,442


  For the three-months periods ended                                    March 31, 2024          March 31, 2023
  Sales to distributors                                         $            1,836,153   $                   -
  Sales direct to consumers                                                  3,241,016               1,729,442
  Total                                                         $            5,077,169   $           1,729,442

 Changes in deferred revenue balances during the period are as follows:


                                                                                             Deferred revenue
  Balance at December 31, 2023                                                           $           1,481,409
  Additions                                                                                          3,981,188
  Recognized as revenue during the period                                                          (5,065,485)
  Balance at March 31,2024                                                               $             397,112


Note 20 - Financial instruments

Fair values

When measuring the fair value of an asset or a liability, the Company uses observable market data as far as
possible. Fair values are categorized into different levels in a fair value hierarchy based on the inputs in the
valuation techniques as follows:




                                                 Page 15 of 18
Taiga Motors Corporation
Notes to the Condensed Consolidated Interim Financial Statements – March 31, 2024
(Expressed in Canadian Dollars - Unaudited)

         Level 1 – Quoted (unadjusted) market prices in active markets for identical assets or liabilities
         Level 2 – Valuation techniques for which the lowest level input that is significant to the fair value
          measurement is directly or indirectly observable
         Level 3 – Valuation techniques for which the lowest level input that is significant to the fair value
          measurement is unobservable

The carrying values of cash and cash equivalents, receivables, trade payables and accrued liabilities,
customer deposits, approximate their fair values due to the immediate or short-term nature of these
instruments. The fair values of loans and borrowings approximate their carrying values. There has been no
significant change in credit and market interest rates since the date of their issuance.

Fair value estimates are made at a specific point in time, based on relevant market information and information
about financial instruments. These estimates are subjective in nature and involve uncertainties and matters of
significant judgment and, therefore, cannot be determined with precision. Change in assumptions could
significantly affect the estimates.

The following table summarizes the classification of the Company’s financial instruments under IFRS 9:


             Financial assets
             Cash and cash equivalent                                                      Amortized cost
             Receivables                                                                   Amortized cost

             Financial liabilities
             Trade payables and accrued liabilities                                        Amortized cost
             Share-based compensation liability                                            Amortized cost
             Customer deposits                                                             Amortized cost
             Loans and borrowings                                                          Amortized cost

Capital and Risk Management
The Company’s objective and polices for managing capital are to safeguard its ability to continue as a going
concern in order to provide returns for shareholders and benefits for other stakeholders and to maintain an
optimal capital structure to reduce the cost of capital. The Company defines the components of its capital
structure as being long-term debt and bank loans, net of cash, plus equity. The Company manages its capital
structure and makes changes based on economic conditions, risks that impact the operations and future
significant capital investment opportunities. In order to maintain or adjust its capital structure, the Company
may issue new equity instruments or raise additional debt financing.

The Company is exposed to a variety of financial risks by virtue of its activities: market risk, interest rate risk,
liquidity risk and foreign currency risk. The Board of Directors has overall responsibility for the determination
of the Company’s capital and risk management objectives and policies while retaining ultimate responsibility
for them. The Company’s overall capital and risk management program has not changed throughout the
period. It focuses on the unpredictability of financial markets and seeks to minimize potential adverse effects
on financial performance. Risk management is carried out by the finance department under policies approved
by the Board of Directors. The finance department identifies and evaluates financial risks in close cooperation
with management.

Interest rate risk
Interest rate risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because
of changes in market interest rates. Most of the Company’s interest-bearing debt instruments have fixed
interest rates and are not subject to interest rate cash flow risk. The Company has secured government term
loan bearing interest at a variable rate as disclosed in Note 15.



                                                      Page 16 of 18
Taiga Motors Corporation
Notes to the Condensed Consolidated Interim Financial Statements – March 31, 2024
(Expressed in Canadian Dollars - Unaudited)

The interest-bearing financial instruments, as reported in the financial statements, have the following interest
rate profile:

                                                                          March 31, 2024          December 31, 2023
 Fixed rate instruments                                          $            44,924,252      $         43,399,423
 Variable rate instruments                                                    18,732,499                15,011,385
 Total                                                           $             63,656,751     $         58,410,808

A change of 100 basis points in interest rates would have increased or decreased equity by $187,000 as at
March 31, 2024 (December 31, 2023 - $150,000).

Liquidity risk
Liquidity risk is the risk that the Company will not be able to meet its financial obligations as they fall due. The
Company generally relies on external financing or key management to provide sufficient liquidity to meet
budgeted operating requirements. The following table sets forth details of the payment profile of financial
liabilities based on their undiscounted cash flows:

                                                 Total
                                              carrying    Contractual     Less than 1                      More than 5
                                               amount      cash flows            year       1 to 5 years         years
                                                     $              $               $                  $             $
 Trade payables and accrued
 liabilities                               16,255,845       16,255,845     16,255,845                  -             -
 Share-based compensation liability           216,222          216,222         216,222                 -             -
 Customer deposits                          1,137,826        1,137,826       1,137,826                 -             -
 Loans and borrowings                      63,656,751     104,313,818       7,544,076        93,960,211      2,809,524
 Total                                     81,266,644     121,923,711      25,153,969        93,960,211      2,809,524
The contractual obligations for loans and borrowings are disclosed in Note 15.

Taking into consideration the Company’s current cash position, volatile equity markets, global uncertainty in
the capital markets and increasing cost pressures, the Company is continuing to review its needs to seek
financing opportunities in accordance to its capital risk management strategy.

As at March 31, 2024, the Company had issued letters of credit for an amount of U.S. $400,000 ($542,000,
$541,785 as at December 31, 2023).

Credit Risk
Credit risk is the risk of a loss if a customer or counterparty to a financial instrument fails to meet its contractual
obligations. The Company regularly monitors credit risk exposure and takes steps to mitigate the likelihood of
this exposure resulting in losses.

The Company’s exposure to credit risk currently relates primarily to cash, which it manages by dealing only
with highly rated Canadian financial institutions. The Company invests its excess cash with varying terms to
maturity selected with regard to the expected timing of investments or expenditures for continuing operations.
The Company started doing sales with payment terms to some fleet customers, but total exposure remained
fairly limited as the vast majority of the sales were prepaid. As at March 31, 2024, the Company believes it
was not exposed to any significant credit risk. The Company’s maximum credit exposure corresponded to the
carrying amount of these financial assets.




                                                    Page 17 of 18
Taiga Motors Corporation
Notes to the Condensed Consolidated Interim Financial Statements – March 31, 2024
(Expressed in Canadian Dollars - Unaudited)

Foreign currency risk
Foreign currency risk is defined as the risk that the fair value of future cash flows of a financial instrument will
fluctuate because of changes in foreign exchange rates. The Company maintains financial instruments and
enters into transactions denominated in foreign currencies, principally in USD, which exposes the Company
to fluctuating balances and cash flows due to various in foreign exchange rates. The current exposure to
foreign currency risk remains very limited.

Note 21 - Provisions

Warranty provisions
The Company provides warranties for general repairs of defects that existed at the time of sale, as required
by law. Provisions related to these assurance-type warranties are recognized when the product is sold.

Note 22 - Supplemental cash flow information

 For the three-months periods ended                                     March 31, 2024           March 31, 2023
 Non-cash additions to property and equipment                   $              127,949    $             197,607
 Non-cash additions to intangible assets                                        42,519                   54,463


Note 23 - Net financing cost

 For the three-months periods ended                                     March 31, 2024           March 31, 2023
 Finance costs on lease liabilities                             $              190,746    $             208,011
 Finance costs on loans and borrowings                                       2,081,994                  144,203
 Finance income                                                                (29,583)                (72,889)
 Other finance cost (income)                                                   (12,214)                     342
 Net financing cost (income)                                    $            2,230,943    $             279,667




                                                   Page 18 of 18
                            © TAIGA MOTORS INC. 2024 - All rights reserved
Taiga™, Nomad™, Orca™ and related trademarks, names and logos are the property of Taiga Motors Inc.
    and are registered and/or used in Canada, the U.S. and countries around the world. Use of same
                  is not permitted without the prior written consent of Taiga Motors Inc.


[READING ORDER TEXT]
For the three-month periods ended
March 31, 2024 and March 31, 2023 (Unaudited)
These financial statements have not been reviewed by the Company’s external, independent auditors
TAIGA MOTORS CORPORATION
Condensed Consolidated Interim Financial Statements
(Expressed in Canadian Dollars, unless otherwise noted)Taiga Motors Corporation
Condensed Consolidated Interim Statements of Financial Position
(Expressed in Canadian Dollars - Unaudited)
The accompanying notes are an integral part of these condensed consolidated interim financial statements.
As at Notes March 31, 2024 December 31, 2023
ASSETS
Current assets
Cash and cash equivalents $ 2,507,715 $ 5,301,523
Receivables 7 2,114,178 5,389,617
Inventories 8 32,399,317 33,241,609
Prepaid expenses and deposits 9 1,809,331 2,457,766
Total current assets $ 38,830,541 $ 46,390,515
Non-current assets
Prepaid expenses and deposits 9 104,131 96,582
Property and equipment 10 20,190,631 20,693,031
Intangibles 11 10,436,052 11,140,185
Right-of-use assets 12 8,617,836 8,908,180
TOTAL ASSETS $ 78,179,191 $ 87,228,493
LIABILITIES
Current Liabilities
Trade payables and accrued liabilities 13 $ 16,255,845 $ 14,961,926
Share-based compensation liability 216,222 237,788
Deferred revenue 397,112 1,481,409
Customer deposits 1,137,826 1,236,334
Current portion of lease liabilities 14 992,737 961,692
Current portion of loans and borrowings 15 5,252,922 587,165
Provisions 21 1,998,026 1,958,869
Total current liabilities 26,250,690 21,425,183
Non-current Liabilities
Lease liabilities 14 8,532,478 8,792,144
Loans and borrowings 15 58,403,829 57,823,643
TOTAL LIABILITES 93,186,997 88,040,970
SHAREHOLDERS’ EQUITY
Share capital 16 323,937,503 323,937,503
Contributed surplus 17,18 23,936,791 23,750,237
Deficit (362,882,100) (348,500,217)
TOTAL SHAREHOLDERS’ DEFICIENCY (15,007,806) (812,477)
TOTAL LIABILITIES AND SHAREHOLDERS’ DEFICIENCY $ 78,179,191 $ 87,228,493
Nature of operations (Note 2)
Approved on behalf of the Board by:
(Signed) (Signed)
Andrew Lapham, Chairman of the Board Martin Picard, Audit Committee ChairTaiga Motors Corporation
Condensed Consolidated Interim Statements of Net Loss and Comprehensive Loss
(Expressed in Canadian Dollars - Unaudited)
The accompanying notes are an integral part of these condensed consolidated interim financial statements.
Three-months Three-months
For the periods ended Notes March 31, 2024 March 31, 2023
Revenue 19 $ 5,077,169 $ 1,729,442
Cost of sales 8,749,160 5,783,783
Gross loss (3,671,991) (4,054,341)
Expenses
Research and development (net of tax credits) 3,018,017 3,914,424
General and administration 4,381,982 5,016,309
Sales and marketing 1,078,950 1,034,272
Loss before other expenses (12,150,940) (14,019,346)
Other expenses (income)
Net financing cost 23 2,230,943 279,667
Loss before tax (14,381,883) (14,299,013)
Deferred income tax recovery - 1,311,987
Net loss and comprehensive loss for the period $ (14,381,883) $ (12,987,026)
Basic and diluted loss per common share $ (0.45) $ (0.41)
Weighted average number of common shares
outstanding 31,825,712 31,825,712Taiga Motors Corporation
Condensed Consolidated Interim Statements of Changes in Equity (Deficiency)
(Expressed in Canadian Dollars - Unaudited)
The accompanying notes are an integral part of these condensed consolidated interim financial statements.
Notes
Share
capital
Contributed
Surplus Deficit Total
Balance as at December 31, 2022 $ 323,937,503 $ 18,313,353 $ (276,002,216) $ 66,248,640
Share-based payments - 515,638 - 515,638
Convertible bond conversion option, net of income tax effect - 3,638,907 - 3,638,907
Net loss and comprehensive loss for the period - - (12,987,026) (12,987,026)
Balance as at March 31, 2023 $ 323,937,503 $ 22,467,898 $ (288,989,242) $ 57,416,159
Balance as at December 31, 2023 $ 323,937,503 $ 23,750,237 $ (348,500,217) $ (812,477)
Share-based payments 17,18 - 186,554 - 186,554
Net loss and comprehensive loss for the period - - (14,381,883) (14,381,883)
Balance as at March 31, 2024 $ 323,937,503 $ 23,936,791 $ (362,882,100) $ (15,007,806)Taiga Motors Corporation
Condensed Consolidated Interim Statements of Cash Flows
(Expressed in Canadian Dollars - Unaudited)
The accompanying notes are an integral part of these condensed consolidated interim financial statements.
Three months Three months
For the periods ended Notes March 31, 2024 March 31, 2023
Cash (used in) provided by:
OPERATING ACTIVITIES
Net loss for the period $ (14,381,883) $ (12,987,026)
Non-cash items:
Depreciation and amortization 10,11,12 1,568,366 1,503,281
Net financing cost 23 2,230,943 279,667
Deferred income tax recovery - (1,311,987)
Share-based payments 17 186,554 597,127
Foreign currency loss (gain) (79,371) 17,599
Net change in provisions 21 39,157 82,155
Reversal of inventory write-down 8 (1,455,353) -
Impairment of property and equipment - 61,165
Changes in non-cash working capital items
Receivables 3,275,439 (560,870)
Inventory 2,297,646 (3,542,703)
Prepaid expenses and deposits 640,886 (925,827)
Trade payables and accrued liabilities 1,544,664 (953,564)
Customer deposits (98,508) (101,710)
Deferred revenue (1,084,297) 1,021,638
Share-based compensation liability (21,566) (103,233)
Net cash used in operating activities $ (5,337,323) $ (16,924,287)
INVESTING ACTIVITIES
Acquisition of property and equipment 10 $ (224,044) $ (1,302,187)
Proceeds from disposal of property and equipment 10 51,828 -
Expenditures on intangible assets 11 (69,741) (69,919)
Interest received 23 29,583 72,889
Net cash used in investing activities $ (212,374) $ (1,299,217)
FINANCING ACTIVITIES
Interest paid $ (646,999) $ (218,098)
Repayment of lease liabilities 14 (228,621) (203,806)
Repayment of loans and borrowings 15 (42,647) (24,587)
Proceeds from loans, net of transactions costs 15 3,674,156 39,650,000
Transaction costs 15 - (3,303,041)
Net cash provided by (used in) financing activities $ 2,755,889 $ 35,900,468
Net increase (decrease) in cash in the period $ (2,793,808) $ 17,676,964
Cash – beginning of the period $ 5,301,523 $ 22,838,362
Cash – end of the period $ 2,507,715 $ 40,515,326
Supplemental cash flow information (Note 22)Taiga Motors Corporation
Notes to the Condensed Consolidated Interim Financial Statements – March 31, 2024
(Expressed in Canadian Dollars - Unaudited)
Page 6 of 18
Note 1 - Reporting entity
Taiga Motors Corporation (the "Company" or "Taiga"), was incorporated under the laws of the province of
British Columbia on March 13, 2019. Taiga’s head office is 2695 Dollard Avenue, LaSalle, Québec, H8N 2J8.
Its registered office is located at 550 Burrard Street, Suite 2900, Vancouver, British Columbia, V6C 0A3. These
consolidated financial statements comprise the Company and its wholly-owned subsidiaries Taiga Motors Inc.,
CGGZ Finance Corp. and Taiga Motors America Inc. (“Taiga USA”) (together referred as the "Group").
Note 2 - Nature of operations
The Group is focused on research and development, design, production, marketing and distribution of all-
electric powersport vehicles.
These condensed consolidated interim financial statements have been prepared in accordance with IFRS
Accounting Standards as issued by the International Accounting Standards Board (“IASB”), on a going concern
basis, which contemplates the realization of assets and discharge of liabilities at their carrying values in the
ordinary course of operations for the foreseeable future.
During the three-month period ended March 31, 2024, the Company generated a net loss of $14,381,883
(March 31, 2023 - $12,987,026) and negative cash flows from operating activities of $5,337,323 (March 31,
2023 – $16,924,287). As at March 31, 2024, the Company has an accumulated deficit of $362,882,100
(December 31, 2023 - $348,500,217) and a working capital (current assets less current liabilities) of
$12,307,596 (December 31, 2023 – $24,965,332). The Company’s current liabilities and expected level of
expenditures for the next twelve months exceed cash on hand of $2,507,715 at December 31, 2023. In
addition, the Economic Development Agency of Canada (the “Agency”) provided notice to the Company that
it considered that the Company was not in compliance under its loan agreement, starting on February 23,
2024, when the Company confirmed that it would not complete the construction of the Shawinigan facility in
accordance with provisions of the loan agreement. No funds were received by the Company for the Shawinigan
phase of the loan agreement and the Agency provided a waiver for this matter (see Note 14).
Given the Company's stage of development and until it can generate significant profitable operations, the
Company expects to continue financing its operations through a combination of public and/or private equity
and/or debt financings or other sources in order to meet its business plan. The Company will require additional
financing in the near future in order to fund future operations and obligations, and meet its business plan
subsequent to March 31, 2024. The Company is actively managing its liquidity pending additional financing.
While the Company has been successful in securing financing in the past, raising additional funds is dependent
on a number of factors outside the Company’s control, and as such there is no assurance that it will be able
to do so in the future. These events or conditions indicate that a material uncertainty that may cast significant
doubt on the Company’s ability to continue as a going concern.
Given all of the above, Taiga is in the process of taking a number of steps to restructure its operations and to
reduce its operating expenses, including by significantly downsizing the scale and scope of its operations and
by reducing its number of employees, and the Company may well be required to take additional restructuring
measures in the near term. However, there can be no assurance that any such downsizing efforts and
initiatives currently underway or that may be undertaken by the Company in the near term will prove to be
effective in sufficiently reducing the Company’s operating cash burn and, as such, there can be no assurance
that the Company will be able to continue as a going concern and continue to pay its obligations and liabilities
as they become due.
The Company’s continuing operations as intended are dependent upon its ability to attain profitable operations
and generate funds therefrom, adhere to the terms of its lending facilities, and/or raise equity capital or obtain
the necessary financing sufficient to meet current and future obligations.
These condensed consolidated interim financial statements do not include any adjustments to the
classification and amounts of assets and liabilities that may be required should the Corporation be unable to
continue as a going concern. Such adjustments could be material.Taiga Motors Corporation
Notes to the Condensed Consolidated Interim Financial Statements – March 31, 2024
(Expressed in Canadian Dollars - Unaudited)
Page 7 of 18
Note 3 - Basis of presentation and statement of compliance
These condensed consolidated interim financialstatements have been prepared in accordance with International
Accounting Standard 34, “Interim Financial Reporting”, as issued by the International Accounting Standards
Board (“IASB”). IFRS included IFRSs, International Accounting Standards (“IAS”), and interpretations issued by
the IFRS Interpretations Committee (“IFRIC”).
These condensed consolidated interim financial statements do not include all the information required for full
annual financial statements and should be read in conjunction with the audited financial statements for the year
ended December 31, 2023 which have been prepared in accordance with IFRS.
They have been prepared on a historical cost basis, except for:
(i) liability-classified share-based payment arrangements, which are measured at fair value at each
reporting date pursuant to IFRS 2, Share-based Payment;
(ii) equity-classified share-based payment arrangements which are measured at fair value at grant date
pursuant to IFRS 2, Share-based Payment; and
(iii) lease liabilities, which are initially measured at the present value of lease payments not paid at the
commencement date in accordance with IFRS 16, Leases.
These condensed consolidated interim financial statements were approved and authorized for issuance by
the Board of Directors on May 14, 2024.
Note 4 - Material accounting policies
Significant accounting policies applied to these condensed consolidated interim financial statements are the
same as those applied to the Company’s audited financial statements for the year ended December 31, 2023.
Amendments to IAS 1 – Presentation of Financial Statements
In October 2022, the IASB issued amendments to IAS 1, Presentation of Financial Statements titled Non-
current Liabilities with Covenants. These amendments sought to improve the information that an entity
provides when its right to defer settlement of a liability is subject to compliance with covenants within 12 months
after the reporting period. These amendments to IAS 1 override and incorporate the previous amendments,
Classification of Liabilities as Current or Non-current, issued in January 2020, which clarified that liabilities are
classified as either current or non-current depending on the rights that exist at the end of the reporting period.
Liabilities should be classified as non-current if a company has a substantive right to defer settlement for at
least 12 months at the end of the reporting period. The amendments are effective for annual periods beginning
on or after January 1, 2024 and adoption of these amendments did not have an effect on our financial
statements.
Note 5 - Significant accounting judgments, estimates and assumptions
The preparation of the Company’s condensed consolidated interim financial statements in accordance with
IFRS requires management to make judgments, estimates and assumptions that affect the reported amounts
of assets, liabilities, revenues and expenses and accompanying disclosures. Uncertainty about these
assumptions and estimates could result in outcomes that require a material adjustment to the carrying amount
of assets or liabilities in future periods. These assumptions and estimates are regularly reviewed. Revisions
to accounting estimates are recognized in the period in which the estimates are revised and in any future
periods affected.
The significant judgments made by management in applying the Company’s accounting policies and the key
sources of estimation uncertainty are the same as those applied to the Company’s audited financial statements
for the year ended December 31, 2023.Taiga Motors Corporation
Notes to the Condensed Consolidated Interim Financial Statements – March 31, 2024
(Expressed in Canadian Dollars - Unaudited)
Page 8 of 18
Note 6 - Segment reporting
The Company operates in one operating segment. For the purpose of segment reporting, the Company’s Chief
Executive Officer ("CEO") is the Chief Operating Decision Maker. The determination of the Company’s
operating segment is based on its organization structure and how the information is reported to CEO on a
regular basis. All the Company’s significant assets are located in Canada.
Note 7 - Receivables
March 31, 2024 December 31, 2023
SR&ED credit receivable $ 1,023,497 $ 1,760,060
Sales taxes receivable 959,696 2,422,494
Trade receivables 130,985 1,207,063
Total receivables $ 2,114,178 $ 5,389,617
SR&ED credits receivable comprise of research and development investment tax credits receivable which
relate to eligible research and development expenditures under the applicable tax laws. The amounts recorded
as receivables are subject to a government tax audit and the final amounts received may differ from those
recorded. There are no unfulfilled conditions or contingencies associated with the government assistance
received.
Note 8 - Inventories
Inventories consist of the following:
March 31, 2024 December 31, 2023
Raw materials $ 14,291,701 $ 17,767,565
Work in progress 4,548,364 4,575,024
Finished goods 13,559,252 10,899,020
Total inventories $ 32,399,317 $ 33,241,609
The cost of inventories recognized as expense during the three-month period totals $4,906,873 ($3,644,192
in 2023) and was recognized in the cost of sales in the consolidated statements of loss. The company
reversed $1,355,353 of net realisable value provision during the three-month period to close the period with
a remaining provision of $6,995,832 (for the three-month period ended March 31, 2023 - $909,501).
The Company reversed an expense of $100,000 related to raw materials in the three-month period ended
March 31, 2024 (for the three-month period ended March 31, 2023 expense of $186,893) due to
obsolescence. The provision was included in the cost of sales. Total obsolescence provision amounts to
$3,147,435 as at March 31, 2024 ($3,247,435 as at December 31, 2023).
Note 9 - Prepaid expenses and deposits
March 31, 2024 December 31, 2023
Security and other deposits $ 11,749 $ 11,749
Prepaid insurance 99,356 506,831
Prepaid inventory and supplies 683,112 937,280
Deposits to suppliers related to property and equipment 104,131 96,582
Other prepaid expenses 1,015,114 1,001,906
Total prepaid expenses and deposits $ 1,913,462 $ 2,554,348
Current portion of prepaid expenses and deposits 1,809,331 2,457,766
Non-current portion of prepaid expenses and deposits $ 104,131 $ 96,582Taiga Motors Corporation
Notes to the Condensed Consolidated Interim Financial Statements – March 31, 2024
(Expressed in Canadian Dollars - Unaudited)
Page 9 of 18
Note 10 - Property and equipment
Project in
Progress
Office
Furniture, R&D
Equipment and
Charging
Station
Network
Manufacturing
Equipment Tooling
Vehicles and
Demo
Vehicles
Computer
Equipment
Leasehold
Improvements Total
Cost:
December 31, 2023 $ 1,107,472 $ 2,072,451 $ 5,166,750 $ 16,726,764 $ 1,761,270 $ 775,726 $ 1,017,846 $ 28,628,279
Additions - 13,933 61,258 20,634 - - - 96,095
Disposals - - - - (51,828) - - (51,828)
March 31, 2024 $ 1,107,472 $ 2,086,384 $ 5,228,278 $ 16,747,398 $ 1,709,442 $ 775,726 $ 1,017,846 $ 28,672,546
Accumulated
Depreciation and
Impairment:
December 31, 2023 $ 1,107,472 $ 828,544 $ 1,191,988 $ 3,580,737 $ 434,718 $ 469,380 $ 322,409 $ 7,935,248
Depreciation - 75,547 212,338 135,656 63,640 30,649 30,565 548,395
Disposals - - - - (1,728) - - (1,728)
March 31, 2024 $ 1,107,472 $ 904,091 $ 1,404,326 $ 3,716,393 $ 496,630 $ 500,029 $ 352,974 $ 8,481,915
Carrying amounts:
December 31, 2023 $ - $ 1,243,907 $ 3,974,762 $ 13,146,027 $ 1,326,552 $ 306,346 $ 695,437 $ 20,693,031
March 31, 2024 $ - $ 1,182,293 $ 3,823,952 $ 13,031,005 $ 1,212,812 $ 275,697 $ 664,872 $ 20,190,631
Project in progress relates to the construction of the Shawinigan manufacturing facility. The Company does not intend to use the facility in the foreseeable
future (note 15).Taiga Motors Corporation
Notes to the Condensed Consolidated Interim Financial Statements – March 31, 2024
(Expressed in Canadian Dollars - Unaudited)
Page 10 of 18
Note 11 - Intangible assets
Prototypes
Development
Cost Software Patents Total
Cost:
As at December 31, 2023 $ 14,553,459 $ 41,093 $ 1,481,892 $ 16,076,444
Additions - - 27,222 27,222
As at March 31, 2024 $ 14,553,459 $ 41,093 $ 1,109,114 $ 16,103,666
Accumulated Amortization:
As at December 31, 2023 $ 4,877,677 $ 7,534 $ 51,048 $ 4,936,259
Amortization 722,673 2,055 6,627 731,355
As at March 31, 2024 $ 5,600,350 $ 9,589 $ 57,675 $ 5,667,614
-
Carrying amounts:
As at December 31, 2023 $ 9,675,782 $ 33,559 $ 1,430,844 $ 11,140,185
As at March 31, 2024 $ 8,953,109 $ 31,504 $ 1,451,439 $ 10,436,052
Note 12 - Right-of-use assets
Building
As at December 31, 2023 $ 8,908,180
Depreciation (290,344)
As at March 31, 2024 $ 8,617,836
Note 13 - Trade payables and accrued liabilities
March 31, 2024 December 31, 2023
Trade payables $ 10,470,796 $ 9,281,386
Accrued salaries 1,237,113 1,999,875
Accrued liabilities 4,517,919 3,669,133
Other payables 30,017 11,532
Total trade payables and accrued liabilities $ 16,255,845 $ 14,961,926
Note 14 - Lease liabilities
The Company’s leases are comprised of buildings for its office and warehouse manufacturing space, and
equipment for industrial manufacturing purposes. The leases of office space run for a period ranging from four
to ten years, and the leases for equipment run for a period ranging from three months to one year. The equipment
leases include an option to purchase the assets at the end of the contract term.
The following table summarizes the continuity of the Company’s lease liabilities for each reporting period:
March 31, 2024 December 31, 2023
Balance, beginning of period $ 9,753,836 $ 10,604,004
Payment of lease obligations (419,367) (1,656,973)
Interest expense on lease liabilities 190,746 806,805
Balance, end of period $ 9,525,215 $ 9,753,836Taiga Motors Corporation
Notes to the Condensed Consolidated Interim Financial Statements – March 31, 2024
(Expressed in Canadian Dollars - Unaudited)
Page 11 of 18
The following table summarizes the contractual undiscounted cash flows from lease obligations:
Maturity analysis - contractual undiscounted cash flows: March 31, 2024 December 31, 2023
Less than one year $ 1,707,798 $ 1,696,270
One to five years 7,043,638 7,033,385
More than five years 3,701,391 4,142,538
Total undiscounted lease liabilities $ 12,452,827 $ 12,872,193
Lease liabilities:
Current $ 992,737 $ 961,692
Non-current $ 8,532,478 $ 8,792,144
Total lease liabilities $ 9,525,215 $ $9,753,836
(1)
As at March 31, 2024, a lease liability of $4,480,513 (December 31, 2023 - $4,480,513) relating to the exercise of a
renewal option which the Company is reasonably certain to exercise has been recognized in lease obligations representing
$8,258,679 (December 31, 2023 - $8,258,679) of undiscounted cash flows. The weighted average incremental borrowing
rate applied to lease liabilities recognized in the statement of financial position is 8%.
Amounts recognized in statement of loss and comprehensive loss:
For the three months ended: March 31, 2024 March 31, 2023
Interest on lease liabilities recorded in net financing income $ 109,746 $ 208,011
Note 15 - Loans and borrowings
March 31, 2024 December 31, 2023
Unsecured federal government term loan principal due on
December 31, 2025 with monthly interest payments beginning
in January 2023 and ending in December 2025 at a fixed rate
of 5%, if the amount is unpaid before December 31, 2023. The
portion of the loan may be forgiven with early repayment by
January 2024 (i) $ - $ 51,145
Secured Economic Development Agency of Canada term loan
without interest repayable in 84 equal and consecutive monthly
instalments with the first payment due and payable 36 months
following the project completion date, being no later than
March 21, 2024. The interest compounds monthly at a fixed
rate of 10% (i) (ii) 2,201,690 2,149,849
Convertible debentures repayable in March 2028 effective
interest rate of 15.76%, with quarterly interest payments, which
may, at the Company’s election, be paid in cash or by issuing
additional “paid in kind” debentures with the same terms. Each
Debenture is convertible, at the holder’s option, into common
shares at a conversion price of $3.25 per share. Company has
granted customary pre-emptive rights to Northern Private
Capital in connection with any future offerings or issuances of
equity or convertible equity or debt securities. (iii) 42,722,562 41,195,782
First tranche of secured federal term loan repayable in equal
instalments starting in November 2024, maturing on February
10, 2028 (“Term Loan”). The term loan bears interest on the
drawn funds at the annual rate of the prevailing Canadian
prime rate plus 5.00% and provides for multiple advances over
a nine-month drawdown period. (iv) 15,018,741 15,011,415Taiga Motors Corporation
Notes to the Condensed Consolidated Interim Financial Statements – March 31, 2024
(Expressed in Canadian Dollars - Unaudited)
Page 12 of 18
March 31, 2024 December 31, 2023
Second tranche of secured federal term loan repayable in one
installment on or before December 31, 2024. The term loan
bears interest on the drawn funds at the annual rate of the
prevailing Canadian prime rate plus 7.00% and provides for
multiple advances over a period of six months. As at March 31,
2024, an amount of $2,250,000 remained available for future
draws. (iv) 3,713,759 -
Other - 2,617
Total Loans and borrowings $ 63,656,751 $ 58,410,808
Less: Current portion of loans and borrowings $ 5,252,922 $ 587,165
Non-current portion of loans and borrowings $ 58,403,829 $ 57,823,643
(i) The benefits received by the Company from these loans, where interest rates are lower than market rates, were
accounted for under IAS 20, Accounting for Government Grants and Disclosure of Government Assistance and recorded
as Other income in the Statement of Loss and Comprehensive Loss or offset against the assets to which the benefits
relate to. Market interest rates of 8-10% were determined by looking at comparable loans with similar terms, adjusted
for credit risk rating of the Company. The Company settled the loan during the three months ended March 31, 2024 and
recognized gain of $11,145 on debt settlement classified as net financing cost in the condensed consolidated interim
statement of loss.
(ii) On December 28, 2022, the Company received a $4,000,000 loan from Economic Development Agency of Canada to
cover the acquisition and installation of research, development, and production equipment, including specialized
equipment for the battery, snowmobile, and watercraft assembly lines. The difference of the total value and present
value $1,952,901 has been treated as a government grant, which has been applied against the related costs for which
the loan was intended, primarily property, plant and equipment. The Agency provided notice to the Company that it
considered that the Company was not in compliance under its loan agreement, starting on February 23, 2024, when the
Company confirmed that it would not complete the construction of the Shawinigan facility in accordance with provisions
of the loan agreement. No funds were received by the Company for the Shawinigan phase of the loan agreement. The
Agency also acknowledged that there were no compliance issues under the agreement regarding the $4 million
disbursed in connection with the Montreal phase of the project before February 23, 2024. The Agency has confirmed
that it has waived its rights under the agreement specifically and only in relation to the non-construction of the Shawinigan
facility. The loan contains certain affirmative and negative covenants, including covenants relating to the Company’s
project and the location of the financed equipment, as well as certain financial covenants.
(iii) The convertible debentures contains certain affirmative and negative covenants, including covenants relating to the
Company’s operations and statutes, as well as certain financial covenants.
(iv) The Term Loan contains certain affirmative and negative covenants, including covenants relating to the Company’s
operations and statutes, as well as certain financial covenants. The Company must maintain a current ratio greater than
1.10 to 1.00 starting in the fourth quarter of 2024, 1.15 to 1.00 in 2025, and 1.25 to 1.00 thereafter as well as a quarterly
cashflow from operations equal to or greater than $4,000,000 commencing in the last fiscal quarter of 2024. There is a
risk that the Company fails to meet the one or more of these covenants in the last quarter of 2024. Attaining these
covenants is dependent on the Company’s ability to raise sufficient funds to scale production and reduce unit costs, and
to significantly increase sales volumes and generate profits thereon. If the Company does not meet one or more of these
covenants, it will be considered an event of default and the lender could demand immediate repayment of the loan at
that time. This could also trigger cross default clauses on other loans. See Note 2.
Capital repayments due on loans and borrowings, for the next five years and thereafter are as follows:
Year:
Less than 1 year $ 5,252,922
1 – 5 years 57,171,931
More than 5 years 1,231,898
Total $ 63,656,751
Convertible debentures
The following table summarizes the continuity of the Company’s convertible debentures for the periods ended:
March 31, 2024 December 31, 2023
Opening balance $ 41,195,782 $ -
Net proceeds from issuance of the Debentures - 36,794,020
Accretion of interests 1,526,780 4,401,762
Ending balance $ 42,722,562 $ 41,195,782Taiga Motors Corporation
Notes to the Condensed Consolidated Interim Financial Statements – March 31, 2024
(Expressed in Canadian Dollars - Unaudited)
Page 13 of 18
Note 16 - Share capital
Common shares
Authorized: unlimited number of voting common shares without par value
Number of shares Amount
Balance as at December 31, 2023 and March 31, 2024 31,825,712 $ 321,163,338
Note 17 - Share-based payments
Warrants
Continuity of warrants reserved classified as contributed surplus in the statement of financial position is as
follows:
Number of warrants Amount
Balance as at December 31, 2023 and March 31, 2024 1,794,354 $ 12,739,714
The outstanding warrants with exercise price of $17.25 expire on April 21, 2026. The weighted average
remaining contractual life of outstanding warrants as at March 31, 2024 is 2 years.
Incentive stock options
Historically, Taiga Motors Inc. made equity-based awards by issuing options under the Company’s employee
stock option plan effective as of October 16, 2015, as amended from time to time (the “Legacy Option Plan”).
In connection with the Merger, the Legacy Option Plan was amended to, among other things, comply with the
requirements of the TSX, render the outstanding options exercisable for common shares of Taiga Motors
Corporation and to prohibit further awards under the Legacy Option Plan.
On April 21, 2021, the Company established an omnibus incentive plan (the “Omnibus Incentive Plan”) for
awards to eligible directors, officers, employees and consultants. The Company has the right to make such
grants for a period of 3 years from the establishment of the Omnibus Incentive Plan and then needs to get the
approval of the Board and the Shareholders every 3 years. The Plan is intended to help the Company secure
and retain the services and provide incentives for increased efforts for the success of the Company. The Board
of Directors grants awards from time to time based on its assessment of the appropriateness of doing so in
light of the long-term strategic objectives of the Company, its current stage of development, the need to retain
or attract particular key personnel, the number of awards already outstanding and overall market conditions.
On August 18, 2021, the Company amended and restated the Omnibus Incentive Plan. No material changes
resulted from these amendments.
The number of common shares reserved for issuance under the Legacy Option Plan will not exceed 1,305,790.
Unless otherwise decided by the Board, the term of the option cannot exceed 10 years and will vest gradually
over a period of 4 years. The number of common shares reserved for issuance under the Omnibus Incentive
Plan will not exceed 10% of the total issued and outstanding shares on a non-diluted basis (3,182,571 as at
March 31, 2024). Repurchase, exercise or return of previously issued awards to the Omnibus Incentive Plan
increase the number of shares available for issue.Taiga Motors Corporation
Notes to the Condensed Consolidated Interim Financial Statements – March 31, 2024
(Expressed in Canadian Dollars - Unaudited)
Page 14 of 18
Movements in the number of stock options outstanding and their related weighted average exercise prices are
as follows:
Number of
options
Weighted
average
exercise price
Weighted
average
remaining life
(years)
Balance, December 31, 2023 2,558,373 $ 1.54 7.64
Forfeited (107,881) 1.93
Expired (15,905) 0.03
Balance, March 31, 2023 2,464,587 $ 3.64 7.76
The weighted average exercise price of options outstanding and exercisable at March 31, 2024 is $1.51
(December 31, 2023 - $1.54).
The following tables provide additional information about the Company’s stock options as at March 31, 2024:
Exercise price ($)
Number of
options
outstanding
Weighted
average
remaining life
0.47 184,165 0.49
1.02 61,998 1.64
1.15 19,184 2.19
1.34 15,000 9.46
1.60 1,822,984 8.96
1.93 361,256 6.71
Outstanding, end of period 2,464,587 7.76
Exercisable, end of period 1,161,219 6.21
Deferred stock units
Deferred stock units (“DSU”) are time-based awards and all the amount of DSUs granted will vest
immediately upon grant for the service period for which they are awarded.
For the three-months periods ended March 31, 2024 March 31, 2023
Share-based payments related to DSU $ 47,900 $ 81,489
The value of deferred stock units was re-measured since the grant date based on the market price of
Company’s common share at the reporting date, the gain of $69,466 (the three months ended March 31,
2023 – the gain of $103,231) was included in the consolidated statements of loss and compressive loss as
general and administration. The outstanding DSUs are recorded as share-based compensation liability until
exercise in the condensed consolidated interim statements of financial position.
Number of DSUs
Balance, December 31, 2023 267,177
Granted 76,032
Balance, March 31, 2024 343,209
Note 18 - Related party transactions and balances
Key management personnel compensation
Key management personnel include those persons having authority and responsibility for planning, directing
and controlling the activities of the Company as a whole. The Company defines key management personnel
as being the directors and key officers.
The compensation awarded to key management personnel is as follows:Taiga Motors Corporation
Notes to the Condensed Consolidated Interim Financial Statements – March 31, 2024
(Expressed in Canadian Dollars - Unaudited)
Page 15 of 18
For the three-months periods ended March 31, 2024 March 31, 2023
Salaries, wages and benefits $ 548,037 $ 665,526
Share-based payments 151,676 177,611
Total compensation $ 699,713 $ 843,137
Note 19 - Revenue
All of the Company’s revenue is derived from contracts with customers. Revenues are disaggregated by
product line and geography:
For the three-months periods ended March 31, 2024 March 31, 2023
Sale of powersport vehicles $ 5,074,533 $ 1,728,030
Sale of branded apparel 2,636 1,412
Total $ 5,077,169 $ 1,729,442
For the three-months periods ended March 31, 2024 March 31, 2023
Sales with payment terms $ 11,684 $ -
Prepaid sales 5,065,485 1,729,442
Total $ 5,077,169 $ 1,729,442
For the three-months periods ended March 31, 2024 March 31, 2023
Sales to distributors $ 1,836,153 $ -
Sales direct to consumers 3,241,016 1,729,442
Total $ 5,077,169 $ 1,729,442
Changes in deferred revenue balances during the period are as follows:
Deferred revenue
Balance at December 31, 2023 $ 1,481,409
Additions 3,981,188
Recognized as revenue during the period (5,065,485)
Balance at March 31,2024 $ 397,112
Note 20 - Financial instruments
Fair values
When measuring the fair value of an asset or a liability, the Company uses observable market data as far as
possible. Fair values are categorized into different levels in a fair value hierarchy based on the inputs in the
valuation techniques as follows:
For the three-months periods ended March 31, 2024 March 31, 2023
Brazil $ 1,424,777 $ -
Canada 693,017 874,088
United States of America 2,483,029 855,354
Other 476,346 -
Total $ 5,077,169 $ 1,729,442Taiga Motors Corporation
Notes to the Condensed Consolidated Interim Financial Statements – March 31, 2024
(Expressed in Canadian Dollars - Unaudited)
Page 16 of 18
 Level 1 – Quoted (unadjusted) market prices in active markets for identical assets or liabilities
 Level 2 – Valuation techniques for which the lowest level input that is significant to the fair value
measurement is directly or indirectly observable
 Level 3 – Valuation techniques for which the lowest level input that is significant to the fair value
measurement is unobservable
The carrying values of cash and cash equivalents, receivables, trade payables and accrued liabilities,
customer deposits, approximate their fair values due to the immediate or short-term nature of these
instruments. The fair values of loans and borrowings approximate their carrying values. There has been no
significant change in credit and market interest rates since the date of their issuance.
Fair value estimates are made at a specific point in time, based on relevant market information and information
about financial instruments. These estimates are subjective in nature and involve uncertainties and matters of
significant judgment and, therefore, cannot be determined with precision. Change in assumptions could
significantly affect the estimates.
The following table summarizes the classification of the Company’s financial instruments under IFRS 9:
Financial assets
Cash and cash equivalent Amortized cost
Receivables Amortized cost
Financial liabilities
Trade payables and accrued liabilities Amortized cost
Share-based compensation liability Amortized cost
Customer deposits Amortized cost
Loans and borrowings Amortized cost
Capital and Risk Management
The Company’s objective and polices for managing capital are to safeguard its ability to continue as a going
concern in order to provide returns for shareholders and benefits for other stakeholders and to maintain an
optimal capital structure to reduce the cost of capital. The Company defines the components of its capital
structure as being long-term debt and bank loans, net of cash, plus equity. The Company manages its capital
structure and makes changes based on economic conditions, risks that impact the operations and future
significant capital investment opportunities. In order to maintain or adjust its capital structure, the Company
may issue new equity instruments or raise additional debt financing.
The Company is exposed to a variety of financial risks by virtue of its activities: market risk, interest rate risk,
liquidity risk and foreign currency risk. The Board of Directors has overall responsibility for the determination
of the Company’s capital and risk management objectives and policies while retaining ultimate responsibility
for them. The Company’s overall capital and risk management program has not changed throughout the
period. It focuses on the unpredictability of financial markets and seeks to minimize potential adverse effects
on financial performance. Risk management is carried out by the finance department under policies approved
by the Board of Directors. The finance department identifies and evaluates financial risks in close cooperation
with management.
Interest rate risk
Interest rate risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because
of changes in market interest rates. Most of the Company’s interest-bearing debt instruments have fixed
interest rates and are not subject to interest rate cash flow risk. The Company has secured government term
loan bearing interest at a variable rate as disclosed in Note 15.Taiga Motors Corporation
Notes to the Condensed Consolidated Interim Financial Statements – March 31, 2024
(Expressed in Canadian Dollars - Unaudited)
Page 17 of 18
The interest-bearing financial instruments, as reported in the financial statements, have the following interest
rate profile:
March 31, 2024 December 31, 2023
Fixed rate instruments $ 44,924,252 $ 43,399,423
Variable rate instruments 18,732,499 15,011,385
Total $ 63,656,751 $ 58,410,808
A change of 100 basis points in interest rates would have increased or decreased equity by $187,000 as at
March 31, 2024 (December 31, 2023 - $150,000).
Liquidity risk
Liquidity risk is the risk that the Company will not be able to meet its financial obligations as they fall due. The
Company generally relies on external financing or key management to provide sufficient liquidity to meet
budgeted operating requirements. The following table sets forth details of the payment profile of financial
liabilities based on their undiscounted cash flows:
Total
carrying
amount
$
Contractual
cash flows
$
Less than 1
year
$
1 to 5 years
$
More than 5
years
$
Trade payables and accrued
liabilities 16,255,845 16,255,845 16,255,845 - -
Share-based compensation liability 216,222 216,222 216,222 - -
Customer deposits 1,137,826 1,137,826 1,137,826 - -
Loans and borrowings 63,656,751 104,313,818 7,544,076 93,960,211 2,809,524
Total 81,266,644 121,923,711 25,153,969 93,960,211 2,809,524
The contractual obligations for loans and borrowings are disclosed in Note 15.
Taking into consideration the Company’s current cash position, volatile equity markets, global uncertainty in
the capital markets and increasing cost pressures, the Company is continuing to review its needs to seek
financing opportunities in accordance to its capital risk management strategy.
As at March 31, 2024, the Company had issued letters of credit for an amount of U.S. $400,000 ($542,000,
$541,785 as at December 31, 2023).
Credit Risk
Credit risk is the risk of a loss if a customer or counterparty to a financial instrument fails to meet its contractual
obligations. The Company regularly monitors credit risk exposure and takes steps to mitigate the likelihood of
this exposure resulting in losses.
The Company’s exposure to credit risk currently relates primarily to cash, which it manages by dealing only
with highly rated Canadian financial institutions. The Company invests its excess cash with varying terms to
maturity selected with regard to the expected timing of investments or expenditures for continuing operations.
The Company started doing sales with payment terms to some fleet customers, but total exposure remained
fairly limited as the vast majority of the sales were prepaid. As at March 31, 2024, the Company believes it
was not exposed to any significant credit risk. The Company’s maximum credit exposure corresponded to the
carrying amount of these financial assets.Taiga Motors Corporation
Notes to the Condensed Consolidated Interim Financial Statements – March 31, 2024
(Expressed in Canadian Dollars - Unaudited)
Page 18 of 18
Foreign currency risk
Foreign currency risk is defined as the risk that the fair value of future cash flows of a financial instrument will
fluctuate because of changes in foreign exchange rates. The Company maintains financial instruments and
enters into transactions denominated in foreign currencies, principally in USD, which exposes the Company
to fluctuating balances and cash flows due to various in foreign exchange rates. The current exposure to
foreign currency risk remains very limited.
Note 21 - Provisions
Warranty provisions
The Company provides warranties for general repairs of defects that existed at the time of sale, as required
by law. Provisions related to these assurance-type warranties are recognized when the product is sold.
Note 22 - Supplemental cash flow information
For the three-months periods ended March 31, 2024 March 31, 2023
Non-cash additions to property and equipment $ 127,949 $ 197,607
Non-cash additions to intangible assets 42,519 54,463
Note 23 - Net financing cost
For the three-months periods ended March 31, 2024 March 31, 2023
Finance costs on lease liabilities $ 190,746 $ 208,011
Finance costs on loans and borrowings 2,081,994 144,203
Finance income (29,583) (72,889)
Other finance cost (income) (12,214) 342
Net financing cost (income) $ 2,230,943 $ 279,667© TAIGA MOTORS INC. 2024 - All rights reserved
Taiga™, Nomad™, Orca™ and related trademarks, names and logos are the property of Taiga Motors Inc.
and are registered and/or used in Canada, the U.S. and countries around the world. Use of same
is not permitted without the prior written consent of Taiga Motors Inc.
Identifikace uložené verze

SHA-256: 9ce92c38f2e3c80b48c8c46c0fcfc44ad7a8c3a97b503e160d33cd98f506d0d5