ZDROJOVÝ PODKLAD
Uložený text
https://bluenav.com/wp-content/uploads/2025/06/Manuel-installateur-Outboard-Inhull-15kW-EN.pdf ↗1
Version n°2.1-INST-1.3-EN
Version N° Date Changes
0.9 3/1/2023 Creation of the document
1.0 6/5/2023 Inhull installation steps added: §5.4.4 ; §5.4.8 ; §8.15
1.1 9/12/2023 Commissioning steps modified: §7.3
9/27/2024 Product activation updated
1.2 CCU external antennas removed
Source configuration updated
1.3 4/9/2025 All technical data updated
All technical illustrations updated
Parts 3. to 13.13. added
Parts 1. to 2. rewritten
2
Table of contents
1. MANUAL INTRODUCTION ......................................................................................................... 6
1.1 About ................................................................................................................................................. 6
1.2 Intellectual Property..................................................................................................................... 6
2. SECURITY ...................................................................................................................................... 7
2.1 General safety instructions....................................................................................................... 7
2.2 Levels of safety instructions .................................................................................................... 7
3. DELIVERED MATERIAL ............................................................................................................. 9
3.1 Contents of delivery ..................................................................................................................... 9
3.2 Storage conditions .................................................................................................................... 10
4. NON-DELIVERED MATERIAL REQUIRED ........................................................................... 11
4.1 DC/DC Converter with Remote entry ................................................................................ 11
4.2 CCU Power supply .................................................................................................................... 11
4.3 Multifunctional Display (MFD) .............................................................................................. 11
4.4 NMEA 2000® Network ........................................................................................................... 11
4.5 Batteries ........................................................................................................................................ 12
4.6 Unsupplied screws for mechanical installation. ........................................................... 12
4.7 Unsupplied cables and connectors for wiring ............................................................... 12
4.8 Required tools for mechanical installation ...................................................................... 13
5. TECHNICAL DATA..................................................................................................................... 14
6. PRODUCT DIMENSIONS ..........................................................................................................15
7. PRODUCT DESCRIPTION ......................................................................................................... 17
7.1 Outboard Propulsion Unit ....................................................................................................... 18
7.2 Inhull Propulsion Unit ............................................................................................................... 18
7.3 Power Unit .................................................................................................................................... 19
7.4 CCU (Communication and Control Unit) ......................................................................... 19
7.5 Command Panel ........................................................................................................................ 19
8. MECHANICAL INSTALLATION REQUIREMENTS ............................................................. 20
8.1 General requirements .............................................................................................................. 20
8.2 Position of the Propulsion Unit ............................................................................................ 20
9. INSTALLATION OF THE OUTBOARD PROPULSION UNIT ............................................... 21
3
9.1 Verticality rework ....................................................................................................................... 21
9.2 Galvanic protection ................................................................................................................... 21
9.3 Drilling of the external covers of the Propulsion Unit (cable entry)........................ 22
9.4 Mounting procedure of the Outboard Propulsion Unit ............................................... 23
10. INSTALLATION OF THE INHULL PROPULSION UNIT ................................................ 25
10.1 Well creation ................................................................................................................................ 25
10.2 Mounting procedure of the Inhull Propulsion Unit ....................................................... 25
11. INSTALLATION OF THE POWER UNIT............................................................................ 27
11.1 Space taken by the Power Unit ............................................................................................ 27
11.2 Mounting procedure of the Power Unit ............................................................................ 28
12. INSTALLATION OF THE COMMAND PANEL AND THE CCU ..................................... 29
12.1 Position of the CCU .................................................................................................................. 29
12.2 Position of the Command Panel ......................................................................................... 29
12.3 Space taken by the Command Panel and the CCU ..................................................... 29
12.4 Mounting procedure of the Command Panel and of the CCU ................................ 30
13. WIRING .................................................................................................................................... 31
13.1 Identification of the connectors of the Power Unit ...................................................... 32
13.2 CCU connectors identification ............................................................................................. 33
13.3 Global wiring of the single-motor BlueSpin system..................................................... 34
13.4 Global wiring of the twin-motor BlueSpin system ........................................................ 35
13.5 Wiring of the Power Unit / Propulsion Unit ..................................................................... 36
13.5.1 Temperature sensors wiring (TEMP1 and TEMP2) ........................................... 36
13.5.2 Motor phase wiring (bulkhead connectors) .......................................................... 36
13.6 Power Unit / converter wiring ............................................................................................... 37
13.7 Power Unit / batteries wiring ................................................................................................ 37
13.7.1 Battery wiring (bulkhead connectors) ...................................................................... 37
13.8 Wiring of the Power Unit / CCU (CAN PROPULSION network) ............................... 38
13.8.1 CAN network definition .................................................................................................. 38
13.8.2 CAN PROPULSION network specific to the BlueSpin system ....................... 38
13.9 CCU / on-board NMEA 2000® network wiring ............................................................. 39
13.10 CCU / MFD wiring................................................................................................................. 40
4
13.11 CCU / Converter wiring....................................................................................................... 40
13.12 CCU / Power supply wiring ............................................................................................... 41
13.13 CCU / Command Panel wiring ........................................................................................ 41
14. APPENDIXES ........................................................................................................................43
14.1 Well blueprint (Inhull Propulsion Unit) ............................................................................... 43
14.2 Drilling blueprint (Command Panel) ................................................................................... 44
5
1. MANUAL INTRODUCTION
1.1 About
This manual contains installation instructions for the following motorization systems:
• BlueSpin 15 kW Outboard
• BlueSpin 15 kW Inhull
For practical reasons, it is not possible to include detailed information covering all possible
alternatives for installation, operation or maintenance. The drawings and images in this manual are
shown for explanatory purposes only.
In the event of differences of interpretation between the multilingual versions of the manual, the
French version shall prevail. BlueNav is the sole right owner of the final interpretation of this
manual.
The contents of this manual relate strictly to the installation of the BlueSpin system. The
integration of the energy system (batteries, Battery Management System, chargers) is
independent and described in the manuals supplied by their manufacturers.
In the event of any discrepancy between the products supplied and this manual, or in case of
doubt, please visit www.bluenav.com or contact us at support@bluenav.com.
1.2 Intellectual Property
BlueNav retains the intellectual property and industrial property rights, including copyrights,
patents, logos, diagrams, and drawings, of its products, publications and software.
This installation manual is for reserved use only. No part of this manual may be reproduced or
transmitted in any form or by any means without our prior written permission.
None of these pages may be reproduced, in whole or in part, without written authorization from
BlueNav.
6
2. SECURITY
2.1 General safety instructions
This manual explains how to install the BlueSpin system in a simple and safe way. However, some
specialized knowledge is required for working on or modifying the boat’s hull. Call an expert if
necessary.
Read the entire manual carefully before installing and operating the system. Failure to follow the
instructions may result in serious property damage or personal injury. The BlueSpin system must
be installed in accordance with the installation recommendations described in the documents
supplied.
BlueNav accepts no responsibility for any damage caused by actions other than those described
in this manual. Modifications to the hull of the boat should only be carried out by professional
builders and architects. Compliance with local standards and regulations is mandatory.
Please observe the following general safety instructions:
The boat on which the BlueSpin system is installed must be stable.
The boat must be compatible with the installation and the use of the BlueSpin system, as
verified beforehand during project commissioning.
To prevent corrosion and ensure lasting waterproofness, consider the hull material and provide
the appropriate sealants and fastening materials.
Bores and holes in the hull can affect its structure and stability. Provide suitable fastening
materials.
Use the appropriate lifting equipment to move heavy elements.
2.2 Levels of safety instructions
Safety instructions are scaled at 3 levels. They are categorized according to risk severity if the
instructions are not followed.
DANGER!
Immediate danger of death or of serious injury.
WARNING!
Danger of personal injury or of material damage.
BlueNav accepts no liability for any damage caused by actions not complying with these
instructions.
7
Apart from the safety instructions, additional information is indicated by the following:
NOTE
Useful additional information: assembly advice, description of a component, specific
recommendation, etc.
8
3. DELIVERED MATERIAL
3.1 Contents of delivery
Quantity
Element Outboard Outboard Inhull single- Inhull
single-motor twin- motor twin-motor
motor
Main Elements
Propulsion Unit with cable harness:
- DRV cable
- SIG cable
- Yellow motor phase cable
1 2 1 2
- Orange motor phase cable
- Red motor phase cable
- TEMP1 cable
- TEMP2 (spare) cable
CCU (Communication and Control
1 1 1 1
Unit)
Command Panel 1 1 1 1
Power Unit*
*Identified “portside” and “starboard” in 1 2 1 2
case of twin-motor setup.
Wiring
“CCU Power Supply” cable 1 1 1 1
“Remote 1” cable 1 1 1 1
“Remote 2” cable 0 1 0 1
“PU Power Supply” cable 1 2 1 2
Green “THR_R” extension cable 0 1 0 1
White “THR_L” extension cable 1 1 1 1
Blue “VCU” cable harness
- “KILL SWITCH – M” cable x2 1* 1*
- “ON/OFF” cable
- “ELEC M” cable *Without the 1 *Without the 1
- “DOCKING” cable “DOCKING” “DOCKING”
cable cable
- “BUZZER” cable
- “JOYSTICK” cable
Protective covers for the bulkhead
5 10 5 10
connectors of the Power Unit
9
WEIPU SP21 connector for the TEMP1
2 2 2 2
& TEMP2 cables
Screws
M10 nylon shoulder washers 4 8 0 0
M4x8 countersunk head screws to
3 6 3 6
fasten the Z bar on the Power Unit
M4x12 countersunk head screws to
fasten the aluminum bar on the Power 3 6 3 6
Unit
STS M6x4 A4 – 70 Torx screws for
16 32 0 0
external covers
Accessories
Aluminum bar 1 2 1 2
Z bar 2 4 2 4
Centering template 0 0 1 1
Rear installation template 1 1 0 0
Side installation template 1 1 0 0
Watertight seal 0 0 1 2
NOTE
Some cables, connectors and screws necessary for the installation are not supplied. To learn
more, see p.12.
3.2 Storage conditions
If the BlueSpin system is not immediately installed, it must be stored in its transport packaging in a
dry, clean and dust-free environment.
Please observe the following criteria:
- Ambient temperature between 5°C and 40°C;
- Relative humidity below 60%;
- No sudden changes in temperature, vibration, gas or corrosive agents;
- Maximum stackable weight on packaging does not exceed 220kg.
WARNING!
Always handle and move the BlueSpin vertically in its original packaging.
10
4. NON-DELIVERED MATERIAL REQUIRED
The BlueSpin system is designed to be installed into a boat already equipped with a thermal
propulsion system. Due to the many different characteristics of each boat, some of the
components required for the installation of the BlueSpin system are not supplied by BlueNav on
delivery but must be present on board.
If you have any doubts about the compatibility of the material listed below, please contact
BlueNav after-sales service.
4.1 DC/DC Converter with Remote entry
The converter is used to transform 48V voltage (from the batteries) into 12V to power the CCU.
Each Power Unit in the BlueSpin system is wired to a converter. The CCU is also wired to each
converter. See p.34-p.35.
The converter must meet the following requirements:
Specifications Value
Rated input voltage 48V
Isolated rated output voltage 12V
Output direct current 30A
Remote on/off connector Present
Count one converter per Power Unit of the BlueSpin system.
4.2 CCU Power supply
A power supply of 12V DC - 1A is required on board to power the CCU. This power supply can be
the service battery on board. See p.41 for the wiring procedure.
4.3 Multifunctional Display (MFD)
A Multifunctional Display (MFD) is required on board to display the BlueNav application. The
BlueNav application is part of the HMI (Human-Machine Interface) that allows the user to steer
the BlueSpin system. See p.40 for the wiring procedure.
4.4 NMEA 2000® Network
The boat's NMEA 2000® CAN bus network is used to transmit data between devices of different
types and from different manufacturers, such as GPS, compass, wind, depth, AIS, speed or motor
data. It is pre-existent to the BlueSpin system installation.
The CCU of the BlueSpin system must be wired to the backbone of the NMEA 2000® Network on
board to guarantee good data communication. See p.39 for the wiring procedure.
11
4.5 Batteries
The BlueSpin system is an electrical propulsion system. Thus, it is powered by batteries. The
batteries must meet the following requirements:
Specifications Value
Rated voltage 48V
Current type Direct current
Rated current 300A
Discharge capacity High
Batteries are wired to the Propulsion Units of the BlueSpin system. Count 300A per motor of the
BlueSpin system. See p.37 for the wiring procedure.
NOTE
BlueNav can provide advice for choosing batteries. Contact the after-sales service.
4.6 Unsupplied screws for mechanical installation.
Equipment Quantity Corresponding Procedure Outboard Inhull
M10 type screw
4 p.23 (step 5) X
(INOX 14/A4 316L)
M8 type screw 14 p.25 (step 6) X
M4 type screw 3 p.28 (step 1) X X
M6 type screw 2 p.28 (step 6) X X
M5 type screw 2 to 6* p.30 (step 1) X X
M5 type screw 6 p.30 (step 5) X X
*Depends on the drilling environment.
WARNING!
All screws not supplied must be compatible with the mounting environment. In case of doubt,
contact BlueNav after-sales service.
4.7 Unsupplied cables and connectors for wiring
The table below summarizes the items needed in addition to the hardware supplied, depending on
the setup of the BlueSpin system ordered. See the wiring procedures for further details.
Quantity
Element Corresponding Procedure
Single-motor Twin-motor
Ethernet cable 1 1 See p.40
12
NMEA 2000® Micro-C cable 3 5
CAN Bus T-connector 2 3
See p.38
120 Ω CAN Bus female termination 1 1
120 Ω CAN Bus male termination 1 1
Cable CAN Bus M12 F/M 1 3 See p.39
+48V power cable 1 2
See p.37
-0V power cable 1 2
4.8 Required tools for mechanical installation
This list is indicative and non-exhaustive. Additional tools may be required depending on the
components not supplied (see p.11) and the specific characteristics of the boat on which the
BlueSpin system is installed.
Tool Used for Outboard Inhull
Lifting table Move the Propulsion Unit X X
Support the Propulsion Unit during material
Wedges X X
handling on the lifting table
8mm Allen wrench Manually lower the turbine X X
Torque wrench Screw with the correct torque X X
Sealing product* Seal the holes in the hull X X
70mm hole saw Drill the cable entry in the hull X
17mm clamping bush Tighten the Propulsion Unit screws X
17mm torque wrench Tighten the Propulsion Unit screws X
Tighten the screws of the Propulsion Unit
13mm clamping bush X
covers
Tighten the screws of the Power Unit and of
Phillips screwdriver X X
the Command Panel (11.2 and 12.4)
Flat head screwdriver Unscrew the Junction Box caps. X X
*Depends on the drilling environment.
13
5. TECHNICAL DATA
Propulsion Unit rated power
The maximum power and the maximum motor rotation
speed depend on the boat-motor-propeller combination. 15kW
Depending on the use, maximum motor speed may not
be reached.
Propulsion Unit thermic outboard equivalent
25hp
(estimation)
Rated voltage 48V DC
Rated current 300A
Maximum current 350A
Maximum motor rotation speed 1500rpm
Type of motor temperature sensor / Number PT1000 / 2
Length of the cable harness coming from the
Propulsion Unit (SIG, DRV, TEMP1, TEMP2, yellow
2.5m
motor phase, orange motor phase, red motor
phase)
Length of “CCU Power Supply” and “PU Power
3m
Supply” cables
Length of “Remote 1” and “Remote 2” cables 6m
Length of white “THR_L” and green “THR_R”
2m
extension cables
Outboard 78kg
Weight of the Propulsion Unit
Inhull 74,4kg
Weight of the CCU 1.1kg
Weight of the Command single-motor 1.1kg
Panel twin-motor 1.8kg
Weight of the Power Unit 15,6kg
Turbine Protection Index IP68 - seawater resistant
Push buttons
Command System Direction joystick
Left / Right throttles
14
6. PRODUCT DIMENSIONS
Dimensions of the Outboard Propulsion Unit
A 921mm
B 465mm
C 448mm
D 565mm
E 290mm
F 44.5mm
Dimensions of the Inhull Propulsion Unit
Classic version Extra-long version
A 995mm
A 1,308mm
B 494mm B 494mm
C 408mm C 408mm
D 638mm D 638mm
E 290mm E 290mm
F 44.5mm F 390mm
G 564mm G 963mm
15
Dimensions of the Power Unit
A 200mm
B 360mm
A C 404mm
B C
Dimensions of the CCU
A 80mm
A
B 161mm
B C 280mm
C
Dimensions of the Command Panel (twin-motor)
A 135mm
A
B 150mm
C 230mm
B C
16
7. PRODUCT DESCRIPTION
The BlueSpin system is an electrical propulsion system designed to be used as a secondary motor
to hybridize a boat's pre-existing thermic propulsion.
It is available in two models:
• The Outboard BlueSpin 15 kW: outboard motor.
o single-motor version
o twin-motor version
• The Inhull BlueSpin 15 kW: installed within the hull, in a well.
o single-motor version
o twin-motor version
The features of the Inhull BlueSpin system are identical to the Outboard BlueSpin system. Only
the external aspect and the installation instructions of the Propulsion Unit change.
The two models are equipped with a retractable RIM Drive propeller. When in use, the RIM Drive
propeller is lowered through the underside of the Propulsion Unit. After use, the RIM Drive
propeller retracts within the Propulsion Unit.
NOTE
The diagrams in this installation manual can depict the RIM Drive propeller as lowered (in “using
mode”) for illustration or explanation purposes only. When the system is delivered, the RIM Drive
propeller of the Propulsion Unit is retracted by default.
The BlueSpin system, whether it’s an Outboard or an Inhull model, consists of the following
components:
Quantity
Elements
single-motor twin-motor
Propulsion Unit 1 2
Power Unit 1 2
CCU (Communication and Control
1 1
Unit)
Command Panel 1 1
17
7.1 Outboard Propulsion Unit
1 4 The Outboard Propulsion Unit of the
5 BlueSpin system is designed for an outboard
installation, against the hull (see p.21).
6
The Outboard Propulsion Unit can be
7 screwed on its front side or on one of its
8 lateral sides.
2 3
9 The Outboard Propulsion Unit is equipped
with covers. Those covers must be drilled
1 Upper side cover 4 Junction box
before the installation (see p.22) to create a
cable entry.
2 Rear side cover 5 Cable entry
3 Lateral side cover 6 Gyration box The Outboard Propulsion Unit is compatible
7 Chassis with a 0-14° hull angle.
8 RIM Drive propeller
9 Trapezoidal screw
7.2 Inhull Propulsion Unit
1 The Inhull Propulsion Unit of the BlueSpin system is
2 designed to be installed within a well. This well is
3 installed beforehand in the hull (see p.25).
4 The Inhull Propulsion Unit is equipped with a sealing
plate on its upper side. The sealing plate has a cable
5 entry. The sealing plate is equipped with lifting eyes to
move the Propulsion Unit.
6
The Inhull Propulsion Unit is available in a classic
7
version and in an extra-long version.
The extra-long version has a longer shaft. See p.15.
1 Lifting eye
2 Watertight cable entry
3 Sealing plate NOTE
4 Gyration box Contact our technical teams for a suitable installation
5 Chassis if necessary.
6 RIM Drive propeller
7 Trapezoidal screw
18
7.3 Power Unit
1
2 1 Box
3 2 Command connectors
3 48V DC bulkhead connectors
4 Motor phase bulkhead connectors
4 5 Number plate
The detailed description of the connectors is given at p.32.
5
The Power Unit enables the control of the motors within the Propulsion Unit.
7.4 CCU (Communication and Control Unit)
1 1 Box
2 2 M12 male connectors
3 3 Number plate
4
5 4 RJ45 female connectors
5 M12 female connectors
6
6 WEIPU male connectors
The Communication and Control Unit (CCU) is a control system and a communicative gateway. It
transmits data through the NMEA 2000® network (see p.11).
7.5 Command Panel
1 1 Panel of the Command Panel
2 2 Push buttons
3 Throttles
3
4 4 Cut-off switch
5 Direction joystick
5
The Command Panel is used to switch on and activate controls.
The Command Panel is supplied with two cables prewelded on the rear connectors THR_L
(identified in white) and THR_R (identified in green). Cable extensions are connected to the
prewelded cables to facilitate the wiring with the CCU (see p.41).
In case of a single-motor BlueSpin system, the Command Panel is equipped with a simple throttle.
19
8. MECHANICAL INSTALLATION
REQUIREMENTS
8.1 General requirements
The precise dimensions of the different elements supplied by BlueNav are available p.15. Make
sure that these dimensions are compatible with the installation environment.
For the material that is required but not supplied, see p.11.
Observe the safety instructions to ensure a safe and correct installation of the BlueSpin system.
See p.7.
DANGER!
The boat and all its components must be isolated from electrical sources.
The mechanical installation work must be carried out on land only. The boat must be out of
water.
WARNING!
The BlueSpin system requires an on-board power supply. Plan the position of the elements of
the BlueSpin system so as not to affect sensitive electrical equipment (e.g. radios) or measuring
instruments (e.g. compasses). Relocate those devices if necessary.
8.2 Position of the Propulsion Unit
The Propulsion Unit of the BlueSpin system is positioned against or within the hull, according to
the following requirements:
- The chassis of the Propulsion Unit does
Min 150mm not protrude from the hull of the boat;
- The chassis of the Propulsion Unit is
immersed underwater at a maximum of
Waterline 250mm from its lowest point;
Max 250mm - In lowered position, the RIM Drive propeller
is completely under the hull and
underwater;
- In retracted position, the RIM Drive
propeller does not protrude from the hull.
Regarding the Outboard Propulsion Unit, the installation template (Rear or Side) must be placed
against the hull to identify the drilling position.
Regarding the Inhull Propulsion Unit, the installation well (see p.25) must comply with these
requirements.
20
9. INSTALLATION OF THE OUTBOARD
PROPULSION UNIT
The Outboard Propulsion Unit is installed outboard, against the hull of the boat.
WARNING!
Never let the Propulsion Unit rest on the RIM Drive propeller. Use shims to ensure that the
Propulsion Unit rests on its chassis. The RIM Drive propeller must not be subjected to any
weight.
9.1 Verticality rework
The Outboard Propulsion Unit must be mounted on a flat
and vertical surface of the hull. The mounting surface
should be as vertical as possible.
If the mounting surface is not perpendicular to the
waterline, create a wedge so that the chassis can be
α vertical.
The material of the wedge depends on the mounting
environment. If the wedge is made of stainless steel, use
M12 nylon shoulder washers between the Propulsion Unit
α : vertical recovery angle and the wedge to prevent metal-on-metal contact.
9.2 Galvanic protection
Galvanic corrosion is a common phenomenon in
metallic structures that causes significant
damage. This electrochemical reaction occurs
when two dissimilar metals come into contact in
Nylon shoulder a conductive environment such as a liquid, a soil
washer or within atmospheric humidity.
The chassis of the Propulsion Unit is made of
Chassis
anodized aluminum. To avoid corrosion, BlueNav
Mounting surface (hull or supplies nylon shoulder washers for mounting
vertical interface)
the motors as shown.
The screws used to secure the chassis are of the following types: M10 INOX 14/A4 316L (see p.12).
21
WARNING!
If the hull is in a metal other than aluminum, plan a galvanic protection between:
- The hull and the chassis;
- The hull and the screws.
9.3 Drilling of the external covers of the Propulsion Unit (cable entry)
The length of the cable harness from the Propulsion Unit is
2.5m. This cable harness is used to wire the Propulsion Unit
to its corresponding Power Unit (see p.36).
The Power Unit is installed within the hull of the boat. To
wire the BlueSpin system in an Outboard setup, it is
necessary to drill the hull of the boat and one of the
external covers of the Propulsion Unit.
Each boat has its own specific configuration. The drilling of the cable entry must be considered on
a case-by-case basis.
Depending on the mounting environment and on the boat
configuration, two possibilities for cover drilling are
available:
• Upper side cover drilling;
• Lateral side cover drilling.
The drilling is carried out using a ∅70mm diameter hole
saw on the side of the cutout of the chassis for the cable
outlet. See p.23.
WARNING!
The drilling must meet the following requirements:
• The cable harness must be able to pass through the hull without being twisted;
• It must be possible to seal the cable entry during the installation process.
22
9.4 Mounting procedure of the Outboard Propulsion Unit
1. Identify the mounting side (Rear or Side) 3. Put the Propulsion Unit in front of the
of the Propulsion Unit depending on the mounting interface. Respect the
configuration of the boat. The surface on direction of the RIM Drive propeller. The
which the mounting side of the arrow on the baseplate must point
Propulsion Unit is mounted must be flat backwards.
with a tolerance of 2mm/m (see p.21)
WARNING!
Never let the Propulsion Unit rest on the
RIM Drive propeller. Use shims to ensure
that the Propulsion Unit rests on its
• If the chosen side of the Propulsion chassis. The RIM Drive propeller must not
Unit is the lateral side, use the “Side” be subjected to any weight.
installation template for the next
step. 4. Mark the desired cable entry point in the
• If the chosen side of the Propulsion hull (see p.22). Using a Ø70mm hole saw,
Unit is the front side, use the “Rear” drill the hull according to this parameter.
installation template for the next
step.
2. Using the installation template and a drill,
drill 4 holes for M10 screws on the
mounting interface (hull or wedge).
Ø70 mm
The cable harness can be guided through
the hole drilled at this stage or afterwards. All
cables must be straight and not twisted.
When making the cable harness go through,
put the TEMP1 and TEMP2 cables first, then
the yellow, orange and red phase motor
cables.
23
6. Using M6x40 truss head screws and a
WARNING! tightening torque of 2N⋅m, screw the
Always seal the cable entry after wiring the covers onto the Propulsion Unit.
Propulsion Unit/Power Unit (see p.36).
5. Using a minimum torque of 33N⋅m and 2 N·m
using M10 screws, screw in the following
order.
1 3 33 N·m
4 2
WARNING!
The covers are in HDPE. Do not over-
tighten. This can damage the screw
threading.
WARNING!
Use only A4 / 316 L stainless steel screws
(M10). Adapt the screwing to the mounting
surface.
To enable the screwing of the external
covers on the chassis, the diameter ∅ of
the screws for the mounting side of the
Propulsion Unit must not exceed 22mm.
24
10. INSTALLATION OF THE INHULL
PROPULSION UNIT
The Inhull Propulsion Unit is designed to be installed within a well, within the hull of a boat.
The position and dimensions of the well must allow the Inhull Propulsion Unit to comply with the
position requirements (see p.20).
10.1 Well creation
WARNING!
The creation of the well generates structural modifications of the boat. It must be carried out by
professionals only.
The well of the Inhull Propulsion Unit is created beforehand and complies with the structural
requirements of the boat. These requirements are discussed beforehand during the project
commissioning phase. See the information provided by BlueNav teams at this stage.
The blueprint for the creation of the well is available in the appendix p.43.
The well of the Inhull Propulsion Unit must:
- Comply with the positioning requirements of the Propulsion Unit described in p.20 ;
- Be made in a watertight material;
- Allow the RIM Drive propellers to turn and lower fully when the system is in use.
10.2 Mounting procedure of the Inhull Propulsion Unit
1. Using the centering mark, center the 2. Using the template, mark the 2 drilling
drilling template on the shims of the well. locations. Drill a ∅22.5mm hole on each
shim.
∅ 22,5 mm
=
=
25
3. In compliance with the holes drilled on facilitate the installation, two pin mounting
the shims of the well in the previous step, positions are available on both sides of the
screw the centering pins on using a chassis.
20mm open-end wrench (15N⋅m torque)
4. Position the flat gasket under the
on the underside of the chassis. The
sealing plate of the Propulsion Unit.
centering pins are available in a kit and
Line up the holes of the seal with the
are screwed on using M8x25 BTR (Allen)
holes of the sealing plate.
screws.
15 N·m
5. Using the lifting eyes, guide the
Propulsion Unit down into the well. The
WARNING! centering pins fit in the drilled holes.
Use the lifting eyes on the sealing plate
to handle the Propulsion Unit.
Never let the Propulsion Unit rest on the
RIM Drive propeller. Use shims to ensure
that the Propulsion Unit rests on its
chassis. The RIM Drive propeller must not
be subjected to any weight.
When screwing, apply a medium-strength
thread-locker (Loctite 243 or equivalent). To
6. Screw the sealing plate to the watertight rim of the well with
14 M8 screws. The tightening torque depends on the M8
screws selected and the mounting environment.
WARNING!
Check that the flat gasket is correctly positioned between the
sealing plate of the Propulsion Unit and the watertight rim of the
well:
- The holes of the gasket must be aligned;
- The gasket must be pressed against the watertight rim of
the well.
Incorrect installation is detrimental to motor mounting and
sealing.
26
11. INSTALLATION OF THE POWER UNIT
The Power Unit is designed to be installed within the hull of the boat.
The Power Unit should be installed:
- As close as possible to the corresponding Propulsion Unit to allow wiring (see p.36). The
motor power and control cables have a standard length of 2.5m. Check that the chosen
location is compatible with this length.
- Dry and sufficiently ventilated to avoid humidity.
- Protected from water splashes.
- Accessible for future maintenance.
The Power Unit can be installed horizontally or vertically, provided the above requirements are
met. However, vertical installation is recommended. The mounting procedure remains identical.
See p.28.
11.1 Space taken by the Power Unit
During the installation of the Power Unit, comply with the following dimensions:
3 4 5 6
2
1 404mm
2 20mm minimum 5 100mm minimum
1 3 100mm minimum 6 420mm
4 194mm
WARNING!
If the BlueSpin system is a twin-motor system, each Power Unit is identified “port side” and
“starboard”. Each Power Unit must be installed on board according to their position
identification. Each Power Unit is wired to its corresponding Propulsion Unit.
27
11.2 Mounting procedure of the Power Unit
1. Using the level, screw the Z bar 4. Clip the Z bar of the Power Unit onto the
horizontally onto the hull. Use screws Z bar of the mounting surface.
adapted for the mounting surface.
Count 120mm of free space above the Z
bar.
≥ 120 mm
5. Identify the drilling points of the
aluminum bar on the mounting surface.
Drill ∅6mm screwing holes in diameter.
2. Using the 3 M4x8 screws and a 2 N·m
torque, screw the Z bar onto the rear
side of the Power Unit in the drilled
holes.
2 N·m 6. Screw the aluminum bar onto the
mounting surface. Use ∅6mm diameter
screws adapted for the mounting
surface.
3. Using the 3 M4x12 screws and a 2 N·m
torque, screw the aluminum bar onto
the rear side of the Power Unit in the
drilled holes.
2 N·m
28
12. INSTALLATION OF THE COMMAND
PANEL AND THE CCU
12.1 Position of the CCU
The CCU is designed to be wired to a power supply of 12V DC on board. It acts as a gateway
between the BlueSpin system, the NMEA 2000® Network on board and the converter. Its position
is determined depending on the length of the supplied cables and the unsupplied cables. See
p.34 and p.35.
To reduce the risks of electromagnetic interference, install the CCU as far away as possible from
motors, generators, PODs or power cables.
Do not place the CCU in contact with a metal plate or compartment.
12.2 Position of the Command Panel
The Command Panel must be installed on the
steering station, close to the multifunctional
display, as shown.
The installation of the Command Panel
depends on the length of the cables supplied.
Install the Command Panel as close as
possible to the CCU.
12.3 Space taken by the Command Panel and the CCU
Respect the dimensions below for the installation of the Command Panel and of the CCU.
C D
H
B
E
A G
F
A 161mm
B 150mm minimum E 50mm minimum G 150mm
C 150mm minimum F 80mm H 80mm minimum
D 280mm
29
12.4 Mounting procedure of the Command Panel and of the CCU
1. Screw the CCU close to the
multifunctional display and to the WARNING!
Command Panel. Use M5 screws Ensure the wiring is correct before step 4.
adapted for the mounting surface. See
p.12. 4. Once the wiring is done, seal around the
panel and screw holes. The product to
be used depends on the mounting
environment.
2. On the steering station, drill a suitable
cable entry space for the wiring of the
Command Panel using the drilling
blueprint available in the appendix p.44.
5. Screw the panel of the Command Panel.
Use M5 screws adapted for the
mounting surface. See p.12.
3. Wire the Command Panel and the CCU.
See p.41.
30
13. WIRING
The BlueSpin system is designed to operate with a nominal voltage of 48V DC. The system is
supplied ready for wiring:
• On pre-existing components on board: see p.11.
• Between each component of the BlueSpin system.
The cables supplied are identified by a label or a color. See p.9 for a description of the cables
supplied.
BlueNav does not supply all the cables, connectors and terminators required for wiring the entire
BlueSpin system. This applies to items already owned by the customer or items that require a
specific cable length because of the configuration of the boat. See p.12.
See the overall wiring diagram for a wiring overview (p.34 and p.35).
DANGER!
Always work with the power switched off and with suitable electrical protection equipment.
Use a correct size of cables, suitable for marine environments.
31
13.1 Identification of the connectors of the Power Unit
To facilitate the wiring procedures of the Power Unit, see the identification table below.
Name/color
1 2 of the Name or type Detailed
N° Wired to...
6 connector if of cable procedure
3 4 7
5 identified
1 ∅ DRV (supplied) Propulsion Unit p.36
2 ∅ SIG (supplied) Propulsion Unit p.36
8
3 CAN Bus cable p.38
9 ∅ CCU
(not supplied)
10
4 PU Power p.37
48/12V – 30A
∅ Supply
Converter
(supplied)
5 TEMP1 p.36
∅ Propulsion Unit
(supplied)
6 +48V +48V power p.37
bulkhead cable (not Batteries
connector supplied)
7 -0V power p.37
-0V bulkhead
cable (not Batteries
connector
supplied)
8 Yellow Yellow phase p.36
bulkhead motor cable Propulsion Unit
connector (supplied)
9 Orange Orange phase p.36
bulkhead motor cable Propulsion Unit
connector (supplied)
Red phase p.36
Red bulkhead
10 motor cable Propulsion Unit
connector
(supplied)
The details regarding the cables not supplied are available at p.12.
32
13.2 CCU connectors identification
To facilitate the CCU wiring procedures, see the identification table below.
Name/color Name or
1 2 Detailed
N° of the type of cable Wired to...
procedure
3 connector
5 6
7 8 1 NMEA NMEA Backbone of the p.39
4 9 2000® 2000® cable NMEA 2000®
(not supplied) network on board
CAN cable Power Unit p.38
2 CAN PROP
(not supplied)
3 Ethernet Ethernet Multifunctional p.40
cable (not Display (MFD)
supplied)
4 POWER CCU Power 12V – 1A power p.41
SUPPLY Supply supply on board
(supplied)
5 REMOTE 1 Remote 1 Portside DC/DC p.40
(supplied) 48/12V converter
6 REMOTE 2* Remote 2 Starboard p.40
(supplied) DC/DC 48/12V
converter
7 Green Green Command Panel p.41
connector* “THR_R” cable
extension
(supplied)
8 White White “THR_L” Command Panel p.41
connector cable
extension
(supplied)
9 Blue Blue “VCU” Command Panel p.41
connector cable
harness
(supplied)
*Not used in single-motor setup.
The details regarding the cables not supplied are available at p.12.
33
13.3 Global wiring of the single-motor BlueSpin system
34
13.4 Global wiring of the twin-motor BlueSpin system
35
13.5 Wiring of the Power Unit / Propulsion Unit
Cable harness The cables of the Propulsion Unit (2.5m
DRV 12P
standard length) are supplied by BlueNav.
SIG 9P
TEMP1
They are ready for wiring.
TEMP2 (spare)
The location chosen for the mechanical
Yellow phase
installation of the Propulsion Unit and Power
Orange phase
Unit must allow the wiring as shown.
Propulsion Unit Red phase
If the BlueSpin system is a twin-motor
system, repeat the wiring procedure for the
second Propulsion Unit with the
corresponding Power Unit.
20 N·m
WARNING!
If the BlueSpin system is a twin-motor system, each Power Unit is identified “port side” and
“starboard”. Each Power Unit must be installed on board according to their position
identification. Each Power Unit is wired to its corresponding Propulsion Unit.
The starboard/portside position of a Propulsion Unit is determined by its wiring to a
starboard/portside Propulsion Unit.
13.5.1 Temperature sensors wiring (TEMP1 and TEMP2)
The Propulsion Unit is equipped with 2 temperature sensor cables, TEMP1 and TEMP2. Each
sensor cable is delivered with its WEIPU connector and its sensor tip.
Only the TEMP1 cable has to be connected. The TEMP2 cable is a spare cable.
13.5.2 Motor phase wiring (bulkhead connectors)
The wiring of the yellow, orange and red motor power phases must be respected. It enables a
correct forward/reverse throttle direction.
The bulkhead connectors wiring is carried out with the following procedure:
1. Unscrew the truss head screw (M8xM16) on the corresponding bulkhead. Remove the
lockwasher.
2. Place the cable end flat on the plain washer.
3. Place the lockwasher flat on the cable end.
4. Screw the truss head screw (M8xM16) to fasten the assemblage using a 5mm Allen wrench
and a 20N⋅m torque.
5. Put one of the caps supplied on the bulkhead connector.
36
DANGER!
To prevent overheating and a fire outbreak, the yellow, orange and red motor phase cables
must be wired to the bulkhead terminals in accordance with the specified torque. The washers
must be flat.
13.6 Power Unit / converter wiring
The 3m “PU Power Supply” cable is
supplied by BlueNav.
The location chosen for the
mechanical installation of the Power
Power Supply Unit must allow the wiring to its
DC/DC 48/12V - 30A
Power Unit corresponding DC/DC 48V/12V – 30A
Converter converter (see p.11).
Wire according to the diagram.
WARNING!
If the BlueSpin system is a twin-motor system, each Power Unit is identified “port side” and
“starboard”. Each Power Unit must be installed on board according to their position
identification. Each Power Unit is wired to its corresponding Propulsion Unit.
Each Power Unit is wired to its corresponding converter.
13.7 Power Unit / batteries wiring
The +48V and -0V power cables for
connecting the batteries are not
supplied by BlueNav. See p.12.
48V (+)
Propulsion Batteries 0V (-) The client must provide a sufficient
cable length, determined by the
mechanical installation of the batteries
and of the Power Unit in the boat.
20 N·m
Wire according to the diagram.
13.7.1 Battery wiring (bulkhead connectors)
The bulkhead connectors wiring is carried out in the following procedure:
1. Unscrew the truss head screw (M8xM16) on the corresponding bulkhead. Remove the
lockwasher.
2. Place the cable end flat on the plain washer.
3. Place the lockwasher flat on the cable end.
37
4. Screw the truss head screw (M8xM16) to fasten the assemblage using a 5mm Allen wrench
and a 20N⋅m torque.
5. Place one of the caps supplied on the bulkhead connector.
DANGER!
To prevent overheating and a fire outbreak, the battery power cables must be wired to the
bulkhead terminals in accordance with the specified torque. The washers must be flat.
WARNING!
The BlueSpin system is designed for 48V DC batteries wiring. Please see the battery
documentation for wiring, installation and charging specifications.
13.8 Wiring of the Power Unit / CCU (CAN PROPULSION network)
The wiring of the CCU and the Power Unit(s) result in the creation of the CAN PROPULSION
network of the BlueSpin system.
13.8.1 CAN network definition
A CAN network is a communication serial network allowing several peripherals to exchange data.
Each peripheral, called a node, is connected
Noeud 1 Noeud 2 Noeud 3
CAN Low to a common path, called a backbone. The
CAN High backbone is composed of two wires, CAN Low
Rt = 120Ω and CAN High, that transmit signals of
differential voltage. 120Ω terminations are
placed at the ends of the backbone to
Figure 1. Linear topology of a CAN network. stabilize the signal and transmit reliable data.
Together, they form a CAN network with a linear topology. This linear topology enables simplified,
direct and high-performance communication.
13.8.2 CAN PROPULSION network specific to the BlueSpin system
The CAN PROPULSION network of the BlueSpin system connects the CCU and the Power Unit(s).
It is created during the installation of the BlueSpin system.
To create the CAN PROPULSION network of the BlueSpin system, the following components are
required:
CAN Bus 120 Ω female
CAN Bus Cables
termination
CAN Bus 120 Ω male
CAN Bus T-connector
termination
38
These components are not supplied by BlueNav. See p.12 for required quantities depending on a
twin-motor or single-motor setup.
The length of the CAN Bus cables depends on the mechanical installation and the distance
between the CCU and the Power Unit(s).
WARNING!
The CAN PROPULSION network of the BlueSpin system relies on a CAN bus protocol. This CAN
bus protocol must not be confused with the NMEA 2000® CAN bus network of the boat.
The NMEA 2000® CAN bus network is used to transmit data between devices of different
types and from different manufacturers, such as GPS, compass, wind, depth, AIS, speed or motor
data. It is set up prior to the BlueSpin system installation. See p.39.
Connect the wiring according to the following diagram:
1 2
M M
M
F F F
max 0,5 m max 0,5 m max 0,5 m
M M M
M F M F M F
max 20 m max 10 m
WARNING!
Each end of the CAN PROPULSION network backbone must be equipped with 120Ω
terminators.
WARNING!
Do not confuse the CAN PROP and NMEA connectors on the CCU. The CAN PROP connector is
for wiring the CAN PROPULSION network of the BlueSpin system. The NMEA connector is for
wiring the NMEA 2000® CAN bus network (National Marine Electronics Association) of the boat.
13.9 CCU / on-board NMEA 2000® network wiring
NMEA 2000® is a plug-and-play communication standard used to connect marine sensors and
display devices in boats. This standard applies to CAN bus networks (see p.38). The UCC of the
BlueSpin system connects to the backbone of the NMEA 2000® network of the boat to exchange
information.
39
The NMEA 2000® cable is not supplied by BlueNav. It is used to connect the CCU to the NMEA
2000® network on board (see p.11). The client needs a cable length that does not exceed 1m,
determined by the configuration of the NMEA 2000® network on board.
Connect the CCU to the backbone of the NMEA 2000® network on board as shown in the
following diagram:
NMEA 2000®
NMEA 2000® backbone on board
WARNING!
Do not confuse the CAN PROP and NMEA connectors on the CCU. The CAN PROP connector is
for wiring the CAN PROPULSION network of the BlueSpin system. The NMEA connector is for
wiring the NMEA 2000® CAN bus network (National Marine Electronics Association) of the boat.
13.10 CCU / MFD wiring
The Ethernet cable is not supplied by BlueNav. It is used to connect the CCU to the NMEA
2000® network on board (see p.11). For wiring, the client needs a cable length suited to the
mechanical installation.
Connect the Ethernet cable on the Ethernet port of the CCU and on the Ethernet port of the
MFD as shown in the following diagram:
Ethernet
Multifunctional Display
13.11 CCU / Converter wiring
The 6m “Remote 1” cable and “Remote 2” cable (in case of a twin-motor setup) are supplied by
BlueNav.
These cables are used to connect the CCU to the converter(s) on board (see p.11).
See the converter documentation to carry out the wiring on its Remote on/off output, as shown in
the following diagrams:
40
Remote 1
Remote 2
CCU / converters wiring (twin-motor setup)
Remote 1
CCU / converter wiring (single-motor setup)
13.12 CCU / Power supply wiring
The 3m “CCU Power Supply” cable is supplied by BlueNav. It connects the CCU to the 12V DC
power supply on board (see p.11), as shown in the following diagram:
CCU Power Supply
12V DC Power Supply on board
WARNING!
The CCU is protected internally by a 1.5A fuse. Use the same fuse for the power supply on
board.
13.13 CCU / Command Panel wiring
The VCU cable harness (marked blue) and the THR_L and THR_R extension cables (marked white
and green respectively) are supplied by BlueNav. Cables coming out of the VCU harness are
identified by labels.
Carry out the wiring according to the following diagrams and color identifications:
41
ON/OFF
DOCKING
ELEC M
BUZZER
VCU
KILLSWITCH - M
JOYSTICK
THR_L
THR_R
Figure 2. CCU / Command Panel (twin-motor) wiring.
KILLSWITCH - M
ON/OFF
ELEC M
DOCKING
VCU
JOYSTICK
THR_L
Figure 3. CCU / Command Panel (single-motor) wiring.
42
14. APPENDIXES
14.1 Well blueprint (Inhull Propulsion Unit)
43
14.2 Drilling blueprint (Command Panel)
44
45
[READING ORDER TEXT]
12
Version n°2.1-INST-1.3-EN
Version N° Date Changes
0.9 3/1/2023 Creation of the document
1.0 6/5/2023 Inhull installation steps added: §5.4.4 ; §5.4.8 ; §8.15
1.1 9/12/2023 Commissioning steps modified: §7.3
1.2
9/27/2024 Product activation updated
CCU external antennas removed
Source configurationupdated
1.3 4/9/2025 All technical data updated
All technical illustrations updated
Parts 3. to 13.13. added
Parts 1. to2. rewritten3
Table of contents
1. MANUAL INTRODUCTION.........................................................................................................6
1.1 About.................................................................................................................................................6
1.2 Intellectual Property.....................................................................................................................6
2. SECURITY......................................................................................................................................7
2.1 General safety instructions.......................................................................................................7
2.2 Levels of safety instructions....................................................................................................7
3. DELIVERED MATERIAL.............................................................................................................9
3.1 Contents of delivery.....................................................................................................................9
3.2 Storage conditions....................................................................................................................10
4. NON-DELIVERED MATERIAL REQUIRED........................................................................... 11
4.1 DC/DC Converter with Remote entry................................................................................11
4.2 CCU Power supply....................................................................................................................11
4.3 Multifunctional Display (MFD)..............................................................................................11
4.4 NMEA 2000® Network...........................................................................................................11
4.5 Batteries........................................................................................................................................12
4.6 Unsupplied screws for mechanical installation............................................................12
4.7 Unsupplied cables and connectors for wiring...............................................................12
4.8 Required tools for mechanical installation......................................................................13
5. TECHNICAL DATA..................................................................................................................... 14
6. PRODUCT DIMENSIONS..........................................................................................................15
7. PRODUCT DESCRIPTION.........................................................................................................17
7.1 Outboard Propulsion Unit.......................................................................................................18
7.2 Inhull Propulsion Unit...............................................................................................................18
7.3 Power Unit....................................................................................................................................19
7.4 CCU (Communication and Control Unit).........................................................................19
7.5 Command Panel........................................................................................................................19
8. MECHANICAL INSTALLATION REQUIREMENTS .............................................................20
8.1 General requirements..............................................................................................................20
8.2 Position of the Propulsion Unit............................................................................................20
9. INSTALLATION OF THE OUTBOARD PROPULSION UNIT...............................................214
9.1 Verticality rework.......................................................................................................................21
9.2 Galvanic protection...................................................................................................................21
9.3 Drilling of the external covers of the Propulsion Unit (cable entry)........................22
9.4 Mounting procedure of the Outboard Propulsion Unit...............................................23
10. INSTALLATION OF THE INHULL PROPULSION UNIT................................................25
10.1 Well creation................................................................................................................................25
10.2 Mounting procedure of the Inhull Propulsion Unit.......................................................25
11. INSTALLATION OF THE POWER UNIT............................................................................27
11.1 Space taken by the Power Unit............................................................................................27
11.2 Mounting procedure of the Power Unit............................................................................28
12. INSTALLATION OF THE COMMAND PANEL AND THE CCU.....................................29
12.1 Position of the CCU..................................................................................................................29
12.2 Position of the Command Panel.........................................................................................29
12.3 Space taken by the Command Panel and the CCU.....................................................29
12.4 Mounting procedure of the Command Panel and of the CCU................................30
13. WIRING....................................................................................................................................31
13.1 Identification of the connectors of the Power Unit......................................................32
13.2 CCU connectors identification.............................................................................................33
13.3 Global wiring of the single-motor BlueSpin system.....................................................34
13.4 Global wiring of the twin-motor BlueSpin system........................................................35
13.5 Wiring of the Power Unit / Propulsion Unit.....................................................................36
13.5.1 Temperature sensors wiring (TEMP1 and TEMP2)...........................................36
13.5.2 Motor phase wiring (bulkhead connectors)..........................................................36
13.6 Power Unit / converter wiring...............................................................................................37
13.7 Power Unit / batteries wiring................................................................................................37
13.7.1 Battery wiring (bulkhead connectors)......................................................................37
13.8 Wiring of the Power Unit / CCU (CAN PROPULSION network)...............................38
13.8.1 CAN network definition..................................................................................................38
13.8.2 CAN PROPULSION network specific to the BlueSpin system.......................38
13.9 CCU / on-board NMEA 2000® network wiring.............................................................39
13.10 CCU / MFD wiring.................................................................................................................405
13.11 CCU / Converter wiring.......................................................................................................40
13.12 CCU / Power supply wiring...............................................................................................41
13.13 CCU / Command Panel wiring........................................................................................41
14. APPENDIXES........................................................................................................................43
14.1 Well blueprint (Inhull Propulsion Unit)...............................................................................43
14.2 Drilling blueprint (Command Panel)...................................................................................446
1. MANUAL INTRODUCTION
1.1 About
This manual contains installation instructions for the following motorizationsystems:
• BlueSpin 15 kW Outboard
• BlueSpin 15 kW Inhull
For practical reasons, it is not possible toinclude detailed information covering all possible
alternatives forinstallation, operation or maintenance. The drawings and images in this manual are
shown for explanatory purposes only.
In the event of differences of interpretation betweenthe multilingual versions of the manual, the
French version shall prevail. BlueNav is the sole rightowner of the final interpretation of this
manual.
The contents of this manual relate strictly to the installation of the BlueSpinsystem. The
integration of the energy system (batteries, BatteryManagement System, chargers)is
independentand described in the manuals supplied by their manufacturers.
In the event of any discrepancy between the products supplied and this manual, orin case of
doubt,please visit www.bluenav.com or contact us at support@bluenav.com.
1.2 Intellectual Property
BlueNav retains the intellectual property and industrial property rights,including copyrights,
patents, logos, diagrams, and drawings, of its products, publications and software.
This installation manual is for reserved use only. Nopart of this manual maybe reproduced or
transmitted in any form orby any means without ourprior written permission.
None of these pages may be reproduced, in whole or in part, without writtenauthorization from
BlueNav.7
2. SECURITY
2.1 General safety instructions
This manual explains how to install the BlueSpinsystem in a simple and safe way. However, some
specialized knowledge is required for working on ormodifying the boat’s hull.Call an expertif
necessary.
Read the entire manual carefully before installing and operating the system. Failure to follow the
instructions may result in serious property damage or personal injury. The BlueSpinsystem must
be installed in accordance with the installation recommendations described in the documents
supplied.
BlueNav accepts no responsibility for anydamage caused by actions other than those described
in this manual. Modifications to the hull of the boat should only be carried outby professional
builders and architects. Compliance with local standards and regulations is mandatory.
Please observe the following general safetyinstructions:
The boat on which the BlueSpin system is installed must be stable.
The boat must be compatible with the installation and the use of the BlueSpinsystem,as
verified beforehand during project commissioning.
To prevent corrosion and ensure lasting waterproofness, consider the hull material and provide
the appropriate sealants and fastening materials.
Bores and holes in the hull can affect its structure and stability. Provide suitable fastening
materials.
Use the appropriate lifting equipment to move heavy elements.
2.2 Levels of safety instructions
Safety instructions are scaled at 3 levels. They are categorized according to risk severityif the
instructions are not followed.
BlueNav accepts no liability for any damage caused by actions not complying with these
instructions.
DANGER!
Immediate danger ofdeath or of serious injury.
WARNING!
Danger of personal injury or of material damage.8
Apart from the safety instructions, additional information is indicated by the following:
NOTE
Useful additional information: assembly advice, description ofa component, specific
recommendation, etc.9
3. DELIVERED MATERIAL
3.1 Contents of delivery
Element
Quantity
Outboard
single-motor
Outboard
twin-
motor
Inhull single-
motor
Inhull
twin-motor
Main Elements
Propulsion Unit with cable harness:
- DRV cable
- SIG cable
- Yellow motorphase cable
- Orange motorphase cable
- Red motorphase cable
- TEMP1 cable
- TEMP2 (spare) cable
1 2 1 2
CCU (Communication and Control
Unit)
1 1 1 1
Command Panel 1 1 1 1
Power Unit*
*Identified “portside” and “starboard” in
case of twin-motor setup.
1 2 1 2
Wiring
“CCU Power Supply” cable 1 1 1 1
“Remote 1” cable 1 1 1 1
“Remote 2” cable 0 1 0 1
“PU Power Supply” cable 1 2 1 2
Green “THR_R” extension cable 0 1 0 1
White “THR_L” extension cable 1 1 1 1
Blue “VCU” cable harness
- “KILL SWITCH – M” cable x2
- “ON/OFF” cable
- “ELEC M” cable
- “DOCKING” cable
- “BUZZER” cable
- “JOYSTICK” cable
1*
*Without the
“DOCKING”
cable
1
1*
*Without the
“DOCKING”
cable
1
Protective covers for the bulkhead
connectors of the PowerUnit
5 10 5 1010
WEIPU SP21 connector forthe TEMP1
& TEMP2 cables
2 2 2 2
Screws
M10 nylon shoulder washers 4 8 0 0
M4x8 countersunk head screws to
fasten the Z bar on the Power Unit
3 6 3 6
M4x12 countersunk head screws to
fasten the aluminum bar on the Power
Unit
3 6 3 6
STS M6x4 A4 – 70 Torx screws for
external covers
16 32 0 0
Accessories
Aluminum bar 1 2 1 2
Z bar 2 4 2 4
Centering template 0 0 1 1
Rearinstallation template 1 1 0 0
Side installation template 1 1 0 0
Watertight seal 0 0 1 2
3.2 Storage conditions
If the BlueSpin system is not immediatelyinstalled, itmust be stored in its transport packaging ina
dry, clean and dust-free environment.
Please observe the following criteria:
- Ambient temperature between 5°C and 40°C;
- Relative humidity below 60%;
- No sudden changes in temperature, vibration,gas or corrosive agents;
- Maximum stackable weight on packaging does not exceed 220kg.
NOTE
Some cables, connectors and screws necessary forthe installation are not supplied. To learn
more, see p.12.
WARNING!
Always handle and move the BlueSpin verticallyin its original packaging.11
4. NON-DELIVERED MATERIAL REQUIRED
The BlueSpin system is designed to be installed intoa boatalready equipped with a thermal
propulsion system. Due to the many different characteristics ofeachboat,some of the
components required for the installation of the BlueSpin systemare notsupplied by BlueNav on
delivery but must be present on board.
If you have any doubts about the compatibility of the material listed below, please contact
BlueNav after-sales service.
4.1 DC/DC Converter with Remote entry
The converteris used to transform 48V voltage (fromthe batteries)into 12V topower the CCU.
Each Power Unit in the BlueSpin system is wired toa converter. The CCUis alsowired toeach
converter. See p.34-p.35.
The converter must meet the following requirements:
Specifications Value
Rated input voltage 48V
Isolated rated output voltage 12V
Output direct current 30A
Remote on/off connector Present
Count one converter perPower Unit of the BlueSpin system.
4.2 CCU Power supply
A power supply of 12V DC - 1A is required onboard to power the CCU. This power supply canbe
the service battery on board. See p.41 for the wiring procedure.
4.3 Multifunctional Display (MFD)
A Multifunctional Display (MFD) is required onboard to display the BlueNavapplication. The
BlueNav application is part of the HMI (Human-Machine Interface) that allows the user to steer
the BlueSpin system. See p.40 for the wiring procedure.
4.4 NMEA 2000® Network
The boat's NMEA 2000® CAN bus network is used to transmitdata between devices of different
types and from different manufacturers, such as GPS, compass, wind, depth,AIS, speed or motor
data. It is pre-existent to the BlueSpin systeminstallation.
The CCU of the BlueSpin system must be wired to the backbone of the NMEA2000® Network on
board to guarantee good data communication. See p.39 for the wiring procedure.12
4.5 Batteries
The BlueSpin system is an electrical propulsion system. Thus, itis powered by batteries. The
batteries must meet the following requirements:
Specifications Value
Rated voltage 48V
Current type Direct current
Rated current 300A
Discharge capacity High
Batteries are wired to the Propulsion Units of the BlueSpinsystem. Count 300A per motor of the
BlueSpin system. See p.37 for the wiring procedure.
4.6 Unsupplied screws for mechanical installation.
*Depends on the drilling environment.
4.7 Unsupplied cables and connectors for wiring
The table below summarizes the items needed in addition to the hardware supplied,depending on
the setup of the BlueSpin system ordered. See the wiring procedures for further details.
NOTE
BlueNav can provide advice for choosing batteries.Contact the after-sales service.
Equipment Quantity Corresponding Procedure Outboard Inhull
M10 type screw
(INOX 14/A4 316L)
4 p.23 (step 5) X
M8 type screw 14 p.25 (step 6) X
M4 type screw 3 p.28 (step 1) X X
M6 type screw 2 p.28 (step 6) X X
M5 type screw 2 to 6* p.30 (step 1) X X
M5 type screw 6 p.30 (step 5) X X
WARNING!
All screws not supplied must be compatible with the mounting environment. Incase ofdoubt,
contact BlueNav after-sales service.
Element
Quantity
Corresponding Procedure
Single-motor Twin-motor
Ethernet cable 1 1 See p.4013
4.8 Required tools for mechanical installation
This list is indicative and non-exhaustive. Additional tools maybe required depending on the
components not supplied (see p.11) and the specificcharacteristics of the boaton which the
BlueSpinsystem is installed.
Tool Used for Outboard Inhull
Lifting table Move the Propulsion Unit X X
Wedges
Support the Propulsion Unit during material
handling on the lifting table
X X
8mm Allen wrench Manually lower the turbine X X
Torque wrench Screw with the correct torque X X
Sealing product* Seal the holes in the hull X X
70mm hole saw Drill the cable entry in the hull X
17mm clamping bush Tighten the Propulsion Unit screws X
17mm torque wrench Tighten the Propulsion Unit screws X
13mm clamping bush
Tighten the screws of the Propulsion Unit
covers
X
Phillips screwdriver
Tighten the screws of the Power Unit and of
the Command Panel (11.2 and 12.4)
X X
Flat head screwdriver Unscrew the Junction Boxcaps. X X
*Depends on the drilling environment.
NMEA 2000® Micro-C cable 3 5
See p.38
CAN Bus T-connector 2 3
120 Ω CAN Bus female termination 1 1
120 Ω CAN Bus male termination 1 1
Cable CAN Bus M12 F/M 1 3 See p.39
+48V power cable 1 2
See p.37
-0V power cable 1 214
5. TECHNICAL DATA
Propulsion Unit rated power
The maximum power and the maximum motor rotation
speed depend on the boat-motor-propeller combination.
Depending on the use, maximum motor speed may not
be reached.
15kW
Propulsion Unit thermic outboard equivalent
(estimation)
25hp
Rated voltage 48V DC
Rated current 300A
Maximum current 350A
Maximum motor rotation speed 1500rpm
Type of motor temperature sensor / Number PT1000 / 2
Length of the cable harness coming from the
Propulsion Unit (SIG, DRV, TEMP1, TEMP2, yellow
motor phase, orange motor phase, red motor
phase)
2.5m
Length of “CCU Power Supply” and “PU Power
Supply” cables
3m
Length of “Remote 1” and “Remote 2” cables 6m
Length of white “THR_L” and green “THR_R”
extension cables
2m
Weight of the Propulsion Unit
Outboard 78kg
Inhull 74,4kg
Weight of the CCU 1.1kg
Weight of the Command
Panel
single-motor 1.1kg
twin-motor 1.8kg
Weight of the Power Unit 15,6kg
Turbine Protection Index IP68 - seawater resistant
Command System
Push buttons
Direction joystick
Left / Right throttles15
6. PRODUCT DIMENSIONS
Dimensions of the Outboard Propulsion Unit
A 921mm
B 465mm
C 448mm
D 565mm
E 290mm
F 44.5mm
Dimensions of the Inhull Propulsion Unit
Classic version Extra-long version
A 995mm
B 494mm
C 408mm
D 638mm
E 290mm
F 44.5mm
G 564mm
A 1,308mm
B 494mm
C 408mm
D 638mm
E 290mm
F 390mm
G 963mm16
Dimensions of the Power Unit
A 200mm
B 360mm
C 404mm
Dimensions of the CCU
A 80mm
B 161mm
C 280mm
Dimensions of the Command Panel (twin-motor)
A 135mm
B 150mm
C 230mm
A
B C
A
B
C
A
B C17
7. PRODUCT DESCRIPTION
The BlueSpin system is an electrical propulsion system designed tobe used as a secondary motor
to hybridize a boat's pre-existing thermic propulsion.
It is available in two models:
• The Outboard BlueSpin 15 kW: outboard motor.
o single-motor version
o twin-motor version
• The Inhull BlueSpin 15 kW: installed within the hull,ina well.
o single-motor version
o twin-motor version
The features of the Inhull BlueSpin system are identical to the Outboard BlueSpin system. Only
the external aspect and the installation instructions of the Propulsion Unit change.
The two models are equipped with a retractable RIMDrive propeller. When inuse, the RIM Drive
propeller is lowered through the underside of the Propulsion Unit. Afteruse, the RIM Drive
propeller retracts within the Propulsion Unit.
The BlueSpin system, whether it’s an Outboard or an Inhull model, consists of the following
components:
Elements
Quantity
single-motor twin-motor
Propulsion Unit 1 2
Power Unit 1 2
CCU (Communication and Control
Unit)
1 1
Command Panel 1 1
NOTE
The diagrams in this installation manual can depict the RIM Drive propeller as lowered (in “using
mode”) for illustration or explanation purposes only.When the system is delivered, the RIMDrive
propeller of the Propulsion Unit is retracted by default.18
7.1 Outboard Propulsion Unit
The Outboard PropulsionUnit of the
BlueSpinsystem is designed for an outboard
installation,against the hull (see p.21).
The Outboard PropulsionUnit can be
screwed on its front side or on one of its
lateral sides.
The Outboard PropulsionUnit is equipped
with covers. Those covers must be drilled
before the installation (see p.22) to create a
cable entry.
The Outboard PropulsionUnit is compatible
with a 0-14° hull angle.
1 Upper side cover
2 Rear side cover
3 Lateral side cover
4 Junction box
5 Cable entry
6 Gyration box
7 Chassis
8 RIM Drive propeller
9 Trapezoidal screw
7.2 Inhull Propulsion Unit
1 Lifting eye
2 Watertight cable entry
3 Sealing plate
4 Gyration box
5 Chassis
6 RIM Drive propeller
7 Trapezoidal screw
The Inhull Propulsion Unitof the BlueSpin systemis
designed tobe installed within a well. This well is
installed beforehand in the hull (see p.25).
The Inhull Propulsion Unitis equipped witha sealing
plate on its upper side. The sealing plate has a cable
entry. The sealing plate is equipped withlifting eyes to
move the Propulsion Unit.
The Inhull Propulsion Unitis available ina classic
versionand in anextra-long version.
The extra-long version has a longer shaft. See p.15.
NOTE
Contact our technical teams for a suitable installation
if necessary.
4
5
6
7
8
9
1
3 2
2
3
4
5
6
7
119
7.3 Power Unit
1 Box
2 Command connectors
3 48V DC bulkhead connectors
4 Motor phase bulkhead connectors
5 Number plate
The detailed description of the connectors is given at p.32.
The Power Unit enables the control of the motors within the Propulsion Unit.
7.4 CCU (Communication and Control Unit)
1 Box
2 M12 male connectors
3 Number plate
4 RJ45 female connectors
5 M12 female connectors
6 WEIPU male connectors
The Communication and Control Unit (CCU) is a control system and a communicative gateway. It
transmits data through the NMEA 2000® network (see p.11).
7.5 Command Panel
1 Panel of the Command Panel
2 Push buttons
3 Throttles
4 Cut-off switch
5 Direction joystick
The Command Panel is used to switch on and activate controls.
The Command Panel is supplied with two cables prewelded on the rear connectors THR_L
(identified in white) and THR_R (identified in green).Cable extensions are connected to the
prewelded cables to facilitate the wiring with the CCU (see p.41).
In case ofa single-motorBlueSpin system, the Command Panel is equipped with a simple throttle.
2
3
4
5
1
1
2
3
4
5
6
1
2
3
4
520
8. MECHANICAL INSTALLATION
REQUIREMENTS
8.1 General requirements
The precise dimensions ofthe different elements supplied by BlueNavare available p.15. Make
sure that these dimensions are compatible with the installation environment.
For the material that is required but not supplied, see p.11.
Observe the safety instructions to ensure a safe and correct installation of the BlueSpinsystem.
See p.7.
8.2 Position of the Propulsion Unit
The Propulsion Unit of the BlueSpin system is positioned against or within the hull, according to
the following requirements:
- The chassis of the Propulsion Unit does
not protrude from the hull of the boat;
- The chassis of the Propulsion Unit is
immersed underwater ata maximum of
250mm from its lowest point;
- In lowered position, the RIM Drive propeller
is completelyunder the hull and
underwater;
- In retracted position, the RIM Drive
propeller does notprotrude from the hull.
Regarding the Outboard Propulsion Unit, the installation template (Rear or Side)must be placed
against the hull to identify the drilling position.
Regarding the Inhull Propulsion Unit, the installationwell (see p.25) must comply with these
requirements.
Min 150mm
Max 250mm
Waterline
DANGER!
The boatand all its components must be isolated from electrical sources.
The mechanical installation work must be carried out on land only. The boat must be out of
water.
WARNING!
The BlueSpin system requires an on-board powersupply. Plan the position of the elements of
the BlueSpin system so as not to affect sensitive electrical equipment (e.g. radios) or measuring
instruments (e.g. compasses). Relocate those devices if necessary.21
9. INSTALLATION OF THE OUTBOARD
PROPULSION UNIT
The Outboard Propulsion Unit is installed outboard,against the hull of the boat.
9.1 Verticality rework
α : vertical recovery angle
The Outboard PropulsionUnit mustbe mounted ona flat
and vertical surface of the hull. The mounting surface
should be as vertical as possible.
If the mounting surface is not perpendicular to the
waterline, create a wedge so that the chassis canbe
vertical.
The material of the wedge depends on the mounting
environment. If the wedge is made ofstainless steel,use
M12 nylonshoulder washers between the PropulsionUnit
and the wedge topreventmetal-on-metal contact.
9.2 Galvanic protection
Galvanic corrosionis a common phenomenonin
metallicstructures that causes significant
damage. This electrochemical reaction occurs
when two dissimilar metals come into contact in
a conductive environmentsuch as a liquid,a soil
or within atmospheric humidity.
The chassis of the Propulsion Unit is made of
anodized aluminum. To avoid corrosion, BlueNav
supplies nylonshoulder washers for mounting
the motors as shown.
The screws used to secure the chassis are of the following types: M10 INOX14/A4 316L (see p.12).
α
WARNING!
Never let the Propulsion Unit rest on the RIMDrive propeller. Use shims to ensure that the
Propulsion Unit rests on its chassis. The RIM Drive propeller must notbe subjected to any
weight.
Mounting surface (hull or
vertical interface)
Chassis
Nylon shoulder
washer22
WARNING!
If the hull is in a metal other than aluminum,plan a galvanic protectionbetween:
- The hull and the chassis;
- The hull and the screws.
9.3 Drilling of the external covers of the Propulsion Unit (cable entry)
The length of the cable harness from the PropulsionUnit is
2.5m. This cable harness is used to wire the Propulsion Unit
to its corresponding Power Unit (see p.36).
The Power Unitis installed within the hull of the boat.To
wire the BlueSpin systemin an Outboard setup,it is
necessary todrill the hull of the boatand one of the
external covers of the Propulsion Unit.
Each boat has its own specific configuration. The drilling of the cable entry must be considered on
a case-by-case basis.
Depending on the mounting environment and on the boat
configuration, twopossibilities for cover drilling are
available:
• Upperside cover drilling;
• Lateral side cover drilling.
The drilling is carried out using a ∅70mm diameter hole
saw on the side of the cutout of the chassis for the cable
outlet. See p.23.
The drilling must meet the following requirements:
• The cable harness must be able topass through the hull without being twisted;
• It must be possible to seal the cable entry during the installationprocess.
WARNING!23
9.4 Mounting procedure of the Outboard Propulsion Unit
1. Identify the mounting side (Rear or Side)
of the Propulsion Unit depending on the
configuration of the boat. The surface on
which the mounting side of the
Propulsion Unit is mounted must be flat
with a tolerance of 2mm/m (see p.21)
• If the chosen side of the Propulsion
Unit is the lateral side, use the “Side”
installation template for the next
step.
• If the chosen side of the Propulsion
Unit is the front side, use the “Rear”
installation template for the next
step.
2. Using the installation template and a drill,
drill 4 holes for M10 screws on the
mounting interface (hull orwedge).
3. Put the Propulsion Unit infront of the
mounting interface.Respect the
direction of the RIM Drive propeller. The
arrow on the baseplate must point
backwards.
4. Mark the desired cable entry point in the
hull (see p.22). Using a Ø70mm hole saw,
drill the hull according to this parameter.
The cable harness can be guided through
the hole drilled at this stage or afterwards. All
cables mustbe straightand not twisted.
When making the cable harness go through,
put the TEMP1 and TEMP2 cables first, then
the yellow, orange and red phase motor
cables.
Ø70 mm
WARNING!
Never let the Propulsion Unit rest on the
RIM Drive propeller. Use shims to ensure
that the Propulsion Unit rests on its
chassis. The RIMDrive propeller must not
be subjected toany weight.24
5. Using a minimum torque of 33N⋅m and
using M10 screws, screw in the following
order.
6. Using M6x40 truss head screws and a
tightening torque of 2N⋅m,screw the
covers onto the Propulsion Unit.
33 N·m 1 3
4 2
2N·m
WARNING!
Always seal the cable entry after wiring the
Propulsion Unit/Power Unit (see p.36).
WARNING!
Use only A4 / 316 L stainless steel screws
(M10). Adapt the screwing to the mounting
surface.
To enable the screwing ofthe external
covers on the chassis, the diameter ∅ of
the screws for the mounting side of the
Propulsion Unit must not exceed 22mm.
WARNING!
The covers are in HDPE. Do not over-
tighten. This can damage the screw
threading.25
10. INSTALLATION OF THE INHULL
PROPULSION UNIT
The Inhull Propulsion Unit is designed tobe installed within a well, within the hull of a boat.
The position and dimensions of the well mustallow the Inhull Propulsion Unit to comply with the
position requirements (see p.20).
10.1 Well creation
The well of the Inhull Propulsion Unit is created beforehand and complies withthe structural
requirements of the boat. These requirements are discussed beforehand during the project
commissioning phase. See the information provided by BlueNav teams at this stage.
The blueprint for the creation of the well is available in the appendix p.43.
The well of the Inhull Propulsion Unit must:
- Comply with the positioning requirements of the Propulsion Unit described in p.20 ;
- Be made in a watertight material;
- Allow the RIM Drive propellers to turn and lower fully when the systemis in use.
10.2 Mounting procedure of the Inhull Propulsion Unit
1. Using the centering mark, center the
drilling template on the shims of the well.
2. Using the template, mark the 2 drilling
locations. Drill a ∅22.5mmhole on each
shim.
=
=
∅ 22,5 mm
WARNING!
The creation of the well generates structural modifications of the boat. It mustbe carried outby
professionals only.26
3. In compliance with the holes drilled on
the shims of the well in the previous step,
screw the centering pins on using a
20mm open-end wrench (15N⋅m torque)
on the underside of the chassis. The
centering pins are available in a kit and
are screwed on using M8x25 BTR (Allen)
screws.
When screwing, apply a medium-strength
thread-locker (Loctite 243 or equivalent). To
facilitate the installation, two pin mounting
positions are available onboth sides of the
chassis.
4. Position the flat gasketunder the
sealing plate of the Propulsion Unit.
Line up the holes of the seal with the
holes of the sealing plate.
5. Using the lifting eyes,guide the
Propulsion Unit downintothe well. The
centering pins fit in the drilled holes.
6. Screw the sealing plate to the watertight rim of the well with
14 M8 screws. The tightening torque depends on the M8
screws selected and the mounting environment.
WARNING!
Check that the flat gasketis correctly positioned between the
sealing plate of the Propulsion Unit and the watertight rim of the
well:
- The holes of the gasket must be aligned;
- The gasket must be pressed against the watertight rim of
the well.
Incorrect installation is detrimental to motor mounting and
sealing.
15 N·m
WARNING!
Use the lifting eyes on the sealing plate
to handle the Propulsion Unit.
Never let the Propulsion Unit rest on the
RIM Drive propeller. Use shims to ensure
that the Propulsion Unit rests on its
chassis. The RIM Drive propeller must not
be subjected to any weight.27
11. INSTALLATION OF THE POWER UNIT
The Power Unit is designed to be installed within the hull of the boat.
The Power Unit should be installed:
- As close as possible to the corresponding PropulsionUnit to allow wiring (see p.36). The
motor power and control cables have a standard length of 2.5m. Check that the chosen
location is compatible with this length.
- Dry and sufficiently ventilated to avoid humidity.
- Protected from watersplashes.
- Accessible for future maintenance.
The Power Unit can be installed horizontally or vertically,provided the above requirements are
met. However, vertical installationis recommended.The mounting procedure remains identical.
See p.28.
11.1 Space taken by the Power Unit
During the installation of the Power Unit, comply with the following dimensions:
1 404mm
2 20mm minimum
3 100mm minimum
4 194mm
5 100mm minimum
6 420mm
WARNING!
If the BlueSpin system is a twin-motor system, eachPower Unit is identified “port side” and
“starboard”. Each Power Unit must be installed on board according to their position
identification. Each Power Unit is wired to its corresponding Propulsion Unit.
1
3 4
2
5 628
11.2 Mounting procedure of the Power Unit
1. Using the level, screw the Z bar
horizontally onto the hull. Use screws
adapted for the mounting surface.
Count 120mm of free space above the Z
bar.
2. Using the 3 M4x8 screws and a 2 N·m
torque,screw the Z bar onto the rear
side of the Power Unit in the drilled
holes.
3. Using the 3 M4x12 screws and a 2 N·m
torque,screw the aluminum bar onto
the rearside of the PowerUnit in the
drilled holes.
4. Clip the Z bar of the Power Unit onto the
Z bar of the mounting surface.
5. Identify the drilling points of the
aluminumbar on the mounting surface.
Drill ∅6mm screwing holes in diameter.
6. Screw the aluminumbar onto the
mounting surface. Use ∅6mm diameter
screws adapted for the mounting
surface.
≥ 120 mm
2 N·m
2 N·m29
12. INSTALLATION OF THE COMMAND
PANEL AND THE CCU
12.1 Position of the CCU
The CCU is designed to be wired to a powersupplyof 12V DC onboard. It acts as a gateway
between the BlueSpin system, the NMEA2000® Network on board and the converter. Its position
is determined depending on the length of the supplied cables and the unsupplied cables. See
p.34 and p.35.
To reduce the risks ofelectromagnetic interference,install the CCU as faraway as possible from
motors, generators, PODs or power cables.
Do not place the CCU in contact with a metal plate or compartment.
12.2 Position of the Command Panel
The Command Panel mustbe installed on the
steering station, close to the multifunctional
display, as shown.
The installation of the Command Panel
depends on the length ofthe cables supplied.
Install the Command Panel as close as
possible to the CCU.
12.3 Space taken by the Command Panel and the CCU
Respect the dimensions below for the installation ofthe Command Panel and of the CCU.
A 161mm
B 150mm minimum
C 150mm minimum
D 280mm
E 50mm minimum
F 80mm
G 150mm
H 80mm minimum
H
G
E
F
A
B
C D30
12.4 Mounting procedure of the Command Panel and of the CCU
1. Screw the CCU close to the
multifunctional display and to the
Command Panel. Use M5 screws
adapted for the mounting surface. See
p.12.
2. On the steering station, drill a suitable
cable entry space for the wiring of the
Command Panel using the drilling
blueprint available in the appendix p.44.
3. Wire the Command Panel and the CCU.
See p.41.
4. Once the wiring is done,seal around the
panel and screw holes. The product to
be used depends on the mounting
environment.
5. Screw the panel of the Command Panel.
Use M5 screws adapted for the
mounting surface. See p.12.
WARNING!
Ensure the wiring is correct before step 4.31
13. WIRING
The BlueSpin system is designed to operate with a nominal voltage of48V DC.The system is
supplied ready for wiring:
• On pre-existing components on board: see p.11.
• Between each component of the BlueSpin system.
The cables supplied are identified by a label or a color. See p.9 fora description of the cables
supplied.
BlueNav does not supply all the cables, connectors and terminators required for wiring the entire
BlueSpinsystem. This applies to items already owned by the customer oritems that require a
specific cable length because of the configuration of the boat. See p.12.
See the overall wiring diagram for a wiring overview (p.34 and p.35).
DANGER!
Always work with the power switched off and withsuitable electrical protectionequipment.
Use a correct size of cables, suitable for marine environments.32
13.1 Identification of the connectors of the Power Unit
To facilitate the wiring procedures of the Power Unit,see the identification table below.
The details regarding the cables not supplied are available at p.12.
N°
Name/color
of the
connector if
identified
Name or type
of cable
Wired to...
Detailed
procedure
1 ∅ DRV (supplied) Propulsion Unit p.36
2 ∅ SIG (supplied) Propulsion Unit p.36
3
∅
CAN Bus cable
(not supplied)
CCU
p.38
4
∅
PU Power
Supply
(supplied)
48/12V – 30A
Converter
p.37
5
∅
TEMP1
(supplied)
Propulsion Unit
p.36
6 +48V
bulkhead
connector
+48V power
cable (not
supplied)
Batteries
p.37
7
-0V bulkhead
connector
-0V power
cable (not
supplied)
Batteries
p.37
8 Yellow
bulkhead
connector
Yellowphase
motor cable
(supplied)
Propulsion Unit
p.36
9 Orange
bulkhead
connector
Orange phase
motor cable
(supplied)
Propulsion Unit
p.36
10
Red bulkhead
connector
Red phase
motor cable
(supplied)
Propulsion Unit
p.36
2
3 4
1
5
6
7
8
9
1033
13.2 CCU connectors identification
To facilitate the CCU wiring procedures, see the identification table below.
*Not used in single-motorsetup.
The details regarding the cables not supplied are available at p.12.
N°
Name/color
of the
connector
Name or
type of cable Wired to...
Detailed
procedure
1 NMEA
2000®
NMEA
2000® cable
(not supplied)
Backbone of the
NMEA 2000®
network on board
p.39
2 CAN PROP
CAN cable
(not supplied)
Power Unit p.38
3 Ethernet Ethernet
cable (not
supplied)
Multifunctional
Display (MFD)
p.40
4 POWER
SUPPLY
CCU Power
Supply
(supplied)
12V – 1Apower
supply onboard
p.41
5 REMOTE 1 Remote 1
(supplied)
Portside DC/DC
48/12V converter
p.40
6 REMOTE 2* Remote 2
(supplied)
Starboard
DC/DC48/12V
converter
p.40
7 Green
connector*
Green
“THR_R” cable
extension
(supplied)
Command Panel p.41
8 White
connector
White “THR_L”
cable
extension
(supplied)
Command Panel p.41
9 Blue
connector
Blue “VCU”
cable
harness
(supplied)
Command Panel p.41
1 2
3
4 5 6 7 8
934
13.3 Global wiring of the single-motor BlueSpin system35
13.4 Global wiring of the twin-motor BlueSpin system36
13.5 Wiring of the Power Unit / Propulsion Unit
The cables of the Propulsion Unit (2.5m
standard length) are supplied by BlueNav.
They are ready for wiring.
The location chosen for the mechanical
installation of the Propulsion Unit and Power
Unit mustallow the wiring as shown.
If the BlueSpin systemis a twin-motor
system, repeat the wiring procedure for the
second Propulsion Unit with the
corresponding Power Unit.
13.5.1 Temperature sensors wiring (TEMP1 and TEMP2)
The Propulsion Unit is equipped with 2 temperature sensor cables, TEMP1 and TEMP2. Each
sensor cable is delivered with its WEIPU connectorand its sensor tip.
Only the TEMP1 cable has to be connected. The TEMP2 cable is a spare cable.
13.5.2 Motor phase wiring (bulkhead connectors)
The wiring of the yellow, orange and red motorpower phases mustbe respected. It enables a
correct forward/reverse throttle direction.
The bulkhead connectors wiring is carried out with the following procedure:
1. Unscrew the truss head screw (M8xM16) on the corresponding bulkhead. Remove the
lockwasher.
2. Place the cable end flat on the plain washer.
3. Place the lockwasher flat on the cable end.
4. Screw the truss head screw (M8xM16) to fasten the assemblage using a 5mmAllen wrench
and a 20N⋅m torque.
5. Put one of the caps supplied on the bulkhead connector.
Propulsion Unit
DRV 12P
SIG 9P
TEMP1
TEMP2 (spare)
Cableharness
20N·m
Yellow phase
Orange phase
Red phase
WARNING!
If the BlueSpin system is a twin-motor system, eachPower Unit is identified “port side” and
“starboard”. Each Power Unit must be installed on board according to their position
identification. Each Power Unit is wired to its corresponding Propulsion Unit.
The starboard/portside position of a Propulsion Unit is determined by its wiring to a
starboard/portside Propulsion Unit.37
13.6 Power Unit / converter wiring
13.7 Power Unit / batteries wiring
13.7.1 Battery wiring (bulkhead connectors)
The bulkhead connectors wiring is carried out in the following procedure:
1. Unscrew the truss head screw (M8xM16) on the corresponding bulkhead. Remove the
lockwasher.
2. Place the cable end flat on the plain washer.
3. Place the lockwasher flat on the cable end.
DANGER!
To prevent overheating and a fire outbreak, the yellow, orange and red motorphase cables
must be wired to the bulkhead terminals inaccordance with the specified torque. The washers
must be flat.
The 3m “PU Power Supply”cable is
supplied by BlueNav.
The location chosen for the
mechanical installation ofthe Power
Unit mustallow the wiring to its
corresponding DC/DC 48V/12V – 30A
converter (see p.11).
Wire according to the diagram.
WARNING!
If the BlueSpin system is a twin-motor system, eachPower Unit is identified “port side” and
“starboard”. Each Power Unit must be installed on board according to their position
identification. Each Power Unit is wired to its corresponding Propulsion Unit.
Each Power Unit is wired to its corresponding converter.
The +48Vand -0Vpowercables for
connecting the batteries are not
supplied by BlueNav. See p.12.
The client must provide a sufficient
cable length,determined by the
mechanical installation ofthe batteries
and of the Power Unitin the boat.
Wire according to the diagram.
Power Supply
Power Unit
DC/DC 48/12V - 30A
Converter
20N·m
48V (+)
0V (-) Propulsion Batteries38
4. Screw the truss head screw (M8xM16) to fasten the assemblage using a 5mmAllen wrench
and a 20N⋅m torque.
5. Place one of the caps supplied on the bulkhead connector.
13.8 Wiring of the Power Unit / CCU (CAN PROPULSION network)
The wiring of the CCU and the Power Unit(s) result inthe creation of the CAN PROPULSION
network of the BlueSpin system.
13.8.1 CAN network definition
A CAN network is a communication serial network allowing several peripherals to exchange data.
Each peripheral, called a node, is connected
to a common path, called a backbone. The
backbone is composed oftwo wires, CANLow
and CAN High, that transmit signals of
differential voltage.120Ω terminations are
placed at the ends of the backbone to
stabilize the signal and transmit reliable data.
Together, they form a CAN network with a linear topology. This linear topologyenables simplified,
direct and high-performance communication.
13.8.2 CAN PROPULSION network specific to the BlueSpin system
The CAN PROPULSION network of the BlueSpinsystem connects the CCU and the Power Unit(s).
It is created during the installation of the BlueSpinsystem.
To create the CAN PROPULSION network of the BlueSpin system, the following components are
required:
CAN Bus 120 Ω female
termination
CAN Bus Cables
CAN Bus 120 Ω male
termination
CAN Bus T-connector
Noeud 1
CAN Low
CAN High
Rt = 120Ω
Noeud 2 Noeud 3
DANGER!
To prevent overheating and a fire outbreak, the battery power cables must be wired to the
bulkhead terminals in accordance with the specified torque. The washers must be flat.
WARNING!
The BlueSpin system is designed for48V DCbatteries wiring. Please see the battery
documentation for wiring, installation and charging specifications.
Figure 1.Linear topology of a CAN network.39
These components are not supplied by BlueNav. See p.12 for required quantities depending on a
twin-motor or single-motor setup.
The length of the CAN Bus cables depends on the mechanical installation and the distance
between the CCU and the Power Unit(s).
Connect the wiring according to the following diagram:
13.9 CCU / on-board NMEA 2000® network wiring
NMEA 2000® is a plug-and-play communication standard used to connect marine sensors and
display devices in boats. This standard applies to CAN bus networks (see p.38).The UCC of the
BlueSpinsystem connects to the backbone of the NMEA 2000® network of the boat toexchange
information.
F M
1
F M F
M
M
max 20 m max 10 m
max 0,5 m
M
M
F
2
M
M
max 0,5 m
F
M
max 0,5 m
F
WARNING!
The CAN PROPULSION network of the BlueSpinsystem relies on a CANbus protocol. This CAN
bus protocol must not be confused with the NMEA2000® CAN bus network of the boat.
The NMEA 2000® CAN bus network is used to transmit data betweendevices of different
types and from different manufacturers, such as GPS, compass, wind, depth,AIS, speed or motor
data. Itis set up prior to the BlueSpin systeminstallation. See p.39.
WARNING!
Each end of the CAN PROPULSION network backbone mustbe equipped with120Ω
terminators.
WARNING!
Do not confuse the CAN PROP and NMEA connectors on the CCU. The CAN PROP connector is
for wiring the CAN PROPULSION network of the BlueSpin system. The NMEA connector is for
wiring the NMEA 2000® CAN bus network (National Marine Electronics Association) of the boat.40
The NMEA 2000® cable is not supplied by BlueNav.It is used to connect the CCU to the NMEA
2000® network on board (see p.11). The client needs a cable length thatdoes not exceed 1m,
determined by the configuration of the NMEA2000® network on board.
Connect the CCU to the backbone of the NMEA 2000® network on board as shown in the
following diagram:
13.10 CCU / MFD wiring
The Ethernet cable is not supplied by BlueNav. Itis used to connect the CCUto the NMEA
2000® network on board (see p.11). For wiring, the client needs a cable lengthsuited to the
mechanical installation.
Connect the Ethernet cable on the Ethernet port ofthe CCU and on the Ethernet port of the
MFD as shown in the following diagram:
13.11 CCU / Converter wiring
The 6m “Remote 1” cable and “Remote 2” cable (in case of a twin-motor setup)are supplied by
BlueNav.
These cables are used to connect the CCU to the converter(s) onboard (see p.11).
See the converterdocumentation to carry out the wiring onits Remote on/off output,as shown in
the following diagrams:
NMEA 2000®
NMEA 2000® backbone on board
Ethernet
Multifunctional Display
WARNING!
Do not confuse the CAN PROP and NMEA connectors on the CCU. The CAN PROP connector is
for wiring the CAN PROPULSION network of the BlueSpin system. The NMEA connector is for
wiring the NMEA 2000® CAN bus network (National Marine Electronics Association) of the boat.41
CCU / converters wiring (twin-motor setup)
CCU / converter wiring (single-motorsetup)
13.12CCU / Power supply wiring
The 3m “CCU Power Supply” cable is supplied by BlueNav. It connects the CCU to the 12VDC
power supply on board (see p.11), as shownin the following diagram:
13.13CCU / Command Panel wiring
The VCU cable harness (marked blue) and the THR_L and THR_R extension cables (marked white
and green respectively) are supplied by BlueNav. Cables coming out of the VCU harness are
identified by labels.
Carry out the wiring according to the following diagrams and coloridentifications:
Remote 1
Remote 2
Remote 1
CCUPower Supply
12V DCPower Supply on board
WARNING!
The CCU is protected internally by a 1.5A fuse. Use the same fuse for the power supply on
board.42
Figure 2. CCU / Command Panel (twin-motor) wiring.
Figure 3. CCU / Command Panel (single-motor) wiring.
VCU
ON/OFF
DOCKING
ELEC M
BUZZER
KILLSWITCH - M
JOYSTICK
THR_L
THR_R
VCU
ON/OFF
DOCKING
ELEC M
JOYSTICK
THR_L
KILLSWITCH - M43
14. APPENDIXES
14.1 Well blueprint (Inhull Propulsion Unit)44
14.2 Drilling blueprint (Command Panel)45
[OCR, physical PDF page 1, not manually verified]
English version
Installation guide
BlueSpin 15kW electric motor
BlueSpin Inhull BlueSpin Outboard
BlueNav - 17 Quai du Capitaine Allégre, 33120 Arcachon - FRANCE - +33 (0)5 56 83 70 25 - contact@bluenav.com +» www.bluenav.com
[OCR, physical PDF page 45, not manually verified]
BLU NAV
\M\
Need help?
Get in touch!
Customer Support
support@bluenav.com
Sales Department
contact@bluenav.com
BlueNav - 17 Quai du Capitaine Allégre, 33120 Arcachon - FRANCE - +33 (0}5 56 83 70 25 - contact@bluenav.com + www.bluenav.com
Identifikace uložené verze