                                         SQAM- Rev. 00               |P a g e . 1




                     PLASTICS AND POLYMERS
                  SUPPLIER QUALITY MANUAL




Revision History:
Revision Date            Responsible        Description of changes
00          2021-10-29   David Maltais      First emission
                                                                        SQAM- Rev. 00                                                                 |P a g e . 2


Contents
1.   Purpose ............................................................................................................................................................3
2.   Application of this document .........................................................................................................................3
3.   Definitions, acronyms, and abbreviations......................................................................................................3
4.   Prices ................................................................................................................................................................3
5.   Raw Material Requirements .......................................................................................................................... 4
6.   Molds and Tooling .......................................................................................................................................... 4
7.   Part Marking ................................................................................................................................................... 4
8.   Quality Expectations .......................................................................................................................................5
9.   APQP and PPAP ...............................................................................................................................................5
                                            SQAM- Rev. 00                                      |P a g e . 3


1. Purpose
This manual aims to clarify the engineering, quality and product requirements to suppliers who are
supplying Taiga Motors Inc (“TAIGA”), with plastic or polymer components. In case of any questions,
please contact TAIGA Engineering or TAIGA purchasing departments.

2. Application of this document
This document is to be used in conjunction with other TAIGA documents. General Terms and
Conditions, Purchasing Agreement, Supply Contracts have precedence and must be followed. This
document is a complement to TAIGA’s Supplier Quality Assurance Manual and must be considered
as a supplement document.


3. Definitions, acronyms, and abbreviations
        ITEM                                            DESCRIPTION
SQAM                    Supplier Quality Assurance Manual
PPAP                    Production Part Approval Process
AIAG                    Automotive Industry Action Group
REACH                   Registration, Evaluation, Authorisation and Restriction of Chemicals
RoHS                    Restriction of Hazardous Substances Directive
IMDS                    The International Material Data System
MSDS                    Material Safety Data Sheet


4. Prices
TAIGA requires all quotes and pricing to be supported by a cost breakdown (For both the
component and tooling). Suppliers are expected to consider and quote the following before the
business is awarded:

   1.  Mold: Two or three plate mold, or any other type of mold.
   2.  Manifold system: Hot runner, cold runner etc.
   3.  Gate: Type of gates, number of gates, locations etc.
   4.  Mold flow: It is the cost responsibility of the supplier to run mold flow analysis. TAIGA will
       not be cost responsible in case the supplier has to run multiple rounds of analysis due to
       unsatisfactory results.
   5. Quality: The suppliers are expected to provide products of acceptable quality within the
       piece and tooling price quoted by them. If necessary, any costs required to achieve good
       quality will be quoted to TAIGA by the supplier before the business is awarded.
Suppliers are required to comply with Level 3 PPAP and annual PPAP submissions as outlined in
the TAIGA SQAM.
                                         SQAM- Rev. 00                                |P a g e . 4




5. Raw Material Requirements
  1. Resins from RTP, Dupont, Avient, Celanese, Covestro, BASF, Washington Penn or such
     similar, major, and well-known manufacturers will be used.
  2. The ratio of regrind must be below 20% for regular resins and 15% for glass fiber reinforced
     grades. The procedure must be compliant to the MATERIAL REGRIND PROCEDURE REV 01.
  3. Red Phosphorous and halogen-based flame retardants are not acceptable in any product
     supplied to TAIGA Motors Inc.
  4. All resins need to be REACH and ROHS compliant.
  5. IMDS submission will be made.
  6. MSDS will be provided during quoting and during PPAP.

6. Molds and Tooling
  1. Wherever TAIGA Motors Inc has paid for any equipment, including but not limited to molds,
     manifold systems, tools, gauges, jigs, fixtures, or such equipment, it is considered to be
     owned by TAIGA and will be identified as described in the SQAM.
  2. Any Equipment owned by TAIGA, as identified above, shall, under no circumstance be used
     for any purpose other than TAIGA’s needs.
  3. Once PPAP is complete, equipment or production will not move to any other facility
     without the written approval of TAIGA Supplier Quality Engineer.
  4. Any Equipment owned by TAIGA, as identified above shall be constructed with good quality
     materials and it is supplier’s responsibility (Including cost) to ensure warranty for the “life
     and volume of the program” as identified in the RFQ.
  5. Additionally, suppliers will be responsible for good maintenance and upkeep of the
     equipment. Service parts are to be considered.
  6. Visual evidence of all TAIGA owned equipment will be provided as a part of PPAP
     submission.
  7. Suppliers are expected to take ownership of the equipment design, verification (Including
     but not limited to tool dimensional reports) and manage cost and timing to ensure the
     equipment is commissioned and is production ready per the project milestone dates.
  8. First shots or First article inspection will be carried out and provided to TAIGA engineering.
     Suitable adjustments are expected to be done by suppliers to ensure the parts meet the
     requirements.

7. Part Marking
  1. Parts shall be marked according to SAE J1344 to designate the material.
  2. The Cavity number, the Part number and the Date code shall also be marked on the part.
     The physical marking code location, size, and process must be specified on the applicable
     part drawing.
  3. The physical marking must be by injection molding, embossing melt imprint, or other
     legible marking in the surface of the polymer, with the provision for future revisions
                                         SQAM- Rev. 00                                |P a g e . 5




8. Quality Expectations
  1. TAIGA Motors expects that all products and services provided meet or exceed the industry
     standards and specifications agreed to in Purchase Orders, Evaluation forms, Quotations,
     Drawings and Standards. Suppliers should clarify and document these requirements prior
     to the business award.

  2. For builds involving test vehicles, a full dimensional report, from a precise measurement
     method like CMM, for every cavity will be provided. Additionally, the manufacturing
     method, tools and materials that would be used for actual production, must be used for
     test builds. In case of any issues, suppliers are expected to get TAIGA Engineering approval
     before proceeding further.

  3. Additionally, all injection molding issues including but not limited to resin processing or the
     other manufacturing issues listed on the evaluation form is not permitted. Further, AIAG
     CQI-23 Special Process: Molding System Assessment can be used to maintain part quality.

  4. Suppliers are required to conduct 100% inspection and sorting of parts for a minimum of 1
     month or 1500 pcs whichever comes first, provided the entire period, or sorted quantity is
     defect free. This is called the monitoring period.

  5. All shipments will appropriately be labelled as per TAIGA’s specification: Supplier
     requirements – box labelling (SQLF-001 Rev 002). Regarding the part status, all the part’s
     label must also contain the following information:

         a. “100% Certified with Interim corrective action” in case defects had been identified
            earlier and product is in issue resolution period.
         b. “100% certified with Permanent corrective action” in case defects had been
            identified earlier and clean point is being established and product is in the
            monitoring period
  6. In case root cause analysis needs to be performed and external testing is involved, only
     accredited labs will be sourced to perform the test. All test data will be provided to TAIGA
     and maintained at the supplier location for the life of the program.

  7. At any stage of product development or during root cause analysis, TAIGA Engineering or
     quality team can request supporting data (Including but not limited to statistical studies,
     DOE, material analysis), suppliers are expected to cooperate.

9. APQP and PPAP
  1. TAIGA requires suppliers to follow and maintain the APQP and PPAP practices described in
     TAIGA SQAM.
     Minimum sample size required for statistical analysis is 30 pcs per cavity. The normal
     distribution of the data will be assessed first and then capability will evaluated. Minitab six
     pack capability report is preferred.
                           SQAM- Rev. 00   |P a g e . 6




Supplier Acknowledgement


Supplier Name:

Authorized Signature:

Date and Place:


[READING ORDER TEXT]
SQAM- Rev. 00 | P a g e . 1
PLASTICSANDPOLYMERS
SUPPLIERQUALITYMANUAL
Revision History:
Revision Date Responsible Description of changes
00 2021-10-29 David Maltais First emissionSQAM- Rev. 00 | P a g e . 2
Contents
1. Purpose............................................................................................................................................................3
2. Application of this document .........................................................................................................................3
3. Definitions, acronyms, and abbreviations......................................................................................................3
4. Prices................................................................................................................................................................3
5. Raw Material Requirements.......................................................................................................................... 4
6. Molds and Tooling.......................................................................................................................................... 4
7. Part Marking................................................................................................................................................... 4
8. Quality Expectations .......................................................................................................................................5
9. APQP and PPAP...............................................................................................................................................5SQAM- Rev. 00 | P a g e . 3
1. Purpose
This manual aims to clarify the engineering, quality and product requirements to suppliers who are
supplying Taiga Motors Inc (“TAIGA”), with plastic or polymer components. In case of any questions,
please contact TAIGA Engineering or TAIGA purchasing departments.
2. Application of this document
This document is to be used in conjunction with other TAIGA documents. General Terms and
Conditions, Purchasing Agreement, Supply Contracts have precedence and must be followed. This
document is a complement to TAIGA’s Supplier Quality Assurance Manual and must be considered
as a supplement document.
3. Definitions, acronyms, and abbreviations
ITEM DESCRIPTION
SQAM Supplier Quality Assurance Manual
PPAP Production Part Approval Process
AIAG Automotive Industry Action Group
REACH Registration, Evaluation, Authorisation and Restriction of Chemicals
RoHS Restriction of Hazardous Substances Directive
IMDS The International Material Data System
MSDS Material Safety Data Sheet
4. Prices
TAIGA requires all quotes and pricing to be supported by a cost breakdown (For both the
component and tooling). Suppliers are expected to consider and quote the following before the
business is awarded:
1. Mold: Two or three plate mold, or any other type of mold.
2. Manifold system: Hot runner, cold runner etc.
3. Gate: Type of gates, number of gates, locations etc.
4. Mold flow: It is the cost responsibility of the supplier to run mold flow analysis. TAIGA will
not be cost responsible in case the supplier has to run multiple rounds of analysis due to
unsatisfactory results.
5. Quality: The suppliers are expected to provide products of acceptable quality within the
piece and tooling price quoted by them. If necessary, any costs required to achieve good
quality will be quoted to TAIGA by the supplier before the business is awarded.
Suppliers are required to comply with Level 3 PPAP and annual PPAP submissions as outlined in
the TAIGA SQAM.SQAM- Rev. 00 | P a g e . 4
5. Raw Material Requirements
1. Resins from RTP, Dupont, Avient, Celanese, Covestro, BASF, Washington Penn or such
similar, major, and well-known manufacturers will be used.
2. The ratio of regrind must be below 20% for regular resins and 15% for glass fiber reinforced
grades. The procedure must be compliant to the MATERIAL REGRIND PROCEDURE REV 01.
3. Red Phosphorous and halogen-based flame retardants are not acceptable in any product
supplied to TAIGA Motors Inc.
4. All resins need to be REACH and ROHS compliant.
5. IMDS submission will be made.
6. MSDS will be provided during quoting and during PPAP.
6. Molds and Tooling
1. Wherever TAIGA Motors Inc has paid for any equipment, including but not limited to molds,
manifold systems, tools, gauges, jigs, fixtures, or such equipment, it is considered to be
owned by TAIGA and will be identified as described in the SQAM.
2. Any Equipment owned by TAIGA, as identified above, shall, under no circumstance be used
for any purpose other than TAIGA’s needs.
3. Once PPAP is complete, equipment or production will not move to any other facility
without the written approval of TAIGA Supplier Quality Engineer.
4. Any Equipment owned by TAIGA, as identified above shall be constructed with good quality
materials and it is supplier’s responsibility (Including cost) to ensure warranty for the “life
and volume of the program” as identified in the RFQ.
5. Additionally, suppliers will be responsible for good maintenance and upkeep of the
equipment. Service parts are to be considered.
6. Visual evidence of all TAIGA owned equipment will be provided as a part of PPAP
submission.
7. Suppliers are expected to take ownership of the equipment design, verification (Including
but not limited to tool dimensional reports) and manage cost and timing to ensure the
equipment is commissioned and is production ready per the project milestone dates.
8. First shots or First article inspection will be carried out and provided to TAIGA engineering.
Suitable adjustments are expected to be done by suppliers to ensure the parts meet the
requirements.
7. Part Marking
1. Parts shall be marked according to SAE J1344 to designate the material.
2. The Cavity number, the Part number and the Date code shall also be marked on the part.
The physical marking code location, size, and process must be specified on the applicable
part drawing.
3. The physical marking must be by injection molding, embossing melt imprint, or other
legible marking in the surface of the polymer, with the provision for future revisionsSQAM- Rev. 00 | P a g e . 5
8. Quality Expectations
1. TAIGA Motors expects that all products and services provided meet or exceed the industry
standards and specifications agreed to in Purchase Orders, Evaluation forms, Quotations,
Drawings and Standards. Suppliers should clarify and document these requirements prior
to the business award.
2. For builds involving test vehicles, a full dimensional report, from a precise measurement
method like CMM, for every cavity will be provided. Additionally, the manufacturing
method, tools and materials that would be used for actual production, must be used for
test builds. In case of any issues, suppliers are expected to get TAIGA Engineering approval
before proceeding further.
3. Additionally, all injection molding issues including but not limited to resin processing or the
other manufacturing issues listed on the evaluation form is not permitted. Further, AIAG
CQI-23 Special Process: Molding System Assessment can be used to maintain part quality.
4. Suppliers are required to conduct 100% inspection and sorting of parts for a minimum of 1
month or 1500 pcs whichever comes first, provided the entire period, or sorted quantity is
defect free. This is called the monitoring period.
5. All shipments will appropriately be labelled as per TAIGA’s specification: Supplier
requirements – box labelling (SQLF-001 Rev 002). Regarding the part status, all the part’s
label must also contain the following information:
a. “100% Certified with Interim corrective action” in case defects had been identified
earlier and product is in issue resolution period.
b. “100% certified with Permanent corrective action” in case defects had been
identified earlier and clean point is being established and product is in the
monitoring period
6. In case root cause analysis needs to be performed and external testing is involved, only
accredited labs will be sourced to perform the test. All test data will be provided to TAIGA
and maintained at the supplier location for the life of the program.
7. At any stage of product development or during root cause analysis, TAIGA Engineering or
quality team can request supporting data (Including but not limited to statistical studies,
DOE, material analysis), suppliers are expected to cooperate.
9. APQP and PPAP
1. TAIGA requires suppliers to follow and maintain the APQP and PPAP practices described in
TAIGA SQAM.
Minimum sample size required for statistical analysis is 30 pcs per cavity. The normal
distribution of the data will be assessed first and then capability will evaluated. Minitab six
pack capability report is preferred.SQAM- Rev. 00 | P a g e . 6
Supplier Acknowledgement
Supplier Name:
Authorized Signature:
Date and Place: