ZDROJOVÝ PODKLAD
Uložený text
https://www.afgrafico.com/wp-content/uploads/Revista-CT-INGENIEROS-web.pdf ↗ REISSUE
A PLACE WHERE
ENGINEERS LOVE TO WORK
December 2016
1 The CT Engineering Group
index
3
INDEX
EDITORIAL
Jesús Prieto: What sets CT
apart? 28 REPORT
AXTER´s Hybrid AX-40S plane.
4 REPORT More power, more safety
Three aeronautical achievements
at CT in 2016 30 SPORT SECTION
CT Ingenieros wins “Carrera
8 INTERVIEW de las Empresas” 6km race in
Diego Jiménez Madrid
9 REPORT 32 INTERVIEW
New Energies AT CT Javier Molina
12 INTERVIEW 34 SPORT SECTION
Philippe Santos Mission Accomplished: Guillermo
14 ANALYSIS Porrero completes Villacañas
Duathlon
Powerplant Integration in
Aircrafts 35 CORPORATE SOCIAL
16 OPINION COLUMN RESPONSIBILITY
CT employees commitment to
Vicente Egea: A comparative
differentiation. The role of a society
person in CT 36 RECOGNITION
18 INTERVIEW Jesús Prieto receives an award
from the Alumni Association
Francisco Marín
ETSII – UPM
20 INTERVIEW 37 RECOGNITION
Stanislas Choppin
CT Ingenieros ranked 50th on
22 REPORT the list of the top 100 “Best
Inside the design process of an Companies to Work” in Spain
automobile´s “CPU”
38 CORPORATE NEWS
24 R&D PROJECT CT Aerocomp becomes CT
Two years with Cre100do and Engineering group UK and opens
proud to be part of the program new office
26 R&D PROJECT 38 CORPORATE NEWS
Innovating the electrical starter/ CT Ingenieros signs its first
generator disconnection system nearshoring contract with ASAP
aircraft engines Engineering
27 R&D PROJECT 39 CORPORATE NEWS
DEFACTO – Additive CT is responsible for BIM models
Manufacturing Development for of the largest shopping mall in
Topological Components Andalusia
index The CT Engineering Group 2
EDITORIAL
WHAT
SETS CT
APART?
As we continue to become more relevant on the international engineering scene,
we need to understand what differentiates CT from other engineering companies.
Once we capture this I encourage you to internalize it, be proud of it and share it
with everyone.
When I look around me and think about what our organization is today I see moti-
vated, responsible, intelligent, and collaborative people that value long term rela-
tionships with everyone: customers, suppliers, colleagues as well the company
itself. I see a nurturing work environment that leaves a very positive impression on
visitors. I see a shared vision, mission and set of values that make up the corner-
stone of our corporate culture. Finally, I see a solid base of engineering know-how
and a very professional approach to business with a constant drive to deliver on
our promises and surpass customer expectations.
JESÚS PRIETO But, is this all my imagination? Is this how others also perceive CT? Is this the
President & CEO reality? Is this how employees in other Spanish offices, in France, Germany or the
UK perceive CT? Is this how our customers and subcontractors see us? Is this
how society in general thinks of us? Well, we better find out. Even if this were true
in a large part of the organization we need to see how we can permeate other
parts, even countries, where this might not be completely true. All of this must
also be transferable to the new companies that become a part of CT in the near
future so they too can participate in our joint strategy and goals.
To find out, we have launched a “branding project”. Over the next couple of
months, this project will help us bring to light the positive “intangibles” embedded
in our culture; things that we take for granted and must be recognized and made
tangible. These are precisely the things that set us apart from our competitors.
Once we understand the essence of our competitive advantage we will be able to
better communicate it to each of our stakeholders: customers, subcontractors,
and society in general. Most importantly, this effort will allow each of us to under-
stand these key value-adds, internalize them, be proud of them and reverberate
them with everyone. I want to thank each of you for joining us in this attempt to
capture what makes us special, and, most importantly, for what you do each day
to help set CT apart.
3 The CT Engineering Group
index
The aeronautical business units continue
to grow. Our strategic goals include
obtaining excellent results, consolidating
our position in the sector, and keeping
ourselves at the cutting edge. This
year continues to be a great year for
aeronautical activity at CT. Among the
milestones, The CT Engineering Group
consolidated its relationship with Airbus
Group thanks to the renewal of its
qualification as an Engineering Supplier
Strategy (E2S). Earlier this year, another
milestone was achieved when Airbus
Defence & Space Engineers informed CT
of the awarding of MultiCo, a contract
to provide engineering services for the
Airbus division. Finally, CT extended the
technical signature delegation to all
Airbus Group. These three achievements
have been added to CT´s curriculum,
which also includes its qualification as
Manufacturing Engineering Services
Strategic Suppliers (ME3S) for Airbus
THREE
achieved in 2014.
AERONAUTICAL
ACHIEVEMENTS
index
AT CT IN 2016
The CT Engineering Group 4
1
REPORT
ENGINEERING
STRATEGY which allowed us to work with all compa-
nies within Airbus Group.
SUPPLIER (E2S) The tasks of The CT Engineering Group are
not limited to the design phase. Our work
also encompasses the manufacturing pro-
cesses and helps to design the product
In May, Airbus Group renewed the rating of The CT Engineering manufacturing strategy. We also perform
Group as Engineering Strategy Supplier (E2S). The evaluation engineering activities in the post-produc-
process measured, among other categories, positioning, busi- tion phase: such as certification, support
ness strategy, rate of quality of projects and services as well as or documentation of the after-sales of the
KPI’s. The result was very satisfying for CT. Airbus Group told product. The E2S rating allows us to be
us that CT is located within the top five. involved in all product stages, giving us
CT excelled in the evaluation carried out by the Airbus Group insight into product design and helping
steering committee (Airbus, Airbus Defence & Space and Air- us to offer solutions that can provide sub-
bus Helicopters). Among our strengths was our team of indi- stantial improvements across the product
viduals that surpassed customer expectations by providing life cycle.
quality and timely services at a good price and with interna- CT’s re-appointment as an E2S preferred
tional presence. supplier demonstrates the success of our
This rating allows us to be part of a select worldwide club as consistent strategy of providing timely
engineering supplier for Airbus Group strategy. Airbus Group quality services. CT is a transnational pro-
granted just 17 global licenses and The CT Engineering Group vider for Airbus Group and our work covers
has one. a broad range of engineering services uti-
lizing flexibility and technical capacity.
This milestone consolidates the strategy of the company to
be present in all areas of engineering, from analysis require-
ments and product design, through engineering production to
after sales support and maintenance. Among the wide range
of services included in the three-year contract (2016-2018)
are: mechanical design and airframe, powerplant integration,
system engineering, manufacturing engineering, data config-
uration, supportability, GSE, engineering support and service
bulletins.
CT remains one of the leading companies for the provision of This milestone
engineering services in areas related to the definition, devel-
opment and post-sales support for all products of the Airbus
consolidates the
Group. This contract will allow the company to consolidate a strategy of the
strong team of professionals and will put The CT Engineering
Group in a position of great responsibility in the aeronautics, company to be
space and defense sector of the engineering business. A signif-
icant workload is expected in the next three years. present in all areas
The CT Engineering Group and its national brands (CT Ingenier- of engineering
os, CT Ingenierie, CT Ingeneure, and CT Engineering Group UK)
continue providing industrial services and structural engineer-
ing design services.
CT understands the product in its entirety and has been working
with this philosophy to help consolidate a business relationship
with Airbus. Since 1998, CT has been contributing engineering
services to Airbus in its flagship aircraft programs, including
work on the A320, A380, A330MRTT, A350 and A400M. CT
was selected for the first time as an E2S company in 2008,
5 The CT Engineering Group
index
2
MultiCo
Earlier this year, Airbus Defence and Space commu-
nicated with CT about awarding them the MultiCo.
This contract to provide engineering services for Air-
bus Defence and Space is valid for three years and
would ensure an increased workload for CT. In addi-
170 fellow
tion, it becomes an essential way in for the awarding employees of
of the MultiCo in Germany.
The three-year contract (March 1, 2016 - February 28, CT Ingenieros
2019) covers the outsourcing of various tasks from
30 different departments in Airbus.
are working on
For this reason, the MultiCo contract has a large projects derived
reach and gathers a large volume of work that touch-
es virtually all areas of engineering that make the
from MultiCo
development process of an aircraft. This ranges from
mechanical areas such as structural design, stress
or flight physics to the other related aspects in the
field of software and mission systems, flight tests or
simulation systems.
It has been a long process. CT Ingenieros began
working on it the summer of 2015 with the publica- Space defines a Work Unit called ‘Completion of Ele-
tion of its tender offer. In September of that same ment Manufacturing Diagram’ in which the work unit
year CT delivered the offer. A document preceded by describes the type of parts to document, the delivera-
numerous meetings, presentations and negotiations. bles and the associated deadlines. “CT would assess
In February 2016, CT Ingenieros received official noti- this Work Unit at, for example, 100 Euros. From here,
fication of the award by Airbus Defence and Space. once CT has been selected as a supplier, Airbus
Pedro Pérez, Business Unit Manager for Systems Defence and Space could ask for 10 of the previ-
Engineering, says that this process included the ously defined work units and we would elaborate 10
involvement and collaboration of various Business plans for which they would pay us a total of 1,000 €,”
Units (Stress, Design, Engineering [in Madrid]) and of explains Pedro Pérez.
the 11 providers who are part of what has been called In the MultiCo contract there are a total of 30 cost
‘The CT Engineering Consortium.’ All of them were led centers involved and CT Ingenieros has been select-
by Business Units from Systems Engineering. ed to work in 18 of them. Each cost center has a
The project involves the provision of engineering ser- distinct amount of workloads. Therefore, “in reality
vices in the form of Work Units. A Fixed Price Unit CT Ingenieros is enabled to work in more than 80%
(FPU) or Work Unit is the predefined work that is of the overall work since we have been selected in 9
evaluated by our client. In this case, Airbus Defence of the 10 largest cost centers,” says Pedro*.
and Space described in each Work Unit every job to This contract is important for CT as it represents an
develop and deliverables associated with it. CT Inge- important part of the workload for Systems Analysis
nieros, meanwhile, gives a fixed price for each Work at The CT Engineering Group. “Additionally, it consoli-
Unit defined and with this price a catalog of activities dates us as one of the two largest companies in this
is generated that Airbus Defence and Space will use type of global work for Airbus D&S in Spain and con-
throughout the three-year contract. veniently positions us to face the German MultiCo”,
To illustrate this project, imagine Airbus Defence & comments Pedro, adding that “when Airbus Defence
*Cost centers in which CT has been selected
Product and Flight Safety Systems Labs Structural Analysis
CAD Methods, Processes and Tools Mission Systems COMMS Systems Integration
Avionics and Electrics Flight Tests and Operations Mission Support Systems
Air to Air Refueling Aircraft Development Flight Tests CLAEX Support
Flight Physics Aircraft Acceptance and Delivery UAS Ground Station and Avionics Systems
Systems Support Structures Design Simulation Systems
index The CT Engineering Group 6
3
and Space needs a job completed, depending on the
type of work required, this is assigned to CT Ingenieros
or any other company in the consortium according to
certain criteria of availability, technical suitability, etc.
Once the work is completed, CT Ingenieros invoices
customer Work Units corresponding to the contracted
amount and we pay our partners accordingly.”
CT Ingenieure has been selected for MultiCo in Airbus
Defence and Space Germany in three specifications. As
of now The CT Engineering Group is the preferred sup-
TECHNICAL
plier for engineering services in Germany in the scope
of military and combat aircrafts. “This selection repre-
SIGNATURE
sents a new step in the development of the CT Group in
Germany and will give us the opportunity to consolidate
DELEGATION
our presence in Airbus Defence and Space”, points out
Francisco Marín, Country Manager in Germany and Key Technical signature delegation is a very impor-
Account Manager for Airbus. tant strategic step. Signature Delegation was
170 fellow employees of CT Ingenieros are working on a mandatory requirement to be kept within the
projects derived from MultiCo. These activities are con- short group of E2S strategic suppliers for Air-
ducted under the supervision of Miguel Montoya, who bus. During the TDCA (Technical Development
has been appointed project manager. The work gathers Capability Assessment), that started back in July
together highly diverse areas of engineering. For this rea- 2015, several Departments and Business Units
son, CT Ingenieros is responsible for leading a consorti- worked closely together resulting in the effective
um (The CT Engineering Consortium) in which two stra- Signature Delegation in some WP (work packag-
tegic partners participate (Centum and Temai Engineers) es) from Systems Engineering.
as well as nine specialist companies (Accenture, C-ITD, In parallel, we have caught the eye of Airbus and
DIP, Defensya, GMV, ICEMM involved, Orbital, SERTEC were granted with a Signature Delegation in oth-
and Theralabs). er areas, like Design and Stress. With this, The
The work derived from MultiCo is predominantly based CT Engineering Group gains both independence
at Airbus Defence and Space in Getafe although there and responsibility, since we are now allowed to
are also tasks performed in Seville (approximately 2% of issue and check technical contents on behalf of
the work). “However, the trips are all very common in this Airbus. This delegation is solid evidence that our
type of activity, we have engineers continuously traveling organization is robust, reliable and transnational,
to different sites of Airbus in Europe (Toulouse, Hamburg, fulfilling all international standards and require-
Munich, Bristol) and other locations in client countries or ments.
those made flight test campaigns,” Pedro affirms.
In short, the MultiCo strengthens the position of The CT
Engineering Group as a supplier of engineering services
for Airbus Defence and Space.
7 The CT Engineering Group
index
INTERVIEW
DIEGO
Finance & Strategy Manager
in The CT Engineering Group
JIMÉNEZ
Tell us who you are? agement. I have audited various industries
I am Diego Jiménez, and I joined including companies such as PSA Peugeot,
CT Engineering Group in April Aciturri, Bosch, and more.
2016. Further to my position After five years working at PWC, I was asked
as Internal Auditor, where I to join General Dynamics, the world’s third
perform auditing tasks for CT largest multinational conglomerate in the
Engineering and CT Solutions; Defense Industry. I was a Senior Business
I am actively involved with the Analyst and the right hand of the CFO for five
harmonization of Accounting years, the last of which I was selected to
and Financials in the various join the “high potentials” talent development
countries where we operate. Finan- program. While at GD; I was responsible of
cial Strategy has become also part controlling and reporting key financial met-
of my objective. My job is to give the rics at the European Headquarters, located
Advisory Board an overall view of the in Madrid, to the USA where the Corporate
economic situation of the CT groups. Headquarters are located.
What do you do? What is your background and education?
With my experience in the field, I gen- Born and raised in Madrid, I am married to
erate a periodic analysis report of key Gadea and we have a one-year-old daughter
financial indicators showing underes- named Olivia. For the last eight years, Gadea
timated opportunities of improvement, has worked at Manos Unidas, a worldwide
and the areas of risk NGO, managing development projects pri-
that might jeopardize marily in Asia and Africa.
the performance of While I was in High School, I had the chance
the group. to live abroad–one year in Dublin and one
I help to manage risks year in Cleveland, Ohio. Later I studied
and to control certain Finance Administration at Carlos III Univer-
non-financial process- sity in Getafe. After several years working,
My job is to es in order to ensure
that all issues affect-
I completed an Executive MBA at IESE Busi-
ness School, which gave me a perspective of
provide the ing the survival and how companies and their individuals behave
Advisory Board prosperity of the com-
panies are taken into
from a management point of view.
Someone has told us that you are
account. I provide the
of the economic Board, and other inter-
nature lover, is that right?
I am passionate about the countryside, and
situation at ested parties, with
every weekend available I like to go there
the evidence that the
with my family, breathe in the fresh air, and
the company business is managed
escape from the traffic jams and the busy
effectively.
city life. This is how I press the “restart but-
What did you do ton” and am able to start Monday full of
before joining The CT Engineering Group? energy.
After several internships in consulting com- I am overwhelmed by how the CT family has
panies and banks, I started working for PWC, welcomed me, so I can only hope to give
one of the “Big Four” auditing and consulting back to this new family as soon as possi-
companies in September 2007. There, I had ble. To do that, I will work hard and with a
the chance to understand how companies team spirit in order to be integrated into
perform, from the ground level up to man- this great family.
index The CT Engineering Group 8
REPORT
NEW
ENERGIES
AT CT
The CT Engineering Group continues to expand its
range of services with the opening of the Electrical
Engineering Business Unit in April 2015. This team will
develop electrical engineering projects and aims to
provide internal services to other business units in all
things related to electrical engineering.
They made their entrance into The CT Engineering Group as a group determined to
continue providing electrical engineering services of the highest quality. They immedi-
atley fitted into the work climate and brought with them a repertoire of good practices
for the company. “The stability and security at CT gave us a good impression because
we only had to worry about working,” said Asier Gutiérrez, Business Unit Manager.
The group also brought with it a portfolio of clients who rely on their services. Their
experience and mutual understanding makes the team work like clockwork:
engineering services completed in proper time and with excellent quality
to meet customer needs and gain their trust.
Since then, the Electrical Engineering Business Unit has been con-
solidating projects in the electricity sector, both in the transmission
and distribution market as well as in power generation. Many of the
projects the business unit is involved in are turnkey projects. The basic
engineering is done from the beginning of the project to its final instal-
lation. “One of our services that differentiates us from the rest of the
business units is our project commissioning. That is, our BU employees
working in facilities around the world,” says Asier.
One of our services that differentiates
us from the rest of the business
units is our project commissioning
9 The CT Engineering Group
index
have incorporated the handling
of the latest CAD / CAM technol-
ogy that allows them to optimize
The Electrical Engineer- working time and be more effi-
ing Unit has the ability cient. “Our main goal is to make
to perform complete pro- our customers more competitive
jects, both nationally and because our engineering work is
internationally, including oriented toward increasing our cli-
engineering design, instal- ent´s efficiency and allowing them
lation, design manufac- to differentiate themselves from
turing of electrical enclo- their competitors,” says Asier.
sures and commissioning
of high voltage (HV) and Our main goal From CT´s office in Getafe, the
base of its operations, its portfo-
medium voltage (MV) elec-
trical substations. These
is to make our lio of clients and projects increas-
es. Ongoing projects such as ITER
facilities may be either customers more and ST Wikinger are already part
Air Insulated Substation of its customer base of engineer-
(AIS) as Gas Insulated competitive ing services. In an initial phase
Substation (GIS). “The is a project with Tesla Motors,
difference is that the AIS an American company of 100%
components are uncovered and outdoors electric cars. “We will participate in the engineering design of
as opposed to the GIS components which the transformer and electrical connections for the Tesla super-
are within tubes that contain a sulfur charger,” Asier commented.
hexafluoride (SF6) gas which allows the The team´s functionality allows them to establish collabora-
distance between the components to be tions with the BU Industrial Plant team, who emerged the first
shorter because the gas functions as collaboration in a petrochemical project, and make offers with
insulator and the substation is more com- the other teams, for instance the team in Bilbao, led by Diego
pact,” explains Asier. Pacheco, and with the Architecture, Engineering and Construc-
The Unit´s portfolio also includes engi- tion BU led by Éber Rueda. “We want to establish synergies
neering services for the sector of renew- with other units in everything related to electrical engineering:
able energy such as hydroelectric plants, electrical instrumentation, manufacturing of electrical enclo-
as well as for high power services, such sures in other projects, calculations of consumption, etc.,”
as mini power plants and offshore wind states Asier. The electrical engineering team allows The CT
farms. Engineering Group to expand their catalog of engineering ser-
The Wikinger offshore windfarm is being vices and enhance our competitiveness in technical offers.
developed by Iberdrola in the Baltic Sea. Recently, Joan and David Piedrafita have joined the team,
CT Ingenieros has participated in the con- which will allow us to participate in projects for alternators
struction of substations to monitor the and engines. One of their strengths is the manufacturing of
installation and commissioning made excitation systems. These final products require a high degree
Navantia shipyard in Cádiz (Spain). This of R&D to achieve a high performance at a lower cost.
first phase ended in July and since Sep- The next steps for the BU are to focus on identifying new mar-
tember they have been working on the ket niches with customers and collaborate with them to meet
commissioning of the Wikinger offshore new needs. For instance, they have considered remote control
windfarm in Germany, where Carlos de engineering in renewable energy. What is clear, however, is
Castro is now stationed. that this “energy” will acquire an orange and white tint, indicat-
The Electrical Engineering BU shares with ing that this will stay lit for a long time.
other business units of The CT Engineer-
ing Group their commitment to innovation
and adaptability. In their daily work they
index The CT Engineering Group 10
ITER: THE
BIGGEST
FUSION
REACTOR IN
HISTORY
ITER is one of the most ambitious energy projects in the world today. It
will be the first fusion device to maintain fusion for long periods of time
and to test the integrated technologies, materials, physics regimes nec-
essary for the commercial production of fusion-based electricity. ITER
(the Latin word for the way) is currently under construction in the south
of France. Seven members support this international project: China, the
European Union, India, Japan, Korea, Russia and the United States. They
have pooled their financial and scientific resources to build the biggest
fusion reactor in history. ITER will not produce electricity, but it will resolve
critical scientific and technical issues in order to take fusion to the point
where industrial applications can be designed.
Since July 2015, the Electrical Engineering Business Unit has been work-
ing with Siemens and Ferrovial on the ITER Project (180-hectare site in
Saint Paul-lez-Durance, southern France).
The CT Engineering Group started doing the supervision of the existing
engineering on the 400 kV and 22 kV pannels of the American part man-
ufactured by Siemens and received by ITER to install them in their substa-
tions. Ferrovial is in charge of the integration jobs and reports to Siemens
Spain for the revision of the pannels. The CT Engineering Group is the
supplier of the study. Ferrovial later expanded the work of Siemens/CT to
examine the 6.6 kV pannels of the American part (PBS43). “Our thorough-
ness in our work has allowed us to establish ourselves and get better a
position than other companies that have been working longer for ITER,”
says Raúl López Seva, engineer and head of the ITER project. In fact,
ITER congratulated The CT Engineering Group for the quality of their work.
This project has opened new doors and has allowed Ferrovial/Siemens
to return to commission new jobs. The team has increased their scope
and they are now working on the complete integration of all the different
parts (400 kV, 66 kV and 6.6kV) for the other big substations of the ITER
project: the Chinese part (PBS41).
11 The CT Engineering Group
index
INTERVIEW
Business Manager for Manufacturing
Engineering in France
PHILIPPE
SANTOS
Born and raised in Paris, Philippe
Santos, Business Manager for
Manufacturing Engineering in France,
wanted to discover other world,
emulating the adventurous spirit of his
parents who embarked on a journey
from Galicia to Paris during the 1950s.
He has worked in France, Spain and
Morocco where he made many new
friends that he is proud to still keep in
contact with today. With a keen interest
in communication, he sat down with CT
Magazine for a quick interview. While
being quizzed, he told us of his job as
an editor of an internal magazine “Good
News”, which shares news updates
within their Business Unit.
index The CT Engineering Group 12
INTERVIEW
of various offices (Ales, Toulouse,
Lyon, Paris) who worked for cli-
ents such as Siemens, IRISBus,
MGI, Delphi, Renault VI, SNCF,
RENAULT Trucks, VISTEAO, Meca-
Plast etc….
I wanted to involve myself in aer-
onautical production and I left
How did you get involved in CT Ingenierie?
for GECI where I worked for 18
In 2012 I opened my consultancy company. Before that, I worked in
months as a manager for Madrid,
Madrid and met many businessmen; among them were Jesús Prieto y
Toulouse and Marseille. I was
Vicente Egea. Later, they got in contact with me to discuss how to devel-
also in charge of the business
op the business fur-
strategy in France. I spent a lot
ther from their loca-
of time on the airplane and I left
tion in Toulouse.
when ALTEN bought GECI.
For two years I was
a consultant in con- Why this change towards
tact with Vicente manufacturing engineering?
and with Francisco I like very much to see the prod-
Marín (Curro). In uct and how it is manufactured.
this period we got The process is much more con-
the accreditation
to work with Airbus I like manufacturing crete and closer to reality. You
can touch and smell the product,
Helicopters in Mar- although it smells like oil!
seille. After getting engineering because
Why did you decide to study
accredited
ME3S, they asked
with
it is the stage where electrotechnical engineering?
I really like to draw. When I was
me to form part you can touch and young I would take paper and
of the staff and I
assumed respon- smell the product imagine things. When I started
to study technology, things were
sibility as a manu-
very undeveloped, so I liked to
facturing engineer
imagine what I could create with
in France. I liked the mentality and the personal treatment from Jesús,
electrical equipment to take infor-
Vicente, Curro, Ignacio López, Cristina Raso, Pedro Pérez, Ana López,…
mation from one point to another
So I accepted the offer and began working for CT in July 2014.
in an airplane.
After more than two years now, how is the experience going?
What hobbies or interests
It is very intense and there is a lot of work. We opened Nantes and
do you have?
new businesses in Toulouse. But I undoubtedly appreciate the trust and
The first is playing rock guitar.
autonomy that the people at The CT Engineering Group give to us. This
Twice a month I play concerts
is what CT does differently from other companies. Here, we work based
and we need to rehearse as well.
on trust, and that translates into happiness and excitement.
The second is playing tennis, or
What was your introduction into the working world? at least trying to. I like to exer-
I started working in Paris at a company called Labinal (Safran), working cise. And lastly, I like to get on my
on a harness for motors in airplanes, cars and tanks. After that I was in motor bike and go with my wife to
Dassault and in Assystem as a manager for the electrical engineering the Pyrenees on the weekends.
department in France for 12 years. In 2000, Assystem, together with And of course, my family and
Snecma (a company that manufactures airplane motors), were looking friends are very important to me.
for a General Manager to open their first office of aeronautical studies For work reasons I have traveled a
in Morocco. I accepted and left to Casablanca for four years to work lot and it has allowed me to have
on everything related to airplane compressors. Upon finishing my work many friends. I am delighted that
there I had a team of 80 engineers and technicians. my house can be a meeting place
After four years enjoying the great climate, I returned to Paris and thought where my friends from France and
that it was the moment to change company. I left to become a managing Spain can come.
director for the south of France (Bordeaux, Toulouse, Cannes and Mar-
seille) in Akka Technologies, and with my family we settled in Toulouse.
This adventure lasted only three years because I did not like the way
they worked. Later on, I took 18 months to help a friend who was presi-
dent of ASTEK that took over the presidency of ASTEK Mecatrocique and
13 The CT Engineering Group
index
ANALYSIS
POWERPLANT
Andrei Andrei
& Miguel Montoya
INTEGRATION IN
AIRCRAFTS
Since 2011, The CT Engineering Group has been a major supplier for
Airbus for the integration of powerplants into aircrafts; both the propulsion
system integration and the auxiliary power unit (APU) integration.
These activities are carried out predominantly in Toulouse and in Getafe
by a team of more than 50 engineers, most of them members of The
CT Engineering Group family for many years. Our experts are involved in
the development of new aircrafts as well as the continuous support of
in-service aircrafts.
Support for all the components of the powerplant
The technical studies realized by our teams provide solutions for all the
types of problems related to the physical and functional integration of
powerplant systems in all aircraft interfaces.
The studies for propulsion system integration concern: the engine, the
nacelle, the engine controls and all the systems around the engine
(reverse system, oil system, fuel system,…).
The studies for APU system integration concern: Auxiliary Power Unit
turbomachinery, all the Auxiliary Power Systems components (control-
lers, air intake, starter generator…) and the APS controls.
Studies during all the life cycle of aircraft program
The CT teams support the Airbus by integrating the Powerplant systems
in an aircraft during the entire development phase, support studies
related to the continuous support and the continuous development and
realize technical research studies for new engines.
During the development phase of a new engine our teams ensure the
requirement definitions, specifications, design, development, test defi-
nition and follow-up, certification and industrial ramp-up until series
maturity of the products and their associated components.
In the frame of the continuous support our teams provide answers to
the operators requests, analysis of the encountered problems, identi-
fication of potential solutions to correct in service problems (such as
repairs, interchangeability, technical adaptations, etc.) and other activ-
ities related to continuous airworthiness of the fleet.
In the life of the aircraft, the products and their associated components
evolve due to diverse product improvements requiring a modification.
This is the scope of the continuous development activities of our teams.
The CT Engineering Group experts are involved in several R&D activities
to provide innovative solutions for new engines and new APUs.
index The CT Engineering Group 14
Support for all the aircrafts produced by our customer
The CT Engineering team have made an important contribution to the powerplant
integration during the development phase on all the aircraft developed by our cus-
tomer over the few last years: A320neo (for the two new engines: one from Pratt
& Whitney and the second one from CFM), A330neo, A350 (for the two versions
A350-900 and A350-1000), A400M.
Our activities related to the continuous support and the continuous development
concerned all the aircrafts in use. The R&D activities concerned all the new engines
and all the new solutions for system and components in the powerplant scope.
A teamwork success for a transnational project
This project is a very good example of how synergies and working in close collab-
oration within The CT Engineering Group leads to success. Systems Engineering
BU in Getafe and Systems Engineering BU in Toulouse have worked together on
this project from the beginning and continue working together efficiently.
When these activities started in Toulouse, the French
team had no real expertise in the scope of the pro-
ject. The Spanish managers helped the French team
from the beginning. Spanish engineers, experts in
Powerplant specific scopes trained and worked with
the French engineers to find solutions to the technical
problems and challenges of the new activities. Some
of the Spanish experts that helped the French team to
start are still members of the French Powerplant team.
Talent and expertise of each engineer in our team pro-
These activities vided solutions for many technical problems. Teamwork
and collaboration was the key of our success: The CT
are carried out Engineering Group contract with Airbus in the Power-
plant scope has been renewed until end of 2018!
predominantly in
Toulouse and in Getafe
by a team of more
than 50 engineers
15 The CT Engineering Group
index
OPINION COLUMN
Vicente Egea,
General Manager
A COMPARATIVE
DIFFERENTIATION.
THE ROLE OF A
PERSON IN CT
Vicente Egea, CT’s General Manager, looks at the
challenges and solutions as to what allows the company
to set itself apart from other companies in the sector in an
increasingly competitive market.
index The TC Engineering Group 16
The world around us is boiling. Once someone comes up with an innovative idea and launches it to
the market, hundreds of companies soon appear offering similar or even improved products. Differ-
entiating ourselves from the competition is becoming increasingly difficult.
In this environment, more and more companies choose to differentiate themselves not so much in
what they do but how they do it. There are very few companies with the ability to maintain an inno-
vative product or service for a long period of time that differentiates them from their competition.
However, copying the way that companies provide their product or service to market is not so easy.
And this is a significant competitive advantage that customers appreciate.
For us in CT this trend is not new. In fact, most of our history has been linked to markets where the
differentiation between us has not been in what type of services we provide. If you compare the port-
folio of services we offer with those our competitors do, you will see what I mean. There are no major
differences. Therefore, since our beginnings, we have tried to compete
by differentiating how we offer these services. The result is that CT has
a certain character that our customers and people who work for us here S
ince our inception ,
recognize as our own. we have tried to
These are the traits with which we have managed to differentiate our-
selves from our direct competitors. For example, our customers appreci- compete by differen -
ate that CT employees remain with the company for a long time. When we tiating how we of -
go to a client to provide a service and do a good job, they rely on us for
the next one. More often than not, they ask us if the employee still works fer these services .
here and in many cases find an affirmative answer. Once we know what
the client values - in this case employee longevity - we implement operational processes that make
sure this is achieved. We always try to take care of people who work with us with concrete and various
measures to help them. Examples of this include flexibility in scheduling, work environment, transpar-
ent information and fair treatment.
Managing to differentiate a company in the how is just as difficult as managing to differentiate a
company in the what, because the way to achieve both of these goals relies on both the company
procedure and the people involved. That is why people are essential in this scheme. No matter how
well established the procedures are, if the person who is carrying them out for client does not do it
properly (understanding properly as representing the sum total of all the attitudes and values of the
company that the customer appreciates), it becomes impossible to effectively differentiate ourselves
in the how. The sum of people and processes is therefore the key to effective differentiation.
Consider another example. Another attitude highly valued by our customers is that we are a pleasant
company to work with. If the customer needs something, we adapt. We try not to create conflict or
customer problems. We work in anticipation of our client’s needs and make life easier for the client.
Can we aspire to differentiate even further? Of course. But this requires that people in contact with the
customer, from the General Manager, through the Project Manager and Engineer or Technician involved
in the project, have this attitude of helpfulness, flexibility and willingness to iron out conflicts that may
arise. In short, to propose solutions and to foresee and mitigate the problems that will may arise.
The next question is how to get people to adopt this behavior? Not one, not 50%, but the vast
majority. Therein lies the real difficulty in how to differentiate the company –having the vast majority
of employees behaving like a single individual. Although
there are no magic recipes, the first thing to do is to
communicate very clearly what those behaviors are that
we ask of our employees, making it clear that it is impor-
tant for the success of the company. In addition, we
must develop internal procedures that are in line with
our intended goals. An example of this is our personality
test that helps us select people who have a natural incli-
The sum of people nation to help others.
Finally, it is essential to keep all this in mind on a daily
and processes basis. This applies to new employees and as well as to
the rest of us, since this is the only way for customers to
is therefore the perceive us as different and therefore ensure their loyal-
key to effective ty in the future. So to all of you and myself included, this
article is a reminder for us to maintain the values that we
differentiation. should hold as a company.
17 The CT Engineering Group
index
Work hard,
be trustworthy
and delegate
are the key
strategies
Country Manager of CT Ingenieure in Munich
FRANCISCO
MARÍN
After several years working in France, Francisco
Marín moved to Munich to become Country
Manager of CT Ingenieure. His main goal is to build “When I started working for CT I
our name in the country, working together with site didn´t know what I was going to
managers to reach a critical mass of people and do”. It was April 1998, and Fran-
cisco Marín, who we know as
businesses in the coming years. Curro, had started working on
numerous projects. In a calm and
a steady tone, he recalls the challenges he overcame after crossing the Pyrenees to
launch CT Ingenierie.
In June this year he relocated to Germany as Country Manager for CT Ingenieure. 18
years after joining CT, his statement “I didn´t know what I was going to do” had under-
gone a metamorphosis and had become an important part of the international growth
of The CT Engineering Group. Curro talks to CT Magazine from his office in Munich.
What are the next steps for CT Ingenieure?
Most importantly, the next steps will be trying to coordinate our efforts and establish
priorities for organic development as well as for possible acquisitions. Our work with
Ralph Unglauben (Business Unit Manager [BUM] in Southern Germany) and Martin
Henne (BUM in Northern Germany) is fundamental. Fortunately, in Germany we have
around 20 employees and we are surrounded by people who know the particularities of
the country and the engineering sectors.
index The CT Engineering Group 18
INTERVIEW
Francisco Marin´s first steps in CT were as an Engineer
in the area of structure designs and he steadily began
“Commitment, boldness and non-conformism.” assuming responsibilities in projects. “I was the director
This is the virtuous triangle that Curro draws to of projects of Belly Fairing of the A380, of the Falcon F7X
describe Ralph Unglauben and Martin Henne. or the A330 MRTT and during couple years as BUM in the
“Unglauben and Henne have worked hard to develop non-aeronautical engineering sector.” In Spain he lived
CT Ingenieure. They were courageous to accept the through the business growth at CT, its development of
challenge of developing an emerging company in various engineering sectors and the relocation of its offices
Germany and they were mavericks because both until finally settling in Getafe.
had come from big companies,” argues Curro.
Did you imagine that you would have
Is this assignment to CT Ingenieure yet gotten this far when you started?
another challenge in a life full of challenges? Absolutely not. When I entered in CT I had just graduated
It is a change both personally and professional- from the university. It was my first job and I did not know
ly. It consists of doing what was done in France anything about the company when I started. Also, the
in 2009 but in a different environment. It is a department of aeronautical engineering was just starting
new culture, a new language and another man- in CT. I entered without knowing what I was going to do or
ner of conducting business. On the family level, how I was going to do it.
my wife and kids have to make changes to their
How did the move to Toulouse come about?
entire life: moving to new country, making new
TIn 2009 we made the move to France crossing the Pyre-
friends, learning a new language. I know it will
nees. The experience was both enriching and difficult at
be pretty difficult for a couple months before we
the beginning. We decided that CT should have presence
are able to adapt.
outside of Spain (we were only present in Spain and Por-
What are the sectors and projects tugal) due to being selected as an E2S company in 2008
that CT Ingenieure is immersed in? for Airbus Group. We realized that if we want to contin-
In Germany we have three avenues of develop- ue taking part in this list, which renews every two years
ment. The first is in Aeronautics where we work approximately, and continue growing as a company, one of
in three areas: in northern Germany (Hamburg, our obligations was to be present in those countries where
Bremen and Stade), with Airbus Civil, in south- Airbus locations were. Given that there is a large Airbus
ern Germany, with Airbus Defence and Space, site in Toulouse, we decided that the first office abroad
and Airbus Helicopters, and the third, related to should be there.
the companies and factories of the aeronautic In 2009 I began to travel there every week to look for
sector and which demand engineering services, opportunities to develop the business. That summer I
like in the case of Premium AEROTEC. moved there with my family. I was there for seven years
The second avenue of development is in the and it was a very rewarding experience, although I remem-
automotive industry, which is very important in ber that the beginning was difficult. Sometimes, it was
Germany. We hope to have many opportunities frustrating because you would knock on many doors but
although at the same time it is difficult since it the business opportunities were scarce. The first contract
is a mature sector. Nevertheless, in the south of came in the training area and it was a big surprise.
Germany we have contacts with Audi, BMW, and
Any advice you can bestow upon us
more in north with Volkswagen and Mercedes.
given your worldly experience?
With Audi, I think the help of Xavi Fernández
The key lies in working hard and above all continuing to
from Barcelona will allow us to create synergies
apply our culture of trust and delegation, which are keys
between Spain and Germany.
of success of The CT Engineering Group. My managers
Furthermore, we must focus our efforts in find-
have trusted me and delegated authority to me during
ing engineering companies that want to inte-
these 18 years and I am completely convinced that these
grate with CT as a method for development with-
two concepts will be what allow us to keep growing as an
in the automotive sector.
organization.
Finally, the third avenue of development will be
the search for synergies within the rail and ener-
gy sector, areas in which we have expertise in
and markets in Germany that we can tap into
and apply the concept of Nearshore (part of the
job done locally and part of the job done remote-
ly from Spain), which we already do for the aero-
nautical and automotive sector.
19 The CT Engineering Group
index
Country Manager in France
STANISLAS
CHOPPIN
Stanislas Choppin recently joined CT Ingenierie as Country
Manager. His experience, his forward thinking and his
familiarity with the business are just a few of his many
qualities. Stanislas joins at an important time as The CT
Engineering Group is diversifying its practices to maintain
long lasting business relations with clients.
index The CT Engineering Group 20
INTERVIEW
How relevant is this new role at The
CT Engineering Group for you?
Replacing Francisco Marín after seven years during
which he developed CT Ingenierie with great suc-
cess is definitely a challenge for me. CT Ingenierie
is currently working mainly for Airbus Group. In the
next three years, the strategy I want to implement
relies on diversification: we must be able to have
at least 50% of our activity coming from new cus-
tomers such as STX (marine construction compa-
CT values must
ny and services fleets), DCNS (a French defense continue to
naval company), Renault, Alstom, GE (an energy
group), CEA (French Alternative Energies and Atom- make a differece
ic Energy Commission) and CNES (Centre National
d’Etudes Spatiales). We also need to work upon
in a competitive
developing our activity in Paris and the surround- environment
ing area, as well as reinforcing our presence in the
west of France.
As Country Manager in France, what
objectives do you have?
Vicente Egea has given me three objectives to reach. The What are the main projects you are
first one revolves around finding and buying small and mid- involved in and represent the best of your
sized French engineering companies working for the naval, professional skills and personal focus?
industry, automotive and railway sectors, ideally located in First of all, in 2017, we will start working
Paris and in the west of France. The second one consists with STX, CT Dinain and CT Ingenierie team
of working with the French site managers (SMs) and all the at Saint-Nazaire. We will also start our first
French Business Unit Managers (BUMs) to open doors to projects with CEA and CNES. Lastly, we will
new customers and being able to start working successfully buy a small or mid-sized French engineer-
for them. The last objective is to supervise the three SMs in ing company with a lot of potential.
order to define and coordinate the sales action plan, as well What are the main values and
as ensuring all the reporting at The CT Engineering Group capacities in CT Ingenierie?
level. I think the high level of satisfaction we
What is your experience in CT? have achieved with our current customers
After a few months spent in CT Ingenierie I can say that I shows that our employees have the poten-
have never had, in all my working life, such an easy integra- tial and customer-focused attitude to bring
tion process. While meeting all the CT employees in Spain our company to new heights. The company
as well as in France, I noticed they share a real enthusiasm organization and the values around which
about the CT values. Furthermore, I also feel that they truly CT Group has been built are strong; they
understand and believe in the French strategy defined by The have made and must continue to make a
CT Engineering Group. difference in an environment as competi-
tive as ever.
When you came to CT for the first time, did you imagine
the growth of the company and your current job? Could you give any advice to
Most of the European engineering companies have gener- improve and to manage the
ated growth these past years. For me, the main fact that engineering tasks to do?
characterizes CT is the level of satisfaction obtained by our I believe that, in order to keep our level
teams in the field working for our customers. Thanks to this of growth and start working with new cus-
high level of satisfaction, CT has succeeded in generating tomers, the CM and the SMs must meet
trust and in building long-term relationships with its custom- one new customer every day. Simultane-
ers. Our growth is the result of these daily step-by-step rela- ously, it is important that the BUMs take
tionships built by our BUMs for years with our customers. more of their time to find and recruit some
As CM France, I must, with the SMs and BUMs, be able new profiles adapted to our new needs.
to achieve the same result with new customers. This would The securing of new customers as well as
create opportunities for French CT employees to evolve and of the right talents to fulfill the needs of
develop through new missions, and for our BUMs to recruit these customers, will allow CT Ingenierie
new CT employees in these new sectors. to achieve its strategy.
21 The CT Engineering Group
index
Víctor Máñez and Alejandro Buitrago Chicharro
INSIDE THE
DESIGN
PROCESS OF AN
AUTOMOBILE´S
“CPU”
Half a dozen coworkers at the Business Unit Engineering Madrid, of which
Ana López leads, have just finished a prototype assembly line design
project for Bosch. The prototype assembly line project is for the automatic
mounting of an Electric Power Assist Steering (EPAS) system for vehicles,
which acts like the CPU control for vehicles.
index The CT Engineering Group 22
REPORT
Delving into the structure design of the EPAS (Electric Power
Assist Steering) of a vehicle is no easy task. It is a maze of
complex, interconnected and finely detailed structures. It is
a job that requires sophistication, precision and control of
pace–qualities that this project and partnership between The
CT Engineering Group and Bosch provide. The faithful and
effective partnership starting in 2004 has since shared engi- A DECADE
neering projects for the assembly of all types sensors and
vehicle alternators.
Víctor Màñez I Corbella, project manager and customer repre-
OF LOYALTY
sentative, displays a figure on top of his CPU–the real, phys-
ical structure. The figure’s green color reminds us of another The project to design EPAS manufacturing
galaxy. Yoda’s presence not only evokes the memory of a film machines began in January 2016 and end-
franchise (Star wars) but rather is the implicit manifestation ed last August. During this period, half a
of a working philosophy that permeates the engineering work. dozen CT employees have been involved
and have completed more than 800 hours.
The magnitude of the project that will become “the CPU cars” A job that has involved both the design of
covers an inventory of 11 different products. The project deals the lines and support customer designers
with mechanical complexity: grappling with the dimensions to introduce improvements and cost sav-
and shapes to reach our goal of cycle time sequencer–the ings.
time it takes to get a piece in and out of the machine–. “We
are in charge of designing almost 80% of the machines on the “When I joined CT Ingenieros almost 12
test station line,” says Víctor. years ago I immediately started working
with Bosch,” recalls Víctor Màñez. During
“If you add the 11 items to the reduced space of the machine these years he has been the main interloc-
and cycle time sequencer, each item takes 15 seconds,” utor with the customer and has assumed
says Víctor while hovering his pointer over the 3D image on responsibility in project management. Dur-
his computer. Indeed, it is a customized pointer: an axel with ing this time he has seen how the map of
a gear, guiding CT Magazine’s eyes through the complex func- mechanical design software has changed–
tions of the machines. an important step for the integration of
The engineering design of this project has been performed technology in our workflow. “Leaving Auto-
in 3D with Inventor, a mechanical design software. Each cad 2D was a useful progression for us.
machine consists of several hundred manufacturing parts The test required many hours and now with
that are each individually designed. To optimize this process, 3D, the time takes four times less than
the machine, small in size (1.5 x 1.5 meters), is divided into before,” he remarks.
10 subsets that allow them to structure the project and to The Business Unit Engineering Madrid
map out their viability. develops design projects for Bosch in five
“Robert Bosch’s testing line has eight machines, and of those major areas. The two main areas of activity
we have done six,” says Víctor Màñez. This testing line allows are the design of USS lines - the parking
any of these machines to mount any of the 11 items available. sensors that are installed on the bumper
of the vehicle and the PAS lines for the
Furthermore, the mechanical design work included the real-
manufacturing of the airbag door sensor.
ization of a series of tasks: an electrical test that allows
These fields work together on almost 90%
each of the machines that form the products to be tested; a
of the projects CT performs with this client.
series of heat tests in the oven, where they proved that the
pieces can tolerate up to two minutes at a temperature of The remaining three activities include
90 degrees centigrade; a transfer station that moves items design DESC sensors, sensor for hydraulic
from one line to another using two robots; labeling; a pressing automatic gear shift car; alternators, for
test of the connector pins, whose unit of force cannot exceed generating current in the car; and design
0.98 newton; and finally, robotic simulation of eight stations. of pumps gasoline into the tank.
“These machines are capable of high quality and high preci- The quality of the engineering, sophistica-
sion manufacturing. In fact, the level of maximum deviation is tion and competitiveness of the Business
0.1mm,” says Víctor. Better accuracy than the best Hawk-Eye Unit in Madrid has lead to established
technology. long-term customer relationships and loy-
alty in our services. As Yoda would say,
fixed stoically on the desk: May the Force
be with you.
23 The CT Engineering Group
index
TWO YEARS WITH
CRE100DO AND PROUD
TO BE PART OF THE
PROGRAM
November 2014 was an
important date for The CT
Engineering Group, a turning Cre100do is not physically present in any business unit,
point for further growth in their nor is it part of the portfolio of our customers or suppliers.
But for two years, they have worked side by side with The
internationalization process. CT Engineering Group in the process of development and
Valuing the strength, ambition internationalization.
and the near shore model of “Cre100do has opened our eyes and allowed us focus on
solutions in our process of transformation and growth,”
the company, the Spanish says Jesús Prieto, president and CEO of The CT Engineering
business program Cre100do Group. Visible on his desk are papers and documents relat-
ed to this business program: the best business practices,
decided to join us in our success stories and new management approaches.
transformational process. The inclusion of CT in the first group of companies to be
chosen in November 2014 was a boost of confidence and
pride for a job well done. “It was a surprise,” affirms Jesús
and describes the experience as “very positive notoriety
that gives us the opportunity to meet other entrepreneurs
and executives from dynamic and growing businesses”.
For the last two years, Cre100do has worked with The CT
Engineering Group, showing us other forms of manage-
ment, which has led to the implementation of branding,
talent and multiculturalism projects. “This has allowed us
to learn new ideas and approaches, especially in business
management,” says Vicente Egea, General Manager of The
CT Engineering Group.
index The CT Engineering Group 24
R&D PROJECT
“Internationalization means expanding the ecosystem of the
company, which broadens our working environment to a greater
diversity of agents. Internally, internationalization implies the
integration of new cultures that enrich our company. The chal-
lenge is to integrate and act within a shared company culture.
This is an important job for the organization but with big results,”
explains Teresa Saez-Benito, deputy director of Cre100do. Cre100do is a Spanish
business program promoted
Although there is no magic recipe for big businesses, there are by the Bankinter Innovation
several common ingredients found in all of them. “What we Foundation, the Institute for
value in a company is an ambition for growth and to reach their Foreign Trade (ICEX) and
potential, with the ability to do so because they are a solid com- the Business Circle. They
pany with committed employees and satisfied clients, a distinc- contribute to the development
tive value proposition, a shared strategic vision and a success- of Spanish production models
ful corporate culture of excellence,” summarizes Teresa. to progress them towards
It is precisely this aspect that makes the difference between models based on more added
a big company and a great company. “Being a big company value, more innovation, more
means achieving high turnover figures. Being a great company competitiveness and more
means achieving high levels of excellence. Although the terms internationalized performance
are not mutually exclusive, they do not necessarily go hand in turning 100 companies in
hand,” says Teresa. large enterprise models. All
Cre100do explains that The CT Engineering Group was selected companies participating
because it is an example of a company that has a solid founda- in the Cre100do program
tion, has ambition and can generate a “drag along” effect for turnover between 25 and 250
companies in other sectors through its near shoring model and million euros and belong to
its growth plans, which are based on acquisitions of small spe- different sectors, such as
cialized companies. “We found their growth plans, based on man- food, technology, fashion,
ufacturing engineering, internationalization and diversification engineering, pharmacy
projects, very ambitious and motivating, and we believe that the or chemical industry, and
contribution of CT to the program would be valuable for other Cre- are based in 10 different
100do companies and other companies in the middle market”. autonomous communities.
Cre100do aims to become a
The CT Engineering Group is firmly committed to maintaining meeting point and encourage
its identifying traits (competitiveness, innovation, flexibility and the exchange of knowledge
proximity) to develop international projects and new business and experience of the 100
lines. companies participating
throughout the five years of
the project. This business
transformation program will
continue to accompany The CT
Engineering Group over the next
three years.
25 The CT Engineering Group
index
R&D PROJECT
INNOVATING THE
ELECTRICAL STARTER/
GENERATOR
DISCONNECTION SYSTEM
AIRCRAFT ENGINES
StaGeDis will establish new conceptual designs for a dual-
use starter/generator disconnect system. New generation
aircraft require higher level of electrical power, increasing
weight and volume of the electrical machines. This R&D pro-
ject has been created to compensate the growing weight
and volume of the necessary equipment that is needed to
generate and distribute the electrical energy inside the air-
craft. The project works to evolve traditional generators so
that they can operate as an electrical starter as well and
can eliminate the need for a pneumatic starter system.
The StaGeDis project analyzes, studies and compares the
StaGeDiS is an innovation different technology and architecture that can optimize this
project developed to new system in the aircraft. In doing so, the project seeks
solutions to achieve a global reduction in weight and dimen-
complete a conceptual sions, an increase in the reliability and security of the sys-
design for a dual-use tem and approaches to make the system more easily main-
electrical starter/generator tainable–thus reducing maintenance time and costs. The
selected solution will carry out a detailed design, complete
disconnection system to with the appropriate definition and methodology for the ver-
be installed in the main ification and qualification tests. The project relies on the
collaboration and wide experience of Indra for the design of
engines of an aircraft. on-board equipment. They have been chosen as a partner
due to their comprehensive expertise in the definition of sys-
tem requirements, system evaluation and system validation.
Due to safety reasons, the starter/generator requires a
disconnection system to protect the machines and engine
gearbox. This disconnection system shall be able to sep-
arate mechanically the gearbox from the starter/generator
with the electrical machine operating whether as starter
or generator. This system will be commanded by an elec-
trical pulse. Different technologies and architectures will
be studied, evaluated and compared in order to define a
proper disconnection system. Criteria of weight reduction,
compactness and conformity with harsh aeronautic engine
environment will be also an important part of the study. The
selected solution will require a detailed design and the defi-
nition and methodology of the verification tests.
StaGeDis has been co financed by the European Commis-
sion through “Clean Sky Joint Undertaking” within the 7º
Framework Programme of the European Union.
index The CT Engineering Group 26
R&D PROJECT
DEFACTO – ADDITIVE
MANUFACTURING
DEVELOPMENT
FOR TOPOLOGICAL
COMPONENTS
Since 2013, CT Ingenierie has worked in partnership with Stellia Aerospace
and Constellium on the former project FAST (Topological Structure for Advanced
Forward Section). Last year, Ecole Centrale de Nantes joined the project to
further improve the consortium’s capability to understand Additive Layer Manu-
facturing (ALM) applications and limitations.
The DEFACTO project intends to design, develop and manufacture a demon-
stration of A320 forward fuselage section. The project explores breakthrough
design philosophy owing to structural topological optimization. It also aims to
democratize and develop ALM technologies for Aluminum alloys. This project is
founded by DGAC.
CT Ingenierie committed to this project in order to gather knowledge and devel-
op tools for topological design methodologies. The company is convinced that
topological optimization will provide competitive and cost effective design solu-
tions to customers. The benefit of topological approach was demonstrated
during the FAST project. FAST optimized crossbeams weighing up to 25% less
and are proven to meet the same certification requirements.
The following tasks are required to progress throughout the various design
steps and to achieve the successful development of optimized structures.
The conceptual design starts with the loadcase analysis conducted using the
Global Finite Element Model (GFEM) related to certification. It allows determin-
ing whichever sizing cases are necessary to optimize the structure. Further
work is required on the selected ones to ensure no bias can be introduced by
the loading application.
The actual optimization is conducted on a Detailed Finite Element Model
(DFEM) which includes only the target area. This area is defined as uniform as
all coarse elements from GFEM are replaced with small elements. A density
ranging from 0 to 1 is assigned to these elements, determining whether they
represent void or dense parts of the optimized structure. One of the DFEM
specifications is to ensure coherence between DFEM and GFEM loaded nodes.
This optimization provides comprehensive material density on the target area
which maximizes the stiffness with a constrained average material density.
The load path identified through the optimization are identified as structural
stiffeners and sorted depending on their relative size. This stage is called inter-
pretation; it ends the conceptual design phase. The interpretation conclusion
is highly dependent on the thresholds selected.
The embodiment design phases shape the stiffeners using parametric optimi-
zation. This optimization sizes the stiffeners depending on the hierarchy estab-
lished in the previous step. The conclusion of the parametric analysis is used
to initiate the detailed design phase.
27 The CT Engineering Group
index
Gerhard Marzinik
(Article published in Aerokurier Magazine)
AXTER´S HYBRID
AX-40S PLANE.
MORE POWER,
MORE SAFETY
Increase in power at the start and a fully electric operation
in case of failure of the piston engine - that is what AXTER
Aerospace promises with the hybrid engine AX-40S.
On the streets hybrid engines are part of everyday life, sparing onautic expert and CEO of the 1500 strong
the environment from carbon dioxide and fine dust. But what company provided AXTER with FEM and
use does hybrid propulsion have in aviation? Fine dust and car- structural analysis programmes. The Uni-
bon dioxide are not relevant factors. versity Carlos III in Madrid contributed with
For the Spanish start-up AXTER Aerospace the safety “plus” their know how in the design of the power
that an additional electric drive can offer was the decisive argu- electronics.
ment to develop a hybrid propulsion for the aviation sector. The The already patented hybrid system of
first model, the AX-40S with a 30 kW (40 hp) electric motor, AXTER is the first step towards further and
developed for the Rotax Motors 912 and 914, provides the test more powerful systems and a final objec-
plane, the Sport Aircraft Tecnam P92J equipped with lithium tive of purely electrical propulsion. They now
batteries, the option of seven minutes of purely electrical pro- aspire to obtain a licence for Experimentals,
pelled flight. In a previous version for a client, the Technam Light Sport Aircraft (LSA) and Very Light Air-
P2004 with a variable pitch propeller even achieves 12 minutes craft (VLA) and even of airplanes of the cat-
of electric propelled flight in the event of engine failure. egories CS-23 and CS-25. VLAs which have
What is this good for? After having worked for Airbus projects for a maximum take-off weight (MTOW) of up to
8 years, the two founders of AXTER, Miguel Suárez and Daniel 750 kg shouldn’t have a problem with the
Cristóbal, investigated the statistics of aviation accidents before additional weight of a hybrid system.
embarking on the venture of hybrid propulsion. The aeronautical The AX-40S was developed as the more
engineer Miguel Suárez and the electrical engineer Daniel Cris- manageable entry level variant for the use
tóbal wanted to improve the sad annual average of 71 deaths in in the LSA- and Experimental sectors where
Europe and the USA due to inflight engine failure with their new Rotax motors are very common, and it has
development. At present the hybrid engine provides the pilots now been approved by the Spanish Aviation
with a little breather after the shock of an engine failure, and Authority.
enables them to act stress free and gives them time to think. The system can be mounted on four points
The Spanish government considered the project worthy of of the Rotax 912/914. The structure is part
financing and contributed with initial funding. The CT Engineer- of the system. The crankshaft is connected
ing Group in Madrid-Getafe, which has deep roots in aviation, to the electric motor through an automat-
providing engineering services for Airbus, Dassault and ATR, ic working coupling, produced specially for
entered the project as a strategic partner. Jesús Prieto the aer- AXTER by Endrax in Slovenia. The electric
index The CT Engineering Group 28
REPORT way, airfields subject to time restrictions in order to
reduce noise, could be used again.
The Rotax is switched on again while approaching
the runway 26 of Casarrubios. The wildly rugged land-
scape that can be observed during landing is impres-
sive. Should the piston engine fail here, the hybrid
system would allow one to reach the runway secure-
ly. In this case it would be too late for the deploy-
ment of the BRS, due to the insufficient altitude of
the aircraft.
To turn on and connect the electric system one only
needs to turn a knob located on the instrument pan-
el, as long as the main switch is already on. The
display indicates the most important performance
parameters. Various LEDs indicate potential failures.
Large modifications to the equipment of the hybrid
system on the P92 weren’t necessary. The extra
weight of the carrier (0,9 kg), coupling (5 kg) and
electric motor (12kg) along with the controller (6 kg)
and the batteries (20 kg), which are located behind
the seats, compensate each other, thus avoiding the
Daniel Cristóbal and Miguel displacement of the centre of gravity. The new posi-
tion of the propeller, sitting further in the front, didn’t
Suárez, Founders of Axter turn out to have a negative influence in various differ-
ent flying configurations.
It took the AXTER system AX-40S 200 hours in test
flights to get approved, among them flights from
Seville in Andalusia’s 45 degrees blazing heat. The air
cooling system of the electric motor proved its worth.
motor can be switched on at will and will work decou- The AXTER engineers, with the use of the hybrid
pled from the piston engine in the case of engine fail- engine, have accomplished substantial cost benefits
ure. The batteries recharge themselves with the fuel for flying schools. They consist of savings in fuel and
engine, provided that the electric motor was used for maintenance costs by using the Rotax less during
the start and initial ascent. taxiing. The electric drive and the coupling are main-
Miguel Suárez demonstrates the use of the AX-40S tenance-free. Hybrid pilots will also be popular with
in Casarrubios del Monte, a popular place for the gen- neighbouring residents of airfields since they reduce
eral aviation scene south west of Madrid, with a 950 the emission of carbon dioxide.
metres long asphalt runway. Comparing take offs on The cost of the complete package, which allows an
the 2050 feet elevation site at 35 degrees Celsius, easy montage, is assembled in Getafe and currently
typical for Spain in the summer, with and without the costs 18,700 Euros plus taxes and shipping costs.
assistance of the hybrid system, demonstrate the Miguel Suárez explains that this only covers the pro-
advantages of the e-motor. duction costs.
In standard conditions, the hybrid engine reduces the After the development, the certification process and
take-off distance of the Tecnam P92J with a maximal the production set-up, the focus of AXTER Aerospace
start weight of 600 kg from 200 to 145 metres. In the now lies in the commercialisation of the AX-40S. A
high density altitude of Casarrubios the difference is second plane is now being equipped for clients. A fur-
even more noticeable. Unlike the piston engine, the ther two are going to be sent to Cranfield University
electric motor doesn’t lose power in higher density air. in Great Britain, where the electric drive will be used
The P92J-Hybrid working entirely electrically still man- for drone research.
ages to climb 200 feet a minute at a speed of 135 In AXTER, further research and development is being
km/h. pursued in parallel to the commercialisation of the
The increased performance of the hybrid system at first hybrid package. It’s all about developing a com-
start and initial ascent is more pronounced in Hot- pletely electric drive and finding further uses for the
and-High-conditions and on shorter runways (high- AX-40S.
er grass, sloped runway …). On the other hand, the
electric propulsion can be used under standard con-
ditions to reduce the power contribution of the piston
engine and thereby diminishing noise emissions. This
29 The CT Engineering Group
index
David Soriano, Antonio Villar Amador
and Alberto Alonso Martínez
David Soriano, Antonio Villar
Amador and Alberto Alonso
Martínez were part of the
winning male team for the six
kilometer race –the Carrera de
las Empresas. Fifty coworkers
from CT Ingenieros took part
in the race that weaved its
way through the heart of the
Spanish capital.
index The CT Engineering Group 30
SPORT SECTION
CT INGENIEROS WINS
“CARRERA DE LAS
EMPRESAS” 6KM RACE
IN MADRID They, along with the rest of their
coworkers, took part in their first
trials a few months before, apply-
ing patience, effort and tenaci-
Goals are Excellent results never appear spontaneous-
ly, nor do they come out of nothing. Tenacity,
ty to each day of their training.
During the previous months they
effort and courage are essential ingredients did extensive physical as well
nor just for that accompany success, whether they be as technical training, because
recalling work, sport or life in general. All personal and “running, although it seems sim-
ple, requires a certain technique
professional growth is born of conviction. It is
and leaving self-motivation which unites all of our abilities in to avoid injuries,” Jorge Fuente,
behind, rath-
order to overcome obstacles, improve ourselves design engineer at CT Ingenieros,
every day and become motivated to accomplish tells the CT Magazine.
our goals.
er they are He was in charge of preparing a
More than fifty coworkers from CT Ingenieros training plan for his colleagues.
the start of geared up to participate in the race on Decem- Qualities such as technical knowl-
ber 13, 2015. The cold morning came to life with edge and dedication were not
a next step the starting gun which began the race they had unknown to him. “I started doing
spent months preparing for. Six or ten kilometers track and field in 2000 and con-
ahead of them, through the emblematic streets tinued to 2012. It was hard train-
of Madrid, such as the Paseo de la Castellana, ing, six days a week, I shared
and Plaza Colón, the square that is named after the field with an athlete that had
the tenacious conqueror Christopher Columbus. participated in the Olympics,” he
Three of them stepped up to first place: Alberto tells us. There were a few months
Alonso, David Soriano and Antonio Villar. The where the Cerro de los Ángeles
team had won in the men’s category for the 6 (Getafe) had transformed into the
kilometer race. “We had said goodbye and I was epicenter of a training philosophy:
already leaving. Then I saw the rankings, and running is a gift, and you get what
I quickly sent a Whatsapp and a photo of it,” you put into it.
recalls Antonio Villar, an employee in the Sys- The race has ended but its goals
tems team, when he realized they had just got remain. Goals are not just for
first place. “I couldn’t believe it, I thought it was recalling and leaving behind, rath-
a joke,” says David Soriano, employee in the er they are the start of a next
Stress department, when he read the text. The step, which allows us to apply the
official announcement arrived a few hours after training we worked for to tackle
‘the third stage’ was finishing. new and important challenges.
It all started when Antonio, David and Alberto, Well done to everyone in the CT
from Customer Services, met at la Carrera de team for taking part!
la Ciencia (Race for Science). There was a good
synergy and Antonio found out that in previous
years the six kilometer races had been “achiev-
able”. “I wanted to try and to see how it would
go for me,” he explains. So he got to work and
convinced David and Alberto to do the same.
31 The CT Engineering Group
index
INTERVIEW
CT Magazine interviews Javier Molina after
finishing the Ironman 70.3 in Mallorca. An
Ironman 70.3, also known as a Half Ironman, is
one of a series of long distance triathlon races
organized by the World Triathlon Corporation
(WTC). The “70.3” refers to the total distance in
miles (113.0 km) covered in the race, consisting
of a 1.2-mile (1.9 km) swim, a 56-mile (90 km)
bike ride and a 13.1-mile (21.1 km) run. Each
distance of the swim, bike, and run segments is
half the distance of that segment in an Ironman
triathlon. The event location, Alcudia, is one of
the most celebrated towns in Mallorca, with
more than 30 km of the coastline made up of
gorgeous, fine sand beaches, steep cliffs and
secluded coves of great beauty.
What types of challenges did Ironman Mallorca 70.3 entail?
For me, the challenge of entering the world of the triathlon was an
endurance test. It involved as much completing the race as it did train-
ing in a completely different way than I had ever done before. Running
is something that I am more or less accustomed to, but, although I
participated in the Sertri (triathlon in Madrid) a couple of years ago, I
had not trained for swimming or biking before. Preparing these three
disciplines at the same time was something new, and moreover we
JAVIER
started training in January, which didn’t give us much time.
What type of preparation do you have to do for an Ironman
like the one in Mallorca, on a physical and a mental level?
MOLINA
Since we started preparing for it, we tried to go swimming and running
two days per week and at least take one day to do some biking–at
home on a machine when there was bad weather, or on the weekends
for a longer ride when the weather permitted. With regards to the
psychological preparation, I am not very mentally strong, so I simply
tried to suffer through the training in order to not have any surprises
during the day of the race. During all the sessions in the pool of the
last month I was covering the distance of the race, and for cycling I
trained both the distance and the climbing portion a couple times.
Training to make sure I could do something like this, having already
done something similar before, is what allows me to face new chal-
lenges with confidence.
Did you make any changes (to your calendar, training, sleep
or nutrition schedule) to progress faster for the race?
Training is As we approached the race, the last month we intensified the training
a bit in the sense of not missing any day if possible. For this we had
what allows to adapt our work schedule a bit and reduce our free time. But other
than that I did not make any major changes. My nutritional plan did
me to face new not change, I just tried to sleep more during the preliminary weeks to
recover a little better. The week before the race, yes, we rested and
challenges with did not train. Better go to the race a bit under trained than to go tired.
index confidence
The CT Engineering Group 32
The run was the part where I had to suffer.
The first third I did very comfortably, but by
the 8th kilometer the bike part had taken
How were the weather conditions in Mallorca? a toll on me and my legs began to ache
Did you expect them as such? considerably. The last lap felt like eternity,
Well the weather was our main obstacle: we had rain, wind, but at a slower pace I managed to finish it.
cold temperatures... We expected that with both the time of There were also many people cheering and
year and the place of the race we would have good weather. that always helps.
And in fact we actually took some vacation days to relax on
the beach after the race. But the week before the race, the Your final time was…..? Are you
forecasts warned of bad weather and it worsened as the date content with the result?
approached. It took me about 6 hours and 35 minutes to
Precisely because we did not expect it, we did not go very complete. My goal was to finish, so my time,
equipped for those conditions. Personally, I worried about the taking into account the weather conditions,
biking part since I had never trained in the rain, and the down- strikes me as a good result and was more
hill parts during the mountain sections of the race troubled or less what I expected. Finishing in 6 hours
me. Luckily in the end the conditions were eased a little. We or less would have been a very good time
got cold waiting before the start, and rain did not stop from the for me. Personally upon finishing a race of
time we left the apartment until we returned. But in the end this type I always leave thinking I could have
the conditions turned out to be nothing more than discomfort. pushed myself a little harder at some point
in the race, or that some aspect of my perfor-
All that remained was to sleep, get up early and mance needed to be trained a little more...
get going, how was the morning pre-race? So I really never leave 100% satisfied since I
I was expecting not to sleep well before the race due to nerves, always know I could have done a little better.
but the truth is I rested like any other day. The only drawback But given that it was my first triathlon, and
was that we did not sleep much that night. I was up at 5:00 considering how I had trained and the weath-
am for breakfast and to get prepared, and then suddenly we er conditions, I’m happy with the result.
were hit with the bucket of cold water that was to go outside
and feel the rain that was pouring. Getting up was difficult of What are your next challenges?
course, but the nerves wake you up quickly. So far I have not thought of any new chal-
lenges to embark upon. I imagine that when
How would you describe your adventure in the race? someone does a half Ironman the first thing
The worst part was waiting at the starting area. For the swim- that comes to mind is to do a full Ironman.
ming part, people had to go in groups according to a set time. But that is something I do not see in my
So until we started we spent 40 minutes in the rain and cold reach, at least for now. For now, my only
despite wearing a wetsuit. Swimming is what I performed the certain goal is to not stop training. I may
worse at, but the truth is that I did better than I expected, slightly reduce the intensity of my workouts,
probably because of the help of wetsuit. The main complica- but I will keep training and try to reduce my
tion for me was that there were many jellyfish, small and wide- running times, for the 10km to a marathon.
ly dispersed, so you could not avoid them or ignore them. One For me it is not so important to train for a
of them stung me in the face, but it was very little compared massive goal as it is to be prepared to sign
with bites suffered by some of the other competitors. up for whatever arises, whether it is a game
The bike section of the race had an ascent to the port, a of paddle or a triathlon. Of course, if there is
descent and a flat stretch. The three parts are more or less group that wishes to prepare for another half
similar in distance. The climb went pretty well, I even got ahead Ironman in the future, I will be there, and try
of some people. The same happened during the descent, my hardest to beat my previous race time.
because everybody was afraid of falling in the rain. It was dur-
ing the flat stretch where I lost the ground that I had previously You are now an Ironman finisher.
gained. In addition, the speedometer had been damaged by What is your advice to triathletes
rain and I had no reference of time. This stretch took me a bit who want to compete in Ironman?
longer to do, and I regretted not having done more long rides I do not know if I’m qualified to give advice,
in training, but I ended up keeping it together well. because I believe I have strayed considera-
bly from what a real athlete or a coach would
recommend. Simply put, they should try. And
if they can train with people, the preparation
goes much easier. I imagine that someone
who would be interested in this type of race
already has a workout routine, so it is only
taking that one step further. It will be diffi-
cult more or less, but if I could do it, any
regular triathlete can.
33 The CT Engineering Group
index
SPORT SECTION
MISSION
ACCOMPLISHED:
GUILLERMO
PORRERO
COMPLETES
VILLACAÑAS
DUATHLON
Our workmate Guillermo Porrero participated in
the IV Duathlon Cross in the Spanish municipal of
Villacañas (Toledo).
Guillermo Porrero is “content” after finishing the fourth Duathlon Cross
Villacañas (Toledo, Spain) for beating his time of the last year’s edition.
“Mission accomplished”, he says proudly. And no wonder, because Vil-
lacañas is his hometown. The duathlon was held on September 11 and
had a distance of 27.5 kilometers (5 km race walk, 20 km mountain
bike and 2.5km run) in which more than 100 athletes participated.
The terrain of Villacañas, being located on the side of the mountain,
leaves little room for a flat course design. “The race had a constant
slope of about between 4% and 5%. It’s an up and down knee breaker
route which also had a lot of wind blowing so we had descend using
drafting [the technique of following each other to reduce wind resist-
ance]” says Guillermo Porrero.
His love of the sport began in high school where he joined a track and
field team, competing in cross country events as well as within stadi-
ums. His aeronautical engineering studies in Madrid forced him to stop,
but when he graduated, he reprised his love of the sport along with his
brother. “It was five or six years ago when I started competing in open
races around Madrid, such as the Saint Silvester, and from then I began
to go much harder with my bike,” recalls Guillermo.
The cross-country Duathlon in Villacañas attracts registrants and fans
in each edition. “Each year more and more people are excited to come,
and every time there is more of an audience. The atmosphere is fun and
enthusiasm of the public motivates you,” he says. It was a weekend full
of sports activities and time to enjoy the company of friends. “I did not
run alone; rather I encouraged some friends to stay for the weekend
and to run with me.” All in all, a fantastic weekend in the heart of La
Mancha.
index The CT Engineering Group 34
CORPORATE SOCIAL RESPONSIBILITY
CT EMPLOYEES
COMMITMENT
TO SOCIETY The board of directors of The CT
Engineering Group has supported two
volunteer projects promoted by CT
employees, showing their commitment to fostering these types of initiatives
and strengthening their sense of corporate social responsibility.
Two volunteer projects were discussed by the board of directors at The
CT Engineering Group. The first consists of developing a Maintenance
Drip Irrigation System in Nariokotome, a remote region in Turkana
(northern Kenya) where the majority of the population is illiterate. For
this reason the design of graphic and visual manuals will allow them to
be self-sufficient in maintaining the system.
The second project consists of donating computer equipment to a com-
munity in Inharrime (Mozambique) in collaboration with the NGO “Friends
of Inharrime.” The goal is that these computers are used as education
tools that break the circle of poverty in which the community lives.
During the last CT board meeting, it was agreed to support these vol-
unteering actions and to encourage corporate social responsibility
actions. The board maintained the objective is to “get the voluntary
commitment of people from the company that are interested in dedicat-
ing part of their time to social causes.”
Volunteer projects should be sustainable and, where possible, be relat-
ed with the activities of The CT Engineering Group. The decision of
participating in a project must be completely free, voluntary and coordi-
nated/directed by the participants of the project. All volunteer projects
will be analyzed by the board and will be supported financially by them
if necessary.
35 The CT Engineering Group
index
RECOGNITION
Joan Font, Jesús Prieto
and Vicente Egea
JESÚS PRIETO
RECEIVES AN
AWARD FROM
THE ALUMNI Thighlighted
he pannel
the
ASSOCIATION entrepeneurial
ETSII – UPM attitude
The Alumni Association ETSII-UPM recognized Jesús Prieto, president of The CT Engineering Group, with the
award ‘Entrepreneurial Industrial Engineer’. The award from the Alumni Association recognizes the excellent
work Jesús has carried out in Engineering Consulting services. The panel highlighted the entrepreneurial
attitude that is required to convert The CT Engineering Group into a reference company for product design
engineering, manufacturing and after-sales support. Carlos Mira, president and founder of Cre100do and in
charge of presenting the award, emphasized “the company possesses the capacity to identify opportunities
to differentiate themselves from the competition and to contribute value to clients as well as employees.”
Jesús accepted the award and maintained, “I must share this privilege with all of those who have supported
me throughout these years to build The CT Engineering Group.” During his speech he elaborated on the
importance of being surrounded by a such a great team in order to turn the company into a reference within
the industrial sector. Today, The CT Engineering Group has 1,497 employees, operates in four continents
and made 115 million euros this year.
The seventh edition of these awards took place in the headquarters of ‘The School of Industrial Engineering’
(Escuela Técnica Superior de Ingenieros Industriales – ETSII) which has become a professional meeting
place where many generations of alumni and professors from the school gather. The awards were headed
by the chancellor of the Technical University of Madrid (UPM), Guillermo Cisneros, and by the director of The
School of Industrial Engineering (ETSII), Emilio Mínguez.
index The CT Engineering Group 36
RECOGNITION
CT INGENIEROS RANKED
50TH ON THE LIST OF THE
TOP 100 “BEST COMPANIES
TO WORK” IN SPAIN This ranking
motivates us to
continue our process of growth and internationalization, remaining loyal
to our goals and our corporate philosophy: CT, a place where engineers
love to work.
The finance magazine Actualidad Económica has published its annual ranking with the
best 100 companies to work for in Spain. CT Ingenieros came in at 50 and is the first
company dedicated to engineering services to appear on the list. This ranking evaluates
multinational companies and other big companies on merits such as good working prac-
tices, labor relations and corporate responsibility.
Independent evaluators valued the good work environment at CT Ingenieros and admired
the care and attention to “training and employee development” that CT provides. The
evaluators also appreciated CT´s internal communication tool: “CT, Innovation & Improve-
ment Ideas”, renamed, after the new design of the corporative intranet CT Insider, as
“Share your ideas for CT”. This tool allows all workers to be able to share their ideas with
all corporate departments.
The evaluation methodology measured six categories: talent management, payment
and salary, work conditions, corporate social responsibility, training and employees.
This ranking motivates us to continue our process of growth and internationalization,
remaining loyal to our goals and our corporate philosophy: CT, a place where engineers
love to work.
37 The CT Engineering Group
index
CORPORATE NEWS
CT AEROCOMP BECOMES
CT ENGINEERING GROUP UK
AND OPENS NEW OFFICE
CT Aerocomp has opened a new office and changed
its name to CT engineering group UK.
Due to this change our brand image remains consistent and reflects the unity of the entire group. The office
in Bristol (Bristol and Bath Science Park, Dirac Crescent, Emmerson Green) allows it to be closer to custom-
ers in a building that is exclusively designed for engineering and science companies.
Currently the CT Engineering group UK has 16 engineers spread across Airbus R&T, National Composite
Centre, Airbus F&DT, Training and research and development.
The CT Engineering group UK specializes in design & analysis of composites and manufacturing support
and training for all areas of engineering. It also has an ongoing UK research project looking at automatic
ultrasonic welding of thermoplastics.
CT INGENIEROS SIGNS ITS
FIRST NEARSHORING CONTRACT
WITH ASAP ENGINEERING
The client, Automotive System And Projects
(ASAP), is present in nine locations and employs
1,000 people. Using its expertise and know-how
ASAP is constantly widening new technological
fields and providing innovative solutions.
The mission of this first in-house project is to
design the harness for all C-BEV electrical vehicle
components for Audi. Reaching this milestone, CT
Ingenieros de Catalunya achieves one of the goals
set in its Strategic Expansion Plan.
index The CT Engineering Group 38
CORPORATE NEWS
CT IS RESPONSIBLE FOR BIM
MODELS OF THE LARGEST
SHOPPING MALL IN ANDALUSIA
CT AEC (Architecture, Engineering and Construction) is
responsible for the quality of the BIM models of the largest
shopping mall in Andalusia (Torremolinos, Málaga). The project
is expected to reach a total investment of 1,200 million euros.
Building information modeling (BIM) is a process involving the generation and manage-
ment of digital representations of physical and functional characteristics of places.
Building information models (BIMs) are files (often but not always in proprietary formats
and containing proprietary data) which can be extracted, exchanged or networked to sup-
port decision-making regarding a building or other built asset. Current BIM software is
used by individuals, businesses and government agencies who plan, design, construct,
operate and maintain diverse physical infrastructures, such as water, wastewater, elec-
tricity, gas, refuse and communication utilities, roads, bridges, ports and tunnels.
In addition, CT AEC is involved in the structures for the new Palace of Justice in Paris,
designed by Renzo Piano, one of the best architects in the world.
39 The CT Engineering Group
index
index
[READING ORDER TEXT]
REISSUE
1 The CT Engineering Group
A PLACE WHERE
ENGINEERS LOVE TO WORK
December 2016
indexThe CT Engineering Group 2
INDEX 3 EDITORIAL
Jesús Prieto: What sets CT
apart?
4 REPORT
Three aeronautical achievements
at CT in 2016
8 INTERVIEW
Diego Jiménez
9 REPORT
New Energies AT CT
12 INTERVIEW
Philippe Santos
14 ANALYSIS
Powerplant Integration in
Aircrafts
16 OPINION COLUMN
Vicente Egea: A comparative
differentiation. The role of a
person in CT
18 INTERVIEW
Francisco Marín
20 INTERVIEW
Stanislas Choppin
22 REPORT
Inside the design process of an
automobile´s “CPU”
24 R&D PROJECT
Two years with Cre100do and
proud to be part of the program
26 R&D PROJECT
Innovating the electrical starter/
generator disconnection system
aircraft engines
27 R&D PROJECT
DEFACTO – Additive
Manufacturing Development for
Topological Components
28 REPORT
AXTER´s Hybrid AX-40S plane.
More power, more safety
30 SPORT SECTION
CT Ingenieros wins “Carrera
de las Empresas” 6km race in
Madrid
32 INTERVIEW
Javier Molina
34 SPORT SECTION
Mission Accomplished: Guillermo
Porrero completes Villacañas
Duathlon
35 CORPORATE SOCIAL
RESPONSIBILITY
CT employees commitment to
society
36 RECOGNITION
Jesús Prieto receives an award
from the Alumni Association
ETSII – UPM
37 RECOGNITION
CT Ingenieros ranked 50th on
the list of the top 100 “Best
Companies to Work” in Spain
38 CORPORATE NEWS
CT Aerocomp becomes CT
Engineering group UK and opens
new office
38 CORPORATE NEWS
CT Ingenieros signs its first
nearshoring contract with ASAP
Engineering
39 CORPORATE NEWS
CT is responsible for BIM models
of the largest shopping mall in
Andalusia
indexEDITORIAL
WHAT
SETS CT
APART?
As we continue to become more relevant on the international engineering scene,
we need to understand what differentiates CT from other engineering companies.
Once we capture this I encourage you to internalize it, be proud of it and share it
with everyone.
When I look around me and think about what our organization is today I see moti-
vated, responsible, intelligent, and collaborative people that value long term rela-
tionships with everyone: customers, suppliers, colleagues as well the company
itself. I see a nurturing work environment that leaves a very positive impression on
visitors. I see a shared vision, mission and set of values that make up the corner-
stone of our corporate culture. Finally, I see a solid base of engineering know-how
and a very professional approach to business with a constant drive to deliver on
our promises and surpass customer expectations.
But, is this all my imagination? Is this how others also perceive CT? Is this the
reality? Is this how employees in other Spanish offices, in France, Germany or the
UK perceive CT? Is this how our customers and subcontractors see us? Is this
how society in general thinks of us? Well, we better find out. Even if this were true
in a large part of the organization we need to see how we can permeate other
parts, even countries, where this might not be completely true. All of this must
also be transferable to the new companies that become a part of CT in the near
future so they too can participate in our joint strategy and goals.
To find out, we have launched a “branding project”. Over the next couple of
months, this project will help us bring to light the positive “intangibles” embedded
in our culture; things that we take for granted and must be recognized and made
tangible. These are precisely the things that set us apart from our competitors.
Once we understand the essence of our competitive advantage we will be able to
better communicate it to each of our stakeholders: customers, subcontractors,
and society in general. Most importantly, this effort will allow each of us to under-
stand these key value-adds, internalize them, be proud of them and reverberate
them with everyone. I want to thank each of you for joining us in this attempt to
capture what makes us special, and, most importantly, for what you do each day
to help set CT apart.
3 The CT Engineering Group
JESÚS PRIETO
President & CEO
indexThe CT Engineering Group 4
The aeronautical business units continue
to grow. Our strategic goals include
obtaining excellent results, consolidating
our position in the sector, and keeping
ourselves at the cutting edge. This
year continues to be a great year for
aeronautical activity at CT. Among the
milestones, The CT Engineering Group
consolidated its relationship with Airbus
Group thanks to the renewal of its
qualification as an Engineering Supplier
Strategy (E2S). Earlier this year, another
milestone was achieved when Airbus
Defence & Space Engineers informed CT
of the awarding of MultiCo, a contract
to provide engineering services for the
Airbus division. Finally, CT extended the
technical signature delegation to all
Airbus Group. These three achievements
have been added to CT´s curriculum,
which also includes its qualification as
Manufacturing Engineering Services
Strategic Suppliers (ME3S) for Airbus
achieved in 2014.
THREE
AERONAUTICAL
ACHIEVEMENTS
AT CT IN 2016
index5 The CT Engineering Group
REPORT
This milestone
consolidates the
strategy of the
company to be
present in all areas
of engineering
1 In May, Airbus Group renewed the rating of The CT Engineering
Group as Engineering Strategy Supplier (E2S). The evaluation
process measured, among other categories, positioning, busi-
ness strategy, rate of quality of projects and services as well as
KPI’s. The result was very satisfying for CT. Airbus Group told
us that CT is located within the top five.
CT excelled in the evaluation carried out by the Airbus Group
steering committee (Airbus, Airbus Defence & Space and Air-
bus Helicopters). Among our strengths was our team of indi-
viduals that surpassed customer expectations by providing
quality and timely services at a good price and with interna-
tional presence.
This rating allows us to be part of a select worldwide club as
engineering supplier for Airbus Group strategy. Airbus Group
granted just 17 global licenses and The CT Engineering Group
has one.
This milestone consolidates the strategy of the company to
be present in all areas of engineering, from analysis require-
ments and product design, through engineering production to
after sales support and maintenance. Among the wide range
of services included in the three-year contract (2016-2018)
are: mechanical design and airframe, powerplant integration,
system engineering, manufacturing engineering, data config-
uration, supportability, GSE, engineering support and service
bulletins.
CT remains one of the leading companies for the provision of
engineering services in areas related to the definition, devel-
opment and post-sales support for all products of the Airbus
Group. This contract will allow the company to consolidate a
strong team of professionals and will put The CT Engineering
Group in a position of great responsibility in the aeronautics,
space and defense sector of the engineering business. A signif-
icant workload is expected in the next three years.
The CT Engineering Group and its national brands (CT Ingenier-
os, CT Ingenierie, CT Ingeneure, and CT Engineering Group UK)
continue providing industrial services and structural engineer-
ing design services.
CT understands the product in its entirety and has been working
with this philosophy to help consolidate a business relationship
with Airbus. Since 1998, CT has been contributing engineering
services to Airbus in its flagship aircraft programs, including
work on the A320, A380, A330MRTT, A350 and A400M. CT
was selected for the first time as an E2S company in 2008,
ENGINEERING
STRATEGY
SUPPLIER (E2S)
which allowed us to work with all compa-
nies within Airbus Group.
The tasks of The CT Engineering Group are
not limited to the design phase. Our work
also encompasses the manufacturing pro-
cesses and helps to design the product
manufacturing strategy. We also perform
engineering activities in the post-produc-
tion phase: such as certification, support
or documentation of the after-sales of the
product. The E2S rating allows us to be
involved in all product stages, giving us
insight into product design and helping
us to offer solutions that can provide sub-
stantial improvements across the product
life cycle.
CT’s re-appointment as an E2S preferred
supplier demonstrates the success of our
consistent strategy of providing timely
quality services. CT is a transnational pro-
vider for Airbus Group and our work covers
a broad range of engineering services uti-
lizing flexibility and technical capacity.
indexThe CT Engineering Group 6
2 Earlier this year, Airbus Defence and Space commu-
nicated with CT about awarding them the MultiCo.
This contract to provide engineering services for Air-
bus Defence and Space is valid for three years and
would ensure an increased workload for CT. In addi-
tion, it becomes an essential way in for the awarding
of the MultiCo in Germany.
The three-year contract (March 1, 2016 - February 28,
2019) covers the outsourcing of various tasks from
30 different departments in Airbus.
For this reason, the MultiCo contract has a large
reach and gathers a large volume of work that touch-
es virtually all areas of engineering that make the
development process of an aircraft. This ranges from
mechanical areas such as structural design, stress
or flight physics to the other related aspects in the
field of software and mission systems, flight tests or
simulation systems.
It has been a long process. CT Ingenieros began
working on it the summer of 2015 with the publica-
tion of its tender offer. In September of that same
year CT delivered the offer. A document preceded by
numerous meetings, presentations and negotiations.
In February 2016, CT Ingenieros received official noti-
fication of the award by Airbus Defence and Space.
Pedro Pérez, Business Unit Manager for Systems
Engineering, says that this process included the
involvement and collaboration of various Business
Units (Stress, Design, Engineering [in Madrid]) and of
the 11 providers who are part of what has been called
‘The CT Engineering Consortium.’ All of them were led
by Business Units from Systems Engineering.
The project involves the provision of engineering ser-
vices in the form of Work Units. A Fixed Price Unit
(FPU) or Work Unit is the predefined work that is
evaluated by our client. In this case, Airbus Defence
and Space described in each Work Unit every job to
develop and deliverables associated with it. CT Inge-
nieros, meanwhile, gives a fixed price for each Work
Unit defined and with this price a catalog of activities
is generated that Airbus Defence and Space will use
throughout the three-year contract.
To illustrate this project, imagine Airbus Defence &
Space defines a Work Unit called ‘Completion of Ele-
ment Manufacturing Diagram’ in which the work unit
describes the type of parts to document, the delivera-
bles and the associated deadlines. “CT would assess
this Work Unit at, for example, 100 Euros. From here,
once CT has been selected as a supplier, Airbus
Defence and Space could ask for 10 of the previ-
ously defined work units and we would elaborate 10
plans for which they would pay us a total of 1,000 €,”
explains Pedro Pérez.
In the MultiCo contract there are a total of 30 cost
centers involved and CT Ingenieros has been select-
ed to work in 18 of them. Each cost center has a
distinct amount of workloads. Therefore, “in reality
CT Ingenieros is enabled to work in more than 80%
of the overall work since we have been selected in 9
of the 10 largest cost centers,” says Pedro*.
This contract is important for CT as it represents an
important part of the workload for Systems Analysis
at The CT Engineering Group. “Additionally, it consoli-
dates us as one of the two largest companies in this
type of global work for Airbus D&S in Spain and con-
veniently positions us to face the German MultiCo”,
comments Pedro, adding that “when Airbus Defence
MultiCo
*Cost centers in which CT has been selected
Product and Flight Safety Systems Labs Structural Analysis
CAD Methods, Processes and Tools Mission Systems COMMS Systems Integration
Avionics and Electrics Flight Tests and Operations Mission Support Systems
Air to Air Refueling Aircraft Development Flight Tests CLAEX Support
Flight Physics Aircraft Acceptance and Delivery UAS Ground Station and Avionics Systems
Systems Support Structures Design Simulation Systems
170 fellow
employees of
CT Ingenieros
are working on
projects derived
from MultiCo
index7 The CT Engineering Group
3
and Space needs a job completed, depending on the
type of work required, this is assigned to CT Ingenieros
or any other company in the consortium according to
certain criteria of availability, technical suitability, etc.
Once the work is completed, CT Ingenieros invoices
customer Work Units corresponding to the contracted
amount and we pay our partners accordingly.”
CT Ingenieure has been selected for MultiCo in Airbus
Defence and Space Germany in three specifications. As
of now The CT Engineering Group is the preferred sup-
plier for engineering services in Germany in the scope
of military and combat aircrafts. “This selection repre-
sents a new step in the development of the CT Group in
Germany and will give us the opportunity to consolidate
our presence in Airbus Defence and Space”, points out
Francisco Marín, Country Manager in Germany and Key
Account Manager for Airbus.
170 fellow employees of CT Ingenieros are working on
projects derived from MultiCo. These activities are con-
ducted under the supervision of Miguel Montoya, who
has been appointed project manager. The work gathers
together highly diverse areas of engineering. For this rea-
son, CT Ingenieros is responsible for leading a consorti-
um (The CT Engineering Consortium) in which two stra-
tegic partners participate (Centum and Temai Engineers)
as well as nine specialist companies (Accenture, C-ITD,
DIP, Defensya, GMV, ICEMM involved, Orbital, SERTEC
and Theralabs).
The work derived from MultiCo is predominantly based
at Airbus Defence and Space in Getafe although there
are also tasks performed in Seville (approximately 2% of
the work). “However, the trips are all very common in this
type of activity, we have engineers continuously traveling
to different sites of Airbus in Europe (Toulouse, Hamburg,
Munich, Bristol) and other locations in client countries or
those made flight test campaigns,” Pedro affirms.
In short, the MultiCo strengthens the position of The CT
Engineering Group as a supplier of engineering services
for Airbus Defence and Space.
TECHNICAL
SIGNATURE
DELEGATION
Technical signature delegation is a very impor-
tant strategic step. Signature Delegation was
a mandatory requirement to be kept within the
short group of E2S strategic suppliers for Air-
bus. During the TDCA (Technical Development
Capability Assessment), that started back in July
2015, several Departments and Business Units
worked closely together resulting in the effective
Signature Delegation in some WP (work packag-
es) from Systems Engineering.
In parallel, we have caught the eye of Airbus and
were granted with a Signature Delegation in oth-
er areas, like Design and Stress. With this, The
CT Engineering Group gains both independence
and responsibility, since we are now allowed to
issue and check technical contents on behalf of
Airbus. This delegation is solid evidence that our
organization is robust, reliable and transnational,
fulfilling all international standards and require-
ments.
indexINTERVIEW
Tell us who you are?
I am Diego Jiménez, and I joined
CT Engineering Group in April
2016. Further to my position
as Internal Auditor, where I
perform auditing tasks for CT
Engineering and CT Solutions;
I am actively involved with the
harmonization of Accounting
and Financials in the various
countries where we operate. Finan-
cial Strategy has become also part
of my objective. My job is to give the
Advisory Board an overall view of the
economic situation of the CT groups.
What do you do?
With my experience in the field, I gen-
erate a periodic analysis report of key
financial indicators showing underes-
timated opportunities of improvement,
and the areas of risk
that might jeopardize
the performance of
the group.
I help to manage risks
and to control certain
non-financial process-
es in order to ensure
that all issues affect-
ing the survival and
prosperity of the com-
panies are taken into
account. I provide the
Board, and other inter-
ested parties, with
the evidence that the
business is managed
effectively.
What did you do
before joining The CT Engineering Group?
After several internships in consulting com-
panies and banks, I started working for PWC,
one of the “Big Four” auditing and consulting
companies in September 2007. There, I had
the chance to understand how companies
perform, from the ground level up to man-
agement. I have audited various industries
including companies such as PSA Peugeot,
Aciturri, Bosch, and more.
After five years working at PWC, I was asked
to join General Dynamics, the world’s third
largest multinational conglomerate in the
Defense Industry. I was a Senior Business
Analyst and the right hand of the CFO for five
years, the last of which I was selected to
join the “high potentials” talent development
program. While at GD; I was responsible of
controlling and reporting key financial met-
rics at the European Headquarters, located
in Madrid, to the USA where the Corporate
Headquarters are located.
What is your background and education?
Born and raised in Madrid, I am married to
Gadea and we have a one-year-old daughter
named Olivia. For the last eight years, Gadea
has worked at Manos Unidas, a worldwide
NGO, managing development projects pri-
marily in Asia and Africa.
While I was in High School, I had the chance
to live abroad–one year in Dublin and one
year in Cleveland, Ohio. Later I studied
Finance Administration at Carlos III Univer-
sity in Getafe. After several years working,
I completed an Executive MBA at IESE Busi-
ness School, which gave me a perspective of
how companies and their individuals behave
from a management point of view.
Someone has told us that you are
nature lover, is that right?
I am passionate about the countryside, and
every weekend available I like to go there
with my family, breathe in the fresh air, and
escape from the traffic jams and the busy
city life. This is how I press the “restart but-
ton” and am able to start Monday full of
energy.
I am overwhelmed by how the CT family has
welcomed me, so I can only hope to give
back to this new family as soon as possi-
ble. To do that, I will work hard and with a
team spirit in order to be integrated into
this great family.
DIEGO
JIMÉNEZ
Finance & Strategy Manager
in The CT Engineering Group
My job is to
provide the
Advisory Board
of the economic
situation at
the company
The CT Engineering Group 8
index9 The CT Engineering Group
NEW
ENERGIES
AT CT The CT Engineering Group continues to expand its
range of services with the opening of the Electrical
Engineering Business Unit in April 2015. This team will
develop electrical engineering projects and aims to
provide internal services to other business units in all
things related to electrical engineering.
They made their entrance into The CT Engineering Group as a group determined to
continue providing electrical engineering services of the highest quality. They immedi-
atley fitted into the work climate and brought with them a repertoire of good practices
for the company. “The stability and security at CT gave us a good impression because
we only had to worry about working,” said Asier Gutiérrez, Business Unit Manager.
The group also brought with it a portfolio of clients who rely on their services. Their
experience and mutual understanding makes the team work like clockwork:
engineering services completed in proper time and with excellent quality
to meet customer needs and gain their trust.
Since then, the Electrical Engineering Business Unit has been con-
solidating projects in the electricity sector, both in the transmission
and distribution market as well as in power generation. Many of the
projects the business unit is involved in are turnkey projects. The basic
engineering is done from the beginning of the project to its final instal-
lation. “One of our services that differentiates us from the rest of the
business units is our project commissioning. That is, our BU employees
working in facilities around the world,” says Asier.
One of our services that differentiates
us from the rest of the business
units is our project commissioning
REPORT
indexhave incorporated the handling
of the latest CAD / CAM technol-
ogy that allows them to optimize
working time and be more effi-
cient. “Our main goal is to make
our customers more competitive
because our engineering work is
oriented toward increasing our cli-
ent´s efficiency and allowing them
to differentiate themselves from
their competitors,” says Asier.
From CT´s office in Getafe, the
base of its operations, its portfo-
lio of clients and projects increas-
es. Ongoing projects such as ITER
and ST Wikinger are already part
of its customer base of engineer-
ing services. In an initial phase
is a project with Tesla Motors,
an American company of 100%
electric cars. “We will participate in the engineering design of
the transformer and electrical connections for the Tesla super-
charger,” Asier commented.
The team´s functionality allows them to establish collabora-
tions with the BU Industrial Plant team, who emerged the first
collaboration in a petrochemical project, and make offers with
the other teams, for instance the team in Bilbao, led by Diego
Pacheco, and with the Architecture, Engineering and Construc-
tion BU led by Éber Rueda. “We want to establish synergies
with other units in everything related to electrical engineering:
electrical instrumentation, manufacturing of electrical enclo-
sures in other projects, calculations of consumption, etc.,”
states Asier. The electrical engineering team allows The CT
Engineering Group to expand their catalog of engineering ser-
vices and enhance our competitiveness in technical offers.
Recently, Joan and David Piedrafita have joined the team,
which will allow us to participate in projects for alternators
and engines. One of their strengths is the manufacturing of
excitation systems. These final products require a high degree
of R&D to achieve a high performance at a lower cost.
The next steps for the BU are to focus on identifying new mar-
ket niches with customers and collaborate with them to meet
new needs. For instance, they have considered remote control
engineering in renewable energy. What is clear, however, is
that this “energy” will acquire an orange and white tint, indicat-
ing that this will stay lit for a long time.
The Electrical Engineer-
ing Unit has the ability
to perform complete pro-
jects, both nationally and
internationally, including
engineering design, instal-
lation, design manufac-
turing of electrical enclo-
sures and commissioning
of high voltage (HV) and
medium voltage (MV) elec-
trical substations. These
facilities may be either
Air Insulated Substation
(AIS) as Gas Insulated
Substation (GIS). “The
difference is that the AIS
components are uncovered and outdoors
as opposed to the GIS components which
are within tubes that contain a sulfur
hexafluoride (SF6) gas which allows the
distance between the components to be
shorter because the gas functions as
insulator and the substation is more com-
pact,” explains Asier.
The Unit´s portfolio also includes engi-
neering services for the sector of renew-
able energy such as hydroelectric plants,
as well as for high power services, such
as mini power plants and offshore wind
farms.
The Wikinger offshore windfarm is being
developed by Iberdrola in the Baltic Sea.
CT Ingenieros has participated in the con-
struction of substations to monitor the
installation and commissioning made
Navantia shipyard in Cádiz (Spain). This
first phase ended in July and since Sep-
tember they have been working on the
commissioning of the Wikinger offshore
windfarm in Germany, where Carlos de
Castro is now stationed.
The Electrical Engineering BU shares with
other business units of The CT Engineer-
ing Group their commitment to innovation
and adaptability. In their daily work they
Our main goal
is to make our
customers more
competitive
The CT Engineering Group 10
index11 The CT Engineering Group
ITER is one of the most ambitious energy projects in the world today. It
will be the first fusion device to maintain fusion for long periods of time
and to test the integrated technologies, materials, physics regimes nec-
essary for the commercial production of fusion-based electricity. ITER
(the Latin word for the way) is currently under construction in the south
of France. Seven members support this international project: China, the
European Union, India, Japan, Korea, Russia and the United States. They
have pooled their financial and scientific resources to build the biggest
fusion reactor in history. ITER will not produce electricity, but it will resolve
critical scientific and technical issues in order to take fusion to the point
where industrial applications can be designed.
Since July 2015, the Electrical Engineering Business Unit has been work-
ing with Siemens and Ferrovial on the ITER Project (180-hectare site in
Saint Paul-lez-Durance, southern France).
The CT Engineering Group started doing the supervision of the existing
engineering on the 400 kV and 22 kV pannels of the American part man-
ufactured by Siemens and received by ITER to install them in their substa-
tions. Ferrovial is in charge of the integration jobs and reports to Siemens
Spain for the revision of the pannels. The CT Engineering Group is the
supplier of the study. Ferrovial later expanded the work of Siemens/CT to
examine the 6.6 kV pannels of the American part (PBS43). “Our thorough-
ness in our work has allowed us to establish ourselves and get better a
position than other companies that have been working longer for ITER,”
says Raúl López Seva, engineer and head of the ITER project. In fact,
ITER congratulated The CT Engineering Group for the quality of their work.
This project has opened new doors and has allowed Ferrovial/Siemens
to return to commission new jobs. The team has increased their scope
and they are now working on the complete integration of all the different
parts (400 kV, 66 kV and 6.6kV) for the other big substations of the ITER
project: the Chinese part (PBS41).
ITER: THE
BIGGEST
FUSION
REACTOR IN
HISTORY
indexThe CT Engineering Group 12
INTERVIEW
PHILIPPE
SANTOS
Business Manager for Manufacturing
Engineering in France
Born and raised in Paris, Philippe
Santos, Business Manager for
Manufacturing Engineering in France,
wanted to discover other world,
emulating the adventurous spirit of his
parents who embarked on a journey
from Galicia to Paris during the 1950s.
He has worked in France, Spain and
Morocco where he made many new
friends that he is proud to still keep in
contact with today. With a keen interest
in communication, he sat down with CT
Magazine for a quick interview. While
being quizzed, he told us of his job as
an editor of an internal magazine “Good
News”, which shares news updates
within their Business Unit.
index13 The CT Engineering Group
INTERVIEW
How did you get involved in CT Ingenierie?
In 2012 I opened my consultancy company. Before that, I worked in
Madrid and met many businessmen; among them were Jesús Prieto y
Vicente Egea. Later, they got in contact with me to discuss how to devel-
op the business fur-
ther from their loca-
tion in Toulouse.
For two years I was
a consultant in con-
tact with Vicente
and with Francisco
Marín (Curro). In
this period we got
the accreditation
to work with Airbus
Helicopters in Mar-
seille. After getting
accredited with
ME3S, they asked
me to form part
of the staff and I
assumed respon-
sibility as a manu-
facturing engineer
in France. I liked the mentality and the personal treatment from Jesús,
Vicente, Curro, Ignacio López, Cristina Raso, Pedro Pérez, Ana López,…
So I accepted the offer and began working for CT in July 2014.
After more than two years now, how is the experience going?
It is very intense and there is a lot of work. We opened Nantes and
new businesses in Toulouse. But I undoubtedly appreciate the trust and
autonomy that the people at The CT Engineering Group give to us. This
is what CT does differently from other companies. Here, we work based
on trust, and that translates into happiness and excitement.
What was your introduction into the working world?
I started working in Paris at a company called Labinal (Safran), working
on a harness for motors in airplanes, cars and tanks. After that I was in
Dassault and in Assystem as a manager for the electrical engineering
department in France for 12 years. In 2000, Assystem, together with
Snecma (a company that manufactures airplane motors), were looking
for a General Manager to open their first office of aeronautical studies
in Morocco. I accepted and left to Casablanca for four years to work
on everything related to airplane compressors. Upon finishing my work
there I had a team of 80 engineers and technicians.
After four years enjoying the great climate, I returned to Paris and thought
that it was the moment to change company. I left to become a managing
director for the south of France (Bordeaux, Toulouse, Cannes and Mar-
seille) in Akka Technologies, and with my family we settled in Toulouse.
This adventure lasted only three years because I did not like the way
they worked. Later on, I took 18 months to help a friend who was presi-
dent of ASTEK that took over the presidency of ASTEK Mecatrocique and
I like manufacturing
engineering because
it is the stage where
you can touch and
smell the product
of various offices (Ales, Toulouse,
Lyon, Paris) who worked for cli-
ents such as Siemens, IRISBus,
MGI, Delphi, Renault VI, SNCF,
RENAULT Trucks, VISTEAO, Meca-
Plast etc….
I wanted to involve myself in aer-
onautical production and I left
for GECI where I worked for 18
months as a manager for Madrid,
Toulouse and Marseille. I was
also in charge of the business
strategy in France. I spent a lot
of time on the airplane and I left
when ALTEN bought GECI.
Why this change towards
manufacturing engineering?
I like very much to see the prod-
uct and how it is manufactured.
The process is much more con-
crete and closer to reality. You
can touch and smell the product,
although it smells like oil!
Why did you decide to study
electrotechnical engineering?
I really like to draw. When I was
young I would take paper and
imagine things. When I started
to study technology, things were
very undeveloped, so I liked to
imagine what I could create with
electrical equipment to take infor-
mation from one point to another
in an airplane.
What hobbies or interests
do you have?
The first is playing rock guitar.
Twice a month I play concerts
and we need to rehearse as well.
The second is playing tennis, or
at least trying to. I like to exer-
cise. And lastly, I like to get on my
motor bike and go with my wife to
the Pyrenees on the weekends.
And of course, my family and
friends are very important to me.
For work reasons I have traveled a
lot and it has allowed me to have
many friends. I am delighted that
my house can be a meeting place
where my friends from France and
Spain can come.
indexThe CT Engineering Group 14
ANALYSIS
These activities are carried out predominantly in Toulouse and in Getafe
by a team of more than 50 engineers, most of them members of The
CT Engineering Group family for many years. Our experts are involved in
the development of new aircrafts as well as the continuous support of
in-service aircrafts.
Support for all the components of the powerplant
The technical studies realized by our teams provide solutions for all the
types of problems related to the physical and functional integration of
powerplant systems in all aircraft interfaces.
The studies for propulsion system integration concern: the engine, the
nacelle, the engine controls and all the systems around the engine
(reverse system, oil system, fuel system,…).
The studies for APU system integration concern: Auxiliary Power Unit
turbomachinery, all the Auxiliary Power Systems components (control-
lers, air intake, starter generator…) and the APS controls.
Studies during all the life cycle of aircraft program
The CT teams support the Airbus by integrating the Powerplant systems
in an aircraft during the entire development phase, support studies
related to the continuous support and the continuous development and
realize technical research studies for new engines.
During the development phase of a new engine our teams ensure the
requirement definitions, specifications, design, development, test defi-
nition and follow-up, certification and industrial ramp-up until series
maturity of the products and their associated components.
In the frame of the continuous support our teams provide answers to
the operators requests, analysis of the encountered problems, identi-
fication of potential solutions to correct in service problems (such as
repairs, interchangeability, technical adaptations, etc.) and other activ-
ities related to continuous airworthiness of the fleet.
In the life of the aircraft, the products and their associated components
evolve due to diverse product improvements requiring a modification.
This is the scope of the continuous development activities of our teams.
The CT Engineering Group experts are involved in several R&D activities
to provide innovative solutions for new engines and new APUs.
POWERPLANT
INTEGRATION IN
AIRCRAFTS
Andrei Andrei
& Miguel Montoya
Since 2011, The CT Engineering Group has been a major supplier for
Airbus for the integration of powerplants into aircrafts; both the propulsion
system integration and the auxiliary power unit (APU) integration.
indexSupport for all the aircrafts produced by our customer
The CT Engineering team have made an important contribution to the powerplant
integration during the development phase on all the aircraft developed by our cus-
tomer over the few last years: A320neo (for the two new engines: one from Pratt
& Whitney and the second one from CFM), A330neo, A350 (for the two versions
A350-900 and A350-1000), A400M.
Our activities related to the continuous support and the continuous development
concernedalltheaircraftsinuse.TheR&Dactivitiesconcernedallthenewengines
and all the new solutions for system and components in the powerplant scope.
A teamwork success for a transnational project
This project is a very good example of how synergies and working in close collab-
oration within The CT Engineering Group leads to success. Systems Engineering
BU in Getafe and Systems Engineering BU in Toulouse have worked together on
this project from the beginning and continue working together efficiently.
When these activities started in Toulouse, the French
team had no real expertise in the scope of the pro-
ject. The Spanish managers helped the French team
from the beginning. Spanish engineers, experts in
Powerplant specific scopes trained and worked with
the French engineers to find solutions to the technical
problems and challenges of the new activities. Some
of the Spanish experts that helped the French team to
start are still members of the French Powerplant team.
Talent and expertise of each engineer in our team pro-
videdsolutionsformanytechnicalproblems.Teamwork
and collaboration was the key of our success: The CT
Engineering Group contract with Airbus in the Power-
plant scope has been renewed until end of 2018!
These activities
are carried out
predominantly in
Toulouse and in Getafe
by a team of more
than 50 engineers
15 The CT Engineering Group
indexThe TC Engineering Group 16
A COMPARATIVE
DIFFERENTIATION.
THE ROLE OF A
PERSON IN CT
Vicente Egea,
General Manager
Vicente Egea, CT’s General Manager, looks at the
challenges and solutions as to what allows the company
to set itself apart from other companies in the sector in an
increasingly competitive market.
OPINION COLUMN
index17 The CT Engineering Group
The world around us is boiling. Once someone comes up with an innovative idea and launches it to
the market, hundreds of companies soon appear offering similar or even improved products. Differ-
entiating ourselves from the competition is becoming increasingly difficult.
In this environment, more and more companies choose to differentiate themselves not so much in
what they do but how they do it. There are very few companies with the ability to maintain an inno-
vative product or service for a long period of time that differentiates them from their competition.
However, copying the way that companies provide their product or service to market is not so easy.
And this is a significant competitive advantage that customers appreciate.
For us in CT this trend is not new. In fact, most of our history has been linked to markets where the
differentiation between us has not been in what type of services we provide. If you compare the port-
folio of services we offer with those our competitors do, you will see what I mean. There are no major
differences. Therefore, since our beginnings, we have tried to compete
by differentiating how we offer these services. The result is that CT has
a certain character that our customers and people who work for us here
recognize as our own.
These are the traits with which we have managed to differentiate our-
selves from our direct competitors. For example, our customers appreci-
ate that CT employees remain with the company for a long time. When we
go to a client to provide a service and do a good job, they rely on us for
the next one. More often than not, they ask us if the employee still works
here and in many cases find an affirmative answer. Once we know what
the client values - in this case employee longevity - we implement operational processes that make
sure this is achieved. We always try to take care of people who work with us with concrete and various
measures to help them. Examples of this include flexibility in scheduling, work environment, transpar-
ent information and fair treatment.
Managing to differentiate a company in the how is just as difficult as managing to differentiate a
company in the what, because the way to achieve both of these goals relies on both the company
procedure and the people involved. That is why people are essential in this scheme. No matter how
well established the procedures are, if the person who is carrying them out for client does not do it
properly (understanding properly as representing the sum total of all the attitudes and values of the
company that the customer appreciates), it becomes impossible to effectively differentiate ourselves
in the how. The sum of people and processes is therefore the key to effective differentiation.
Consider another example. Another attitude highly valued by our customers is that we are a pleasant
company to work with. If the customer needs something, we adapt. We try not to create conflict or
customer problems. We work in anticipation of our client’s needs and make life easier for the client.
Can we aspire to differentiate even further? Of course. But this requires that people in contact with the
customer, from the General Manager, through the Project Manager and Engineer or Technician involved
in the project, have this attitude of helpfulness, flexibility and willingness to iron out conflicts that may
arise. In short, to propose solutions and to foresee and mitigate the problems that will may arise.
The next question is how to get people to adopt this behavior? Not one, not 50%, but the vast
majority. Therein lies the real difficulty in how to differentiate the company –having the vast majority
of employees behaving like a single individual. Although
there are no magic recipes, the first thing to do is to
communicate very clearly what those behaviors are that
we ask of our employees, making it clear that it is impor-
tant for the success of the company. In addition, we
must develop internal procedures that are in line with
our intended goals. An example of this is our personality
test that helps us select people who have a natural incli-
nation to help others.
Finally, it is essential to keep all this in mind on a daily
basis. This applies to new employees and as well as to
the rest of us, since this is the only way for customers to
perceive us as different and therefore ensure their loyal-
ty in the future. So to all of you and myself included, this
article is a reminder for us to maintain the values that we
should hold as a company.
The sum of people
and processes
is therefore the
key to effective
differentiation.
Since our inception,
we have tried to
compete by differen-
tiating how we of-
fer these services.
indexThe CT Engineering Group 18
FRANCISCO
MARÍN
Country Manager of CT Ingenieure in Munich
After several years working in France, Francisco
Marín moved to Munich to become Country
Manager of CT Ingenieure. His main goal is to build
our name in the country, working together with site
managers to reach a critical mass of people and
businesses in the coming years.
“When I started working for CT I
didn´t know what I was going to
do”. It was April 1998, and Fran-
cisco Marín, who we know as
Curro, had started working on
numerous projects. In a calm and
a steady tone, he recalls the challenges he overcame after crossing the Pyrenees to
launch CT Ingenierie.
In June this year he relocated to Germany as Country Manager for CT Ingenieure. 18
years after joining CT, his statement “I didn´t know what I was going to do” had under-
gone a metamorphosis and had become an important part of the international growth
of The CT Engineering Group. Curro talks to CT Magazine from his office in Munich.
What are the next steps for CT Ingenieure?
Most importantly, the next steps will be trying to coordinate our efforts and establish
priorities for organic development as well as for possible acquisitions. Our work with
Ralph Unglauben (Business Unit Manager [BUM] in Southern Germany) and Martin
Henne (BUM in Northern Germany) is fundamental. Fortunately, in Germany we have
around 20 employees and we are surrounded by people who know the particularities of
the country and the engineering sectors.
Work hard,
be trustworthy
and delegate
are the key
strategies
index19 The CT Engineering Group
Is this assignment to CT Ingenieure yet
another challenge in a life full of challenges?
It is a change both personally and professional-
ly. It consists of doing what was done in France
in 2009 but in a different environment. It is a
new culture, a new language and another man-
ner of conducting business. On the family level,
my wife and kids have to make changes to their
entire life: moving to new country, making new
friends, learning a new language. I know it will
be pretty difficult for a couple months before we
are able to adapt.
What are the sectors and projects
that CT Ingenieure is immersed in?
In Germany we have three avenues of develop-
ment. The first is in Aeronautics where we work
in three areas: in northern Germany (Hamburg,
Bremen and Stade), with Airbus Civil, in south-
ern Germany, with Airbus Defence and Space,
and Airbus Helicopters, and the third, related to
the companies and factories of the aeronautic
sector and which demand engineering services,
like in the case of Premium AEROTEC.
The second avenue of development is in the
automotive industry, which is very important in
Germany. We hope to have many opportunities
although at the same time it is difficult since it
is a mature sector. Nevertheless, in the south of
Germany we have contacts with Audi, BMW, and
more in north with Volkswagen and Mercedes.
With Audi, I think the help of Xavi Fernández
from Barcelona will allow us to create synergies
between Spain and Germany.
Furthermore, we must focus our efforts in find-
ing engineering companies that want to inte-
grate with CT as a method for development with-
in the automotive sector.
Finally, the third avenue of development will be
the search for synergies within the rail and ener-
gy sector, areas in which we have expertise in
and markets in Germany that we can tap into
and apply the concept of Nearshore (part of the
job done locally and part of the job done remote-
ly from Spain), which we already do for the aero-
nautical and automotive sector.
Did you imagine that you would have
gotten this far when you started?
Absolutely not. When I entered in CT I had just graduated
from the university. It was my first job and I did not know
anything about the company when I started. Also, the
department of aeronautical engineering was just starting
in CT. I entered without knowing what I was going to do or
how I was going to do it.
How did the move to Toulouse come about?
TIn 2009 we made the move to France crossing the Pyre-
nees. The experience was both enriching and difficult at
the beginning. We decided that CT should have presence
outside of Spain (we were only present in Spain and Por-
tugal) due to being selected as an E2S company in 2008
for Airbus Group. We realized that if we want to contin-
ue taking part in this list, which renews every two years
approximately, and continue growing as a company, one of
our obligations was to be present in those countries where
Airbus locations were. Given that there is a large Airbus
site in Toulouse, we decided that the first office abroad
should be there.
In 2009 I began to travel there every week to look for
opportunities to develop the business. That summer I
moved there with my family. I was there for seven years
and it was a very rewarding experience, although I remem-
ber that the beginning was difficult. Sometimes, it was
frustrating because you would knock on many doors but
the business opportunities were scarce. The first contract
came in the training area and it was a big surprise.
Any advice you can bestow upon us
given your worldly experience?
The key lies in working hard and above all continuing to
apply our culture of trust and delegation, which are keys
of success of The CT Engineering Group. My managers
have trusted me and delegated authority to me during
these 18 years and I am completely convinced that these
two concepts will be what allow us to keep growing as an
organization.
INTERVIEW
“Commitment, boldness and non-conformism.”
This is the virtuous triangle that Curro draws to
describe Ralph Unglauben and Martin Henne.
“Unglauben and Henne have worked hard to develop
CT Ingenieure. They were courageous to accept the
challenge of developing an emerging company in
Germany and they were mavericks because both
had come from big companies,” argues Curro.
Francisco Marin´s first steps in CT were as an Engineer
in the area of structure designs and he steadily began
assuming responsibilities in projects. “I was the director
of projects of Belly Fairing of the A380, of the Falcon F7X
or the A330 MRTT and during couple years as BUM in the
non-aeronautical engineering sector.” In Spain he lived
through the business growth at CT, its development of
various engineering sectors and the relocation of its offices
until finally settling in Getafe.
indexThe CT Engineering Group 20
STANISLAS
CHOPPIN
Country Manager in France
Stanislas Choppin recently joined CT Ingenierie as Country
Manager. His experience, his forward thinking and his
familiarity with the business are just a few of his many
qualities. Stanislas joins at an important time as The CT
Engineering Group is diversifying its practices to maintain
long lasting business relations with clients.
index21 The CT Engineering Group
How relevant is this new role at The
CT Engineering Group for you?
Replacing Francisco Marín after seven years during
which he developed CT Ingenierie with great suc-
cess is definitely a challenge for me. CT Ingenierie
is currently working mainly for Airbus Group. In the
next three years, the strategy I want to implement
relies on diversification: we must be able to have
at least 50% of our activity coming from new cus-
tomers such as STX (marine construction compa-
ny and services fleets), DCNS (a French defense
naval company), Renault, Alstom, GE (an energy
group), CEA (French Alternative Energies and Atom-
ic Energy Commission) and CNES (Centre National
d’Etudes Spatiales). We also need to work upon
developing our activity in Paris and the surround-
ing area, as well as reinforcing our presence in the
west of France.
As Country Manager in France, what
objectives do you have?
Vicente Egea has given me three objectives to reach. The
first one revolves around finding and buying small and mid-
sized French engineering companies working for the naval,
industry, automotive and railway sectors, ideally located in
Paris and in the west of France. The second one consists
of working with the French site managers (SMs) and all the
French Business Unit Managers (BUMs) to open doors to
new customers and being able to start working successfully
for them. The last objective is to supervise the three SMs in
order to define and coordinate the sales action plan, as well
as ensuring all the reporting at The CT Engineering Group
level.
What is your experience in CT?
After a few months spent in CT Ingenierie I can say that I
have never had, in all my working life, such an easy integra-
tion process. While meeting all the CT employees in Spain
as well as in France, I noticed they share a real enthusiasm
about the CT values. Furthermore, I also feel that they truly
understand and believe in the French strategy defined by The
CT Engineering Group.
When you came to CT for the first time, did you imagine
the growth of the company and your current job?
Most of the European engineering companies have gener-
ated growth these past years. For me, the main fact that
characterizes CT is the level of satisfaction obtained by our
teams in the field working for our customers. Thanks to this
high level of satisfaction, CT has succeeded in generating
trust and in building long-term relationships with its custom-
ers. Our growth is the result of these daily step-by-step rela-
tionships built by our BUMs for years with our customers.
As CM France, I must, with the SMs and BUMs, be able
to achieve the same result with new customers. This would
create opportunities for French CT employees to evolve and
develop through new missions, and for our BUMs to recruit
new CT employees in these new sectors.
INTERVIEW
CT values must
continue to
make a differece
in a competitive
environment
What are the main projects you are
involved in and represent the best of your
professional skills and personal focus?
First of all, in 2017, we will start working
with STX, CT Dinain and CT Ingenierie team
at Saint-Nazaire. We will also start our first
projects with CEA and CNES. Lastly, we will
buy a small or mid-sized French engineer-
ing company with a lot of potential.
What are the main values and
capacities in CT Ingenierie?
I think the high level of satisfaction we
have achieved with our current customers
shows that our employees have the poten-
tial and customer-focused attitude to bring
our company to new heights. The company
organization and the values around which
CT Group has been built are strong; they
have made and must continue to make a
difference in an environment as competi-
tive as ever.
Could you give any advice to
improve and to manage the
engineering tasks to do?
I believe that, in order to keep our level
of growth and start working with new cus-
tomers, the CM and the SMs must meet
one new customer every day. Simultane-
ously, it is important that the BUMs take
more of their time to find and recruit some
new profiles adapted to our new needs.
The securing of new customers as well as
of the right talents to fulfill the needs of
these customers, will allow CT Ingenierie
to achieve its strategy.
indexThe CT Engineering Group 22
Víctor Máñez and Alejandro Buitrago Chicharro
INSIDE THE
DESIGN
PROCESS OF AN
AUTOMOBILE´S
“CPU”
Half a dozen coworkers at the Business Unit Engineering Madrid, of which
Ana López leads, have just finished a prototype assembly line design
project for Bosch. The prototype assembly line project is for the automatic
mounting of an Electric Power Assist Steering (EPAS) system for vehicles,
which acts like the CPU control for vehicles.
index23 The CT Engineering Group
Delving into the structure design of the EPAS (Electric Power
Assist Steering) of a vehicle is no easy task. It is a maze of
complex, interconnected and finely detailed structures. It is
a job that requires sophistication, precision and control of
pace–qualities that this project and partnership between The
CT Engineering Group and Bosch provide. The faithful and
effective partnership starting in 2004 has since shared engi-
neering projects for the assembly of all types sensors and
vehicle alternators.
Víctor Màñez I Corbella, project manager and customer repre-
sentative, displays a figure on top of his CPU–the real, phys-
ical structure. The figure’s green color reminds us of another
galaxy. Yoda’s presence not only evokes the memory of a film
franchise (Star wars) but rather is the implicit manifestation
of a working philosophy that permeates the engineering work.
The magnitude of the project that will become “the CPU cars”
covers an inventory of 11 different products. The project deals
with mechanical complexity: grappling with the dimensions
and shapes to reach our goal of cycle time sequencer–the
time it takes to get a piece in and out of the machine–. “We
are in charge of designing almost 80% of the machines on the
test station line,” says Víctor.
“If you add the 11 items to the reduced space of the machine
and cycle time sequencer, each item takes 15 seconds,”
says Víctor while hovering his pointer over the 3D image on
his computer. Indeed, it is a customized pointer: an axel with
a gear, guiding CT Magazine’s eyes through the complex func-
tions of the machines.
The engineering design of this project has been performed
in 3D with Inventor, a mechanical design software. Each
machine consists of several hundred manufacturing parts
that are each individually designed. To optimize this process,
the machine, small in size (1.5 x 1.5 meters), is divided into
10 subsets that allow them to structure the project and to
map out their viability.
“Robert Bosch’s testing line has eight machines, and of those
we have done six,” says Víctor Màñez. This testing line allows
any of these machines to mount any of the 11 items available.
Furthermore, the mechanical design work included the real-
ization of a series of tasks: an electrical test that allows
each of the machines that form the products to be tested; a
series of heat tests in the oven, where they proved that the
pieces can tolerate up to two minutes at a temperature of
90 degrees centigrade; a transfer station that moves items
from one line to another using two robots; labeling; a pressing
test of the connector pins, whose unit of force cannot exceed
0.98 newton; and finally, robotic simulation of eight stations.
“These machines are capable of high quality and high preci-
sion manufacturing. In fact, the level of maximum deviation is
0.1mm,” says Víctor. Better accuracy than the best Hawk-Eye
technology.
REPORT
The project to design EPAS manufacturing
machines began in January 2016 and end-
ed last August. During this period, half a
dozen CT employees have been involved
and have completed more than 800 hours.
A job that has involved both the design of
the lines and support customer designers
to introduce improvements and cost sav-
ings.
“When I joined CT Ingenieros almost 12
years ago I immediately started working
with Bosch,” recalls Víctor Màñez. During
these years he has been the main interloc-
utor with the customer and has assumed
responsibility in project management. Dur-
ing this time he has seen how the map of
mechanical design software has changed–
an important step for the integration of
technology in our workflow. “Leaving Auto-
cad 2D was a useful progression for us.
The test required many hours and now with
3D, the time takes four times less than
before,” he remarks.
The Business Unit Engineering Madrid
develops design projects for Bosch in five
major areas. The two main areas of activity
are the design of USS lines - the parking
sensors that are installed on the bumper
of the vehicle and the PAS lines for the
manufacturing of the airbag door sensor.
These fields work together on almost 90%
of the projects CT performs with this client.
The remaining three activities include
design DESC sensors, sensor for hydraulic
automatic gear shift car; alternators, for
generating current in the car; and design
of pumps gasoline into the tank.
The quality of the engineering, sophistica-
tion and competitiveness of the Business
Unit in Madrid has lead to established
long-term customer relationships and loy-
alty in our services. As Yoda would say,
fixed stoically on the desk: May the Force
be with you.
A DECADE
OF LOYALTY
indexCre100do is not physically present in any business unit,
nor is it part of the portfolio of our customers or suppliers.
But for two years, they have worked side by side with The
CT Engineering Group in the process of development and
internationalization.
“Cre100do has opened our eyes and allowed us focus on
solutions in our process of transformation and growth,”
says Jesús Prieto, president and CEO of The CT Engineering
Group. Visible on his desk are papers and documents relat-
ed to this business program: the best business practices,
success stories and new management approaches.
The inclusion of CT in the first group of companies to be
chosen in November 2014 was a boost of confidence and
pride for a job well done. “It was a surprise,” affirms Jesús
and describes the experience as “very positive notoriety
that gives us the opportunity to meet other entrepreneurs
and executives from dynamic and growing businesses”.
For the last two years, Cre100do has worked with The CT
Engineering Group, showing us other forms of manage-
ment, which has led to the implementation of branding,
talent and multiculturalism projects. “This has allowed us
to learn new ideas and approaches, especially in business
management,” says Vicente Egea, General Manager of The
CT Engineering Group.
November 2014 was an
important date for The CT
Engineering Group, a turning
point for further growth in their
internationalization process.
Valuing the strength, ambition
and the near shore model of
the company, the Spanish
business program Cre100do
decided to join us in our
transformational process.
TWO YEARS WITH
CRE100DO AND PROUD
TO BE PART OF THE
PROGRAM
The CT Engineering Group 24
indexR&D PROJECT
Cre100do is a Spanish
business program promoted
by the Bankinter Innovation
Foundation, the Institute for
Foreign Trade (ICEX) and
the Business Circle. They
contribute to the development
of Spanish production models
to progress them towards
models based on more added
value, more innovation, more
competitiveness and more
internationalized performance
turning 100 companies in
large enterprise models. All
companies participating
in the Cre100do program
turnover between 25 and 250
million euros and belong to
different sectors, such as
food, technology, fashion,
engineering, pharmacy
or chemical industry, and
are based in 10 different
autonomous communities.
Cre100do aims to become a
meeting point and encourage
the exchange of knowledge
and experience of the 100
companies participating
throughout the five years of
the project. This business
transformation program will
continue to accompany The CT
Engineering Group over the next
three years.
“Internationalization means expanding the ecosystem of the
company, which broadens our working environment to a greater
diversity of agents. Internally, internationalization implies the
integration of new cultures that enrich our company. The chal-
lenge is to integrate and act within a shared company culture.
This is an important job for the organization but with big results,”
explains Teresa Saez-Benito, deputy director of Cre100do.
Although there is no magic recipe for big businesses, there are
several common ingredients found in all of them. “What we
value in a company is an ambition for growth and to reach their
potential, with the ability to do so because they are a solid com-
pany with committed employees and satisfied clients, a distinc-
tive value proposition, a shared strategic vision and a success-
ful corporate culture of excellence,” summarizes Teresa.
It is precisely this aspect that makes the difference between
a big company and a great company. “Being a big company
means achieving high turnover figures. Being a great company
means achieving high levels of excellence. Although the terms
are not mutually exclusive, they do not necessarily go hand in
hand,” says Teresa.
Cre100do explains that The CT Engineering Group was selected
because it is an example of a company that has a solid founda-
tion, has ambition and can generate a “drag along” effect for
companies in other sectors through its near shoring model and
its growth plans, which are based on acquisitions of small spe-
cialized companies. “We found their growth plans, based on man-
ufacturing engineering, internationalization and diversification
projects, very ambitious and motivating, and we believe that the
contribution of CT to the program would be valuable for other Cre-
100do companies and other companies in the middle market”.
The CT Engineering Group is firmly committed to maintaining
its identifying traits (competitiveness, innovation, flexibility and
proximity) to develop international projects and new business
lines.
25 The CT Engineering Group
indexThe CT Engineering Group 26
R&D PROJECT
StaGeDis will establish new conceptual designs for a dual-
use starter/generator disconnect system. New generation
aircraft require higher level of electrical power, increasing
weight and volume of the electrical machines. This R&D pro-
ject has been created to compensate the growing weight
and volume of the necessary equipment that is needed to
generate and distribute the electrical energy inside the air-
craft. The project works to evolve traditional generators so
that they can operate as an electrical starter as well and
can eliminate the need for a pneumatic starter system.
The StaGeDis project analyzes, studies and compares the
different technology and architecture that can optimize this
new system in the aircraft. In doing so, the project seeks
solutions to achieve a global reduction in weight and dimen-
sions, an increase in the reliability and security of the sys-
tem and approaches to make the system more easily main-
tainable–thus reducing maintenance time and costs. The
selected solution will carry out a detailed design, complete
with the appropriate definition and methodology for the ver-
ification and qualification tests. The project relies on the
collaboration and wide experience of Indra for the design of
on-board equipment. They have been chosen as a partner
due to their comprehensive expertise in the definition of sys-
tem requirements, system evaluation and system validation.
Due to safety reasons, the starter/generator requires a
disconnection system to protect the machines and engine
gearbox. This disconnection system shall be able to sep-
arate mechanically the gearbox from the starter/generator
with the electrical machine operating whether as starter
or generator. This system will be commanded by an elec-
trical pulse. Different technologies and architectures will
be studied, evaluated and compared in order to define a
proper disconnection system. Criteria of weight reduction,
compactness and conformity with harsh aeronautic engine
environment will be also an important part of the study. The
selected solution will require a detailed design and the defi-
nition and methodology of the verification tests.
StaGeDis has been co financed by the European Commis-
sion through “Clean Sky Joint Undertaking” within the 7º
Framework Programme of the European Union.
StaGeDiS is an innovation
project developed to
complete a conceptual
design for a dual-use
electrical starter/generator
disconnection system to
be installed in the main
engines of an aircraft.
INNOVATING THE
ELECTRICAL STARTER/
GENERATOR
DISCONNECTION SYSTEM
AIRCRAFT ENGINES
index27 The CT Engineering Group
R&D PROJECT
Since 2013, CT Ingenierie has worked in partnership with Stellia Aerospace
and Constellium on the former project FAST (Topological Structure for Advanced
Forward Section). Last year, Ecole Centrale de Nantes joined the project to
further improve the consortium’s capability to understand Additive Layer Manu-
facturing (ALM) applications and limitations.
The DEFACTO project intends to design, develop and manufacture a demon-
stration of A320 forward fuselage section. The project explores breakthrough
design philosophy owing to structural topological optimization. It also aims to
democratize and develop ALM technologies for Aluminum alloys. This project is
founded by DGAC.
CT Ingenierie committed to this project in order to gather knowledge and devel-
op tools for topological design methodologies. The company is convinced that
topological optimization will provide competitive and cost effective design solu-
tions to customers. The benefit of topological approach was demonstrated
during the FAST project. FAST optimized crossbeams weighing up to 25% less
and are proven to meet the same certification requirements.
The following tasks are required to progress throughout the various design
steps and to achieve the successful development of optimized structures.
The conceptual design starts with the loadcase analysis conducted using the
Global Finite Element Model (GFEM) related to certification. It allows determin-
ing whichever sizing cases are necessary to optimize the structure. Further
work is required on the selected ones to ensure no bias can be introduced by
the loading application.
The actual optimization is conducted on a Detailed Finite Element Model
(DFEM) which includes only the target area. This area is defined as uniform as
all coarse elements from GFEM are replaced with small elements. A density
ranging from 0 to 1 is assigned to these elements, determining whether they
represent void or dense parts of the optimized structure. One of the DFEM
specifications is to ensure coherence between DFEM and GFEM loaded nodes.
This optimization provides comprehensive material density on the target area
which maximizes the stiffness with a constrained average material density.
The load path identified through the optimization are identified as structural
stiffeners and sorted depending on their relative size. This stage is called inter-
pretation; it ends the conceptual design phase. The interpretation conclusion
is highly dependent on the thresholds selected.
The embodiment design phases shape the stiffeners using parametric optimi-
zation. This optimization sizes the stiffeners depending on the hierarchy estab-
lished in the previous step. The conclusion of the parametric analysis is used
to initiate the detailed design phase.
DEFACTO – ADDITIVE
MANUFACTURING
DEVELOPMENT
FOR TOPOLOGICAL
COMPONENTS
indexThe CT Engineering Group 28
Gerhard Marzinik
(Article published in Aerokurier Magazine)
On the streets hybrid engines are part of everyday life, sparing
the environment from carbon dioxide and fine dust. But what
use does hybrid propulsion have in aviation? Fine dust and car-
bon dioxide are not relevant factors.
For the Spanish start-up AXTER Aerospace the safety “plus”
that an additional electric drive can offer was the decisive argu-
ment to develop a hybrid propulsion for the aviation sector. The
first model, the AX-40S with a 30 kW (40 hp) electric motor,
developed for the Rotax Motors 912 and 914, provides the test
plane, the Sport Aircraft Tecnam P92J equipped with lithium
batteries, the option of seven minutes of purely electrical pro-
pelled flight. In a previous version for a client, the Technam
P2004 with a variable pitch propeller even achieves 12 minutes
of electric propelled flight in the event of engine failure.
What is this good for? After having worked for Airbus projects for
8 years, the two founders of AXTER, Miguel Suárez and Daniel
Cristóbal,investigatedthestatisticsofaviationaccidentsbefore
embarking on the venture of hybrid propulsion. The aeronautical
engineer Miguel Suárez and the electrical engineer Daniel Cris-
tóbal wanted to improve the sad annual average of 71 deaths in
Europe and the USA due to inflight engine failure with their new
development. At present the hybrid engine provides the pilots
with a little breather after the shock of an engine failure, and
enables them to act stress free and gives them time to think.
The Spanish government considered the project worthy of
financing and contributed with initial funding. The CT Engineer-
ing Group in Madrid-Getafe, which has deep roots in aviation,
providing engineering services for Airbus, Dassault and ATR,
entered the project as a strategic partner. Jesús Prieto the aer-
onautic expert and CEO of the 1500 strong
company provided AXTER with FEM and
structural analysis programmes. The Uni-
versity Carlos III in Madrid contributed with
their know how in the design of the power
electronics.
The already patented hybrid system of
AXTER is the first step towards further and
more powerful systems and a final objec-
tive of purely electrical propulsion. They now
aspire to obtain a licence for Experimentals,
Light Sport Aircraft (LSA) and Very Light Air-
craft (VLA) and even of airplanes of the cat-
egories CS-23 and CS-25. VLAs which have
a maximum take-off weight (MTOW) of up to
750 kg shouldn’t have a problem with the
additional weight of a hybrid system.
The AX-40S was developed as the more
manageable entry level variant for the use
in the LSA- and Experimental sectors where
Rotax motors are very common, and it has
now been approved by the Spanish Aviation
Authority.
The system can be mounted on four points
of the Rotax 912/914. The structure is part
of the system. The crankshaft is connected
to the electric motor through an automat-
ic working coupling, produced specially for
AXTER by Endrax in Slovenia. The electric
Increase in power at the start and a fully electric operation
in case of failure of the piston engine - that is what AXTER
Aerospace promises with the hybrid engine AX-40S.
AXTER´S HYBRID
AX-40S PLANE.
MORE POWER,
MORE SAFETY
index29 The CT Engineering Group
REPORT
motor can be switched on at will and will work decou-
pled from the piston engine in the case of engine fail-
ure. The batteries recharge themselves with the fuel
engine, provided that the electric motor was used for
the start and initial ascent.
Miguel Suárez demonstrates the use of the AX-40S
in Casarrubios del Monte, a popular place for the gen-
eral aviation scene south west of Madrid, with a 950
metres long asphalt runway. Comparing take offs on
the 2050 feet elevation site at 35 degrees Celsius,
typical for Spain in the summer, with and without the
assistance of the hybrid system, demonstrate the
advantages of the e-motor.
In standard conditions, the hybrid engine reduces the
take-off distance of the Tecnam P92J with a maximal
start weight of 600 kg from 200 to 145 metres. In the
high density altitude of Casarrubios the difference is
even more noticeable. Unlike the piston engine, the
electric motor doesn’t lose power in higher density air.
The P92J-Hybrid working entirely electrically still man-
ages to climb 200 feet a minute at a speed of 135
km/h.
The increased performance of the hybrid system at
start and initial ascent is more pronounced in Hot-
and-High-conditions and on shorter runways (high-
er grass, sloped runway …). On the other hand, the
electric propulsion can be used under standard con-
ditions to reduce the power contribution of the piston
engine and thereby diminishing noise emissions. This
way, airfields subject to time restrictions in order to
reduce noise, could be used again.
The Rotax is switched on again while approaching
the runway 26 of Casarrubios. The wildly rugged land-
scape that can be observed during landing is impres-
sive. Should the piston engine fail here, the hybrid
system would allow one to reach the runway secure-
ly. In this case it would be too late for the deploy-
ment of the BRS, due to the insufficient altitude of
the aircraft.
To turn on and connect the electric system one only
needs to turn a knob located on the instrument pan-
el, as long as the main switch is already on. The
display indicates the most important performance
parameters. Various LEDs indicate potential failures.
Large modifications to the equipment of the hybrid
system on the P92 weren’t necessary. The extra
weight of the carrier (0,9 kg), coupling (5 kg) and
electric motor (12kg) along with the controller (6 kg)
and the batteries (20 kg), which are located behind
the seats, compensate each other, thus avoiding the
displacement of the centre of gravity. The new posi-
tion of the propeller, sitting further in the front, didn’t
turn out to have a negative influence in various differ-
ent flying configurations.
It took the AXTER system AX-40S 200 hours in test
flights to get approved, among them flights from
Seville in Andalusia’s 45 degrees blazing heat. The air
cooling system of the electric motor proved its worth.
The AXTER engineers, with the use of the hybrid
engine, have accomplished substantial cost benefits
for flying schools. They consist of savings in fuel and
maintenance costs by using the Rotax less during
taxiing. The electric drive and the coupling are main-
tenance-free. Hybrid pilots will also be popular with
neighbouring residents of airfields since they reduce
the emission of carbon dioxide.
The cost of the complete package, which allows an
easy montage, is assembled in Getafe and currently
costs 18,700 Euros plus taxes and shipping costs.
Miguel Suárez explains that this only covers the pro-
duction costs.
After the development, the certification process and
the production set-up, the focus of AXTER Aerospace
now lies in the commercialisation of the AX-40S. A
second plane is now being equipped for clients. A fur-
ther two are going to be sent to Cranfield University
in Great Britain, where the electric drive will be used
for drone research.
In AXTER, further research and development is being
pursued in parallel to the commercialisation of the
first hybrid package. It’s all about developing a com-
pletely electric drive and finding further uses for the
AX-40S.
Daniel Cristóbal and Miguel
Suárez, Founders of Axter
indexThe CT Engineering Group 30
David Soriano, Antonio Villar
Amador and Alberto Alonso
Martínez were part of the
winning male team for the six
kilometer race –the Carrera de
las Empresas. Fifty coworkers
from CT Ingenieros took part
in the race that weaved its
way through the heart of the
Spanish capital.
David Soriano, Antonio Villar Amador
and Alberto Alonso Martínez
index31 The CT Engineering Group
CT INGENIEROS WINS
“CARRERA DE LAS
EMPRESAS” 6KM RACE
IN MADRID
SPORT SECTION
Excellent results never appear spontaneous-
ly, nor do they come out of nothing. Tenacity,
effort and courage are essential ingredients
that accompany success, whether they be
work, sport or life in general. All personal and
professional growth is born of conviction. It is
self-motivation which unites all of our abilities in
order to overcome obstacles, improve ourselves
every day and become motivated to accomplish
our goals.
More than fifty coworkers from CT Ingenieros
geared up to participate in the race on Decem-
ber 13, 2015. The cold morning came to life with
the starting gun which began the race they had
spent months preparing for. Six or ten kilometers
ahead of them, through the emblematic streets
of Madrid, such as the Paseo de la Castellana,
and Plaza Colón, the square that is named after
the tenacious conqueror Christopher Columbus.
Three of them stepped up to first place: Alberto
Alonso, David Soriano and Antonio Villar. The
team had won in the men’s category for the 6
kilometer race. “We had said goodbye and I was
already leaving. Then I saw the rankings, and
I quickly sent a Whatsapp and a photo of it,”
recalls Antonio Villar, an employee in the Sys-
tems team, when he realized they had just got
first place. “I couldn’t believe it, I thought it was
a joke,” says David Soriano, employee in the
Stress department, when he read the text. The
official announcement arrived a few hours after
‘the third stage’ was finishing.
It all started when Antonio, David and Alberto,
from Customer Services, met at la Carrera de
la Ciencia (Race for Science). There was a good
synergy and Antonio found out that in previous
years the six kilometer races had been “achiev-
able”. “I wanted to try and to see how it would
go for me,” he explains. So he got to work and
convinced David and Alberto to do the same.
Goals are
nor just for
recalling
and leaving
behind, rath-
er they are
the start of
a next step
They, along with the rest of their
coworkers, took part in their first
trials a few months before, apply-
ing patience, effort and tenaci-
ty to each day of their training.
During the previous months they
did extensive physical as well
as technical training, because
“running, although it seems sim-
ple, requires a certain technique
to avoid injuries,” Jorge Fuente,
design engineer at CT Ingenieros,
tells the CT Magazine.
He was in charge of preparing a
training plan for his colleagues.
Qualities such as technical knowl-
edge and dedication were not
unknown to him. “I started doing
track and field in 2000 and con-
tinued to 2012. It was hard train-
ing, six days a week, I shared
the field with an athlete that had
participated in the Olympics,” he
tells us. There were a few months
where the Cerro de los Ángeles
(Getafe) had transformed into the
epicenter of a training philosophy:
running is a gift, and you get what
you put into it.
The race has ended but its goals
remain. Goals are not just for
recalling and leaving behind, rath-
er they are the start of a next
step, which allows us to apply the
training we worked for to tackle
new and important challenges.
Well done to everyone in the CT
team for taking part!
indexThe CT Engineering Group 32
What types of challenges did Ironman Mallorca 70.3 entail?
For me, the challenge of entering the world of the triathlon was an
endurance test. It involved as much completing the race as it did train-
ing in a completely different way than I had ever done before. Running
is something that I am more or less accustomed to, but, although I
participated in the Sertri (triathlon in Madrid) a couple of years ago, I
had not trained for swimming or biking before. Preparing these three
disciplines at the same time was something new, and moreover we
started training in January, which didn’t give us much time.
What type of preparation do you have to do for an Ironman
like the one in Mallorca, on a physical and a mental level?
Since we started preparing for it, we tried to go swimming and running
two days per week and at least take one day to do some biking–at
home on a machine when there was bad weather, or on the weekends
for a longer ride when the weather permitted. With regards to the
psychological preparation, I am not very mentally strong, so I simply
tried to suffer through the training in order to not have any surprises
during the day of the race. During all the sessions in the pool of the
last month I was covering the distance of the race, and for cycling I
trained both the distance and the climbing portion a couple times.
Training to make sure I could do something like this, having already
done something similar before, is what allows me to face new chal-
lenges with confidence.
Did you make any changes (to your calendar, training, sleep
or nutrition schedule) to progress faster for the race?
As we approached the race, the last month we intensified the training
a bit in the sense of not missing any day if possible. For this we had
to adapt our work schedule a bit and reduce our free time. But other
than that I did not make any major changes. My nutritional plan did
not change, I just tried to sleep more during the preliminary weeks to
recover a little better. The week before the race, yes, we rested and
did not train. Better go to the race a bit under trained than to go tired.
Training is
what allows
me to face new
challenges with
confidence
JAVIER
MOLINA
CT Magazine interviews Javier Molina after
finishing the Ironman 70.3 in Mallorca. An
Ironman 70.3, also known as a Half Ironman, is
one of a series of long distance triathlon races
organized by the World Triathlon Corporation
(WTC). The “70.3” refers to the total distance in
miles (113.0 km) covered in the race, consisting
of a 1.2-mile (1.9 km) swim, a 56-mile (90 km)
bike ride and a 13.1-mile (21.1 km) run. Each
distance of the swim, bike, and run segments is
half the distance of that segment in an Ironman
triathlon. The event location, Alcudia, is one of
the most celebrated towns in Mallorca, with
more than 30 km of the coastline made up of
gorgeous, fine sand beaches, steep cliffs and
secluded coves of great beauty.
INTERVIEW
index33 The CT Engineering Group
How were the weather conditions in Mallorca?
Did you expect them as such?
Well the weather was our main obstacle: we had rain, wind,
cold temperatures... We expected that with both the time of
year and the place of the race we would have good weather.
And in fact we actually took some vacation days to relax on
the beach after the race. But the week before the race, the
forecasts warned of bad weather and it worsened as the date
approached.
Precisely because we did not expect it, we did not go very
equipped for those conditions. Personally, I worried about the
biking part since I had never trained in the rain, and the down-
hill parts during the mountain sections of the race troubled
me. Luckily in the end the conditions were eased a little. We
got cold waiting before the start, and rain did not stop from the
time we left the apartment until we returned. But in the end
the conditions turned out to be nothing more than discomfort.
All that remained was to sleep, get up early and
get going, how was the morning pre-race?
Iwasexpectingnottosleepwellbeforetheraceduetonerves,
but the truth is I rested like any other day. The only drawback
was that we did not sleep much that night. I was up at 5:00
am for breakfast and to get prepared, and then suddenly we
were hit with the bucket of cold water that was to go outside
and feel the rain that was pouring. Getting up was difficult of
course, but the nerves wake you up quickly.
How would you describe your adventure in the race?
The worst part was waiting at the starting area. For the swim-
ming part, people had to go in groups according to a set time.
So until we started we spent 40 minutes in the rain and cold
despite wearing a wetsuit. Swimming is what I performed the
worse at, but the truth is that I did better than I expected,
probably because of the help of wetsuit. The main complica-
tion for me was that there were many jellyfish, small and wide-
ly dispersed, so you could not avoid them or ignore them. One
of them stung me in the face, but it was very little compared
with bites suffered by some of the other competitors.
The bike section of the race had an ascent to the port, a
descent and a flat stretch. The three parts are more or less
similarindistance.Theclimbwentprettywell,Ievengotahead
of some people. The same happened during the descent,
because everybody was afraid of falling in the rain. It was dur-
ing the flat stretch where I lost the ground that I had previously
gained. In addition, the speedometer had been damaged by
rain and I had no reference of time. This stretch took me a bit
longer to do, and I regretted not having done more long rides
in training, but I ended up keeping it together well.
The run was the part where I had to suffer.
The first third I did very comfortably, but by
the 8th kilometer the bike part had taken
a toll on me and my legs began to ache
considerably. The last lap felt like eternity,
but at a slower pace I managed to finish it.
There were also many people cheering and
that always helps.
Your final time was…..? Are you
content with the result?
It took me about 6 hours and 35 minutes to
complete. My goal was to finish, so my time,
taking into account the weather conditions,
strikes me as a good result and was more
or less what I expected. Finishing in 6 hours
or less would have been a very good time
for me. Personally upon finishing a race of
this type I always leave thinking I could have
pushed myself a little harder at some point
in the race, or that some aspect of my perfor-
mance needed to be trained a little more...
So I really never leave 100% satisfied since I
always know I could have done a little better.
But given that it was my first triathlon, and
considering how I had trained and the weath-
er conditions, I’m happy with the result.
What are your next challenges?
So far I have not thought of any new chal-
lenges to embark upon. I imagine that when
someone does a half Ironman the first thing
that comes to mind is to do a full Ironman.
But that is something I do not see in my
reach, at least for now. For now, my only
certain goal is to not stop training. I may
slightly reduce the intensity of my workouts,
but I will keep training and try to reduce my
running times, for the 10km to a marathon.
For me it is not so important to train for a
massive goal as it is to be prepared to sign
up for whatever arises, whether it is a game
of paddle or a triathlon. Of course, if there is
group that wishes to prepare for another half
Ironman in the future, I will be there, and try
my hardest to beat my previous race time.
You are now an Ironman finisher.
What is your advice to triathletes
who want to compete in Ironman?
I do not know if I’m qualified to give advice,
because I believe I have strayed considera-
bly from what a real athlete or a coach would
recommend. Simply put, they should try. And
if they can train with people, the preparation
goes much easier. I imagine that someone
who would be interested in this type of race
already has a workout routine, so it is only
taking that one step further. It will be diffi-
cult more or less, but if I could do it, any
regular triathlete can.
indexSPORT SECTION
MISSION
ACCOMPLISHED:
GUILLERMO
PORRERO
COMPLETES
VILLACAÑAS
DUATHLON
Guillermo Porrero is “content” after finishing the fourth Duathlon Cross
Villacañas (Toledo, Spain) for beating his time of the last year’s edition.
“Mission accomplished”, he says proudly. And no wonder, because Vil-
lacañas is his hometown. The duathlon was held on September 11 and
had a distance of 27.5 kilometers (5 km race walk, 20 km mountain
bike and 2.5km run) in which more than 100 athletes participated.
The terrain of Villacañas, being located on the side of the mountain,
leaves little room for a flat course design. “The race had a constant
slope of about between 4% and 5%. It’s an up and down knee breaker
route which also had a lot of wind blowing so we had descend using
drafting [the technique of following each other to reduce wind resist-
ance]” says Guillermo Porrero.
His love of the sport began in high school where he joined a track and
field team, competing in cross country events as well as within stadi-
ums. His aeronautical engineering studies in Madrid forced him to stop,
but when he graduated, he reprised his love of the sport along with his
brother. “It was five or six years ago when I started competing in open
races around Madrid, such as the Saint Silvester, and from then I began
to go much harder with my bike,” recalls Guillermo.
The cross-country Duathlon in Villacañas attracts registrants and fans
in each edition. “Each year more and more people are excited to come,
and every time there is more of an audience. The atmosphere is fun and
enthusiasm of the public motivates you,” he says. It was a weekend full
of sports activities and time to enjoy the company of friends. “I did not
run alone; rather I encouraged some friends to stay for the weekend
and to run with me.” All in all, a fantastic weekend in the heart of La
Mancha.
Our workmate Guillermo Porrero participated in
the IV Duathlon Cross in the Spanish municipal of
Villacañas (Toledo).
The CT Engineering Group 34
index35 The CT Engineering Group
CORPORATE SOCIAL RESPONSIBILITY
CT EMPLOYEES
COMMITMENT
TO SOCIETY
Two volunteer projects were discussed by the board of directors at The
CT Engineering Group. The first consists of developing a Maintenance
Drip Irrigation System in Nariokotome, a remote region in Turkana
(northern Kenya) where the majority of the population is illiterate. For
this reason the design of graphic and visual manuals will allow them to
be self-sufficient in maintaining the system.
The second project consists of donating computer equipment to a com-
munity in Inharrime (Mozambique) in collaboration with the NGO “Friends
of Inharrime.” The goal is that these computers are used as education
tools that break the circle of poverty in which the community lives.
During the last CT board meeting, it was agreed to support these vol-
unteering actions and to encourage corporate social responsibility
actions. The board maintained the objective is to “get the voluntary
commitment of people from the company that are interested in dedicat-
ing part of their time to social causes.”
Volunteer projects should be sustainable and, where possible, be relat-
ed with the activities of The CT Engineering Group. The decision of
participating in a project must be completely free, voluntary and coordi-
nated/directed by the participants of the project. All volunteer projects
will be analyzed by the board and will be supported financially by them
if necessary.
The board of directors of The CT
Engineering Group has supported two
volunteer projects promoted by CT
employees, showing their commitment to fostering these types of initiatives
and strengthening their sense of corporate social responsibility.
indexThe CT Engineering Group 36
RECOGNITION
JESÚS PRIETO
RECEIVES AN
AWARD FROM
THE ALUMNI
ASSOCIATION
ETSII – UPM
The Alumni Association ETSII-UPM recognized Jesús Prieto, president of The CT Engineering Group, with the
award ‘Entrepreneurial Industrial Engineer’. The award from the Alumni Association recognizes the excellent
work Jesús has carried out in Engineering Consulting services. The panel highlighted the entrepreneurial
attitude that is required to convert The CT Engineering Group into a reference company for product design
engineering, manufacturing and after-sales support. Carlos Mira, president and founder of Cre100do and in
charge of presenting the award, emphasized “the company possesses the capacity to identify opportunities
to differentiate themselves from the competition and to contribute value to clients as well as employees.”
Jesús accepted the award and maintained, “I must share this privilege with all of those who have supported
me throughout these years to build The CT Engineering Group.” During his speech he elaborated on the
importance of being surrounded by a such a great team in order to turn the company into a reference within
the industrial sector. Today, The CT Engineering Group has 1,497 employees, operates in four continents
and made 115 million euros this year.
The seventh edition of these awards took place in the headquarters of ‘The School of Industrial Engineering’
(Escuela Técnica Superior de Ingenieros Industriales – ETSII) which has become a professional meeting
place where many generations of alumni and professors from the school gather. The awards were headed
by the chancellor of the Technical University of Madrid (UPM), Guillermo Cisneros, and by the director of The
School of Industrial Engineering (ETSII), Emilio Mínguez.
The pannel
highlighted the
entrepeneurial
attitude
Joan Font, Jesús Prieto
and Vicente Egea
index37 The CT Engineering Group
CT INGENIEROS RANKED
50TH ON THE LIST OF THE
TOP 100 “BEST COMPANIES
TO WORK” IN SPAIN
The finance magazine Actualidad Económica has published its annual ranking with the
best 100 companies to work for in Spain. CT Ingenieros came in at 50 and is the first
company dedicated to engineering services to appear on the list. This ranking evaluates
multinational companies and other big companies on merits such as good working prac-
tices, labor relations and corporate responsibility.
Independent evaluators valued the good work environment at CT Ingenieros and admired
the care and attention to “training and employee development” that CT provides. The
evaluators also appreciated CT´s internal communication tool: “CT, Innovation & Improve-
ment Ideas”, renamed, after the new design of the corporative intranet CT Insider, as
“Share your ideas for CT”. This tool allows all workers to be able to share their ideas with
all corporate departments.
The evaluation methodology measured six categories: talent management, payment
and salary, work conditions, corporate social responsibility, training and employees.
This ranking motivates us to continue our process of growth and internationalization,
remaining loyal to our goals and our corporate philosophy: CT, a place where engineers
love to work.
This ranking
motivates us to
continue our process of growth and internationalization, remaining loyal
to our goals and our corporate philosophy: CT, a place where engineers
love to work.
RECOGNITION
indexThe CT Engineering Group 38
CT AEROCOMP BECOMES
CT ENGINEERING GROUP UK
AND OPENS NEW OFFICE
CT INGENIEROS SIGNS ITS
FIRST NEARSHORING CONTRACT
WITH ASAP ENGINEERING
Due to this change our brand image remains consistent and reflects the unity of the entire group. The office
in Bristol (Bristol and Bath Science Park, Dirac Crescent, Emmerson Green) allows it to be closer to custom-
ers in a building that is exclusively designed for engineering and science companies.
Currently the CT Engineering group UK has 16 engineers spread across Airbus R&T, National Composite
Centre, Airbus F&DT, Training and research and development.
The CT Engineering group UK specializes in design & analysis of composites and manufacturing support
and training for all areas of engineering. It also has an ongoing UK research project looking at automatic
ultrasonic welding of thermoplastics.
The client, Automotive System And Projects
(ASAP), is present in nine locations and employs
1,000 people. Using its expertise and know-how
ASAP is constantly widening new technological
fields and providing innovative solutions.
The mission of this first in-house project is to
design the harness for all C-BEV electrical vehicle
components for Audi. Reaching this milestone, CT
Ingenieros de Catalunya achieves one of the goals
set in its Strategic Expansion Plan.
CT Aerocomp has opened a new office and changed
its name to CT engineering group UK.
CORPORATE NEWS
index39 The CT Engineering Group
CORPORATE NEWS
CT IS RESPONSIBLE FOR BIM
MODELS OF THE LARGEST
SHOPPING MALL IN ANDALUSIA
Building information modeling (BIM) is a process involving the generation and manage-
ment of digital representations of physical and functional characteristics of places.
Building information models (BIMs) are files (often but not always in proprietary formats
and containing proprietary data) which can be extracted, exchanged or networked to sup-
port decision-making regarding a building or other built asset. Current BIM software is
used by individuals, businesses and government agencies who plan, design, construct,
operate and maintain diverse physical infrastructures, such as water, wastewater, elec-
tricity, gas, refuse and communication utilities, roads, bridges, ports and tunnels.
In addition, CT AEC is involved in the structures for the new Palace of Justice in Paris,
designed by Renzo Piano, one of the best architects in the world.
CT AEC (Architecture, Engineering and Construction) is
responsible for the quality of the BIM models of the largest
shopping mall in Andalusia (Torremolinos, Málaga). The project
is expected to reach a total investment of 1,200 million euros.
indexindexIdentifikace uložené verze
SHA-256: 99711fe717b6ae1a0eeecb38081c31454933f46c5b0ccc4bd87ac3cfea86e318