BVLOS flights completed successfully 0 high-voltage power lines inspected 0km total distance flown by aircraft 0km Elia Group operates over 8,000 kilometres of high-voltage electricity transmission infrastructure across Belgium. Inspecting that network safely, frequently, and at scale is one of the defining operational challenges in European energy infrastructure. The problem Helicopter patrols are the current benchmark for high-voltage grid inspection. They are thorough but expensive, manual, infrequent, and dependent on weather and airspace availability. Ground crews offer detail but cannot cover the distances required. Static camera systems provide no mobility and lack a view of the top of pylons or wires. Elia recognised that the traditional inspection model could not scale to meet the demands of a digitised, reliability-critical grid. Their long-term target: conduct 80% of asset monitoring remotely. The specific challenges were: Coverage: VLOS drone operations can only inspect small clusters of pylons at a time, nowhere near viable for a network of this scale Regulatory complexity: BVLOS operations over high-voltage infrastructure across national borders had never been validated in this configuration Data quality: Inspection data needed to meet Elia's own technical standards for fault detection, not just produce imagery, but actionable intelligence The solution Avy and Elia designed a structured Proof of Concept (PoC) to test whether BVLOS drone operations could meet the standard required for operational deployment across Elia's grid. The programme ran across four modules: BVLOS flight validation, advanced sensor payload testing, remote operations and docking demonstration, and AI-driven data analysis. Aircraft and sensors The Avy Aera 4 flew the primary inspection routes, carrying the Raptor (AirAware Camera) for combined optical and thermal imaging, enabling detection of both visual defects and heat anomalies such as overheating insulators. Avy employed a YellowScan LiDAR device, capturing high-density 3D point clouds for precise pylon geometry and terrain mapping Regulatory framework Operating BVLOS in Belgian airspace under Avy's Dutch LUC required a Cross-Border Operations application to the Belgian Civil Aviation Authority (BCAA), real-time coordination with the Belgian Ministry of Defence for airspace deconfliction, and a full local conditions assessment. This was the first time Avy's LUC privileges had been validated cross-border at this scale, a regulatory milestone as significant as the technical one. AI analysis Post-flight data was processed through the Arkensight platform, where every image was spatially mapped to the specific pylon ID in Elia's asset register. AI models were trained on the collected dataset to automatically detect anomalies Vegetation encroachment Corrosion Broken insulators, and Thermal hotspots Bird nests Graded by severity and linked directly to individual assets for ingestion into Elia's asset management system, directly triggering actions in the asset management systems used by TSO’s. The results The PoC completed a dedicated week of flight operations in December 2025, in sub-zero temperatures and high humidity, with only one day lost to weather. 8 BVLOS flights completed 261.6 km total distance flown 85 km of high-voltage power lines inspected 3 hours 42 minutes total flight time 42% average battery usage per flight Cross-border BVLOS approval secured and validated with BCAA LiDAR mapped vegetation encroachment and identified structural detail at pylon level AI anomaly detection pipeline established and linked to Elia's asset register "Flying 261 kilometres of BVLOS inspection in a week, in December, in Belgian airspace, under a cross-border regulatory framework we'd never used before, was genuinely demanding. The fact that we came away with data, no incidents, and a validated regulatory pathway is what makes this a meaningful step forward for grid inspection at scale." Avy Warwick Tucker, Project Manager "Flying 261 kilometres of BVLOS inspection in a week, in December, in Belgian airspace, under a cross-border regulatory framework we'd never used before, was genuinely demanding. The fact that we came away with data, no incidents, and a validated regulatory pathway is what makes this a meaningful step forward for grid inspection at scale." Avy Warwick Tucker, Project Manager What this means for energy infrastructure operators The Elia PoC demonstrated that BVLOS drone inspection is not a future capability, it is possible, under existing European regulatory frameworks, at distances and scales that make it a genuine alternative to helicopter patrols. For transmission system operators managing thousands of kilometres of overhead infrastructure, the combination of long-range VTOL aircraft, autonomous docking, and AI-driven analysis changes the economics of line missions such as; emergency response. Talk to us about your infrastructure Speak to an expert Popular links Popular links Use case Remote monitoring Use case Intelligent surveillance Industries Avy > Ports
Identifikace uložené verze
SHA-256: 01d7f72d7b8e9e1b8c9ac4b86fe76b8c96928efa425edbc5029d884873bced5d